HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 27 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Spori Annex and Parking Lot
20014A
BYU - Idaho
Mill's Concrete 06/18/2020
Sunny
10:00 AM
75
12:00 PM
I arrived on site at approximately 10:00 AM. I observed that the contractor had compacted in preparation
for the concrete pour. I observed that the contractor had placed the steel reinforcement in general
conformance with project documents. I also observed the contractor utilizing a vibrator to consolidate the
materials. I also tested densities along the North end of the parking lot above the drainage system. I
observed the contractor utilizing a smooth drum roller to achieve compaction. I also observed the
contractor excavate down to the bedrock in preparation to place the pipe.
I observed the contractor to be in general conformance to project documents.
Eli Jenkins Digitally signed by Eli Jenkins
Date: 2020.06.19 07:36:31
-06'00'8129697
Steel Reinforcement Steel Reinforcement Steel Reinforcement
D. Aust
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments:
Trench under road, bedrock at bottom Trench under road, bedrock at bottom
Trench under road, bedrock at bottom