HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 25 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Spori Annex and Parking Lot
20014A
BYU - Idaho
Thompson Construction 06/22/2020
Sunny
7:30 AM
80
5:30 PM
I arrived on site at approximately 7:45 AM. I observed the contractor backfilling along the storm drain
trench. I observed that the material was a 3/8" minus material and that it was compacted using a jumping
jack. I observed that approximately 6" above the pipe, the contractor began using pit run to backfill. At
which point, the contractor began using a smooth double drum roller to achieve compaction. I observed
that the compaction was in general conformance with project documents.
Eli Jenkins Digitally signed by Eli Jenkins
Date: 2020.06.23 08:28:26
-06'00'8129697
D. Aust