Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 27 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Spori Annex and Parking Lot 20014A BYU - Idaho Mill's Concrete 06/18/2020 Sunny 10:00 AM 75 12:00 PM I arrived on site at approximately 10:00 AM. I observed that the contractor had compacted in preparation for the concrete pour. I observed that the contractor had placed the steel reinforcement in general conformance with project documents. I also observed the contractor utilizing a vibrator to consolidate the materials. I also tested densities along the North end of the parking lot above the drainage system. I observed the contractor utilizing a smooth drum roller to achieve compaction. I also observed the contractor excavate down to the bedrock in preparation to place the pipe. I observed the contractor to be in general conformance to project documents. Eli Jenkins Digitally signed by Eli Jenkins Date: 2020.06.19 07:36:31 -06'00'8129697 Steel Reinforcement Steel Reinforcement Steel Reinforcement D. Aust Page 2 of 2 Description: Description: Description: Description: Additional Comments: Trench under road, bedrock at bottom Trench under road, bedrock at bottom Trench under road, bedrock at bottom