Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 25 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Spori Annex and Parking Lot 20014A BYU - Idaho Thompson Construction 06/22/2020 Sunny 7:30 AM 80 5:30 PM I arrived on site at approximately 7:45 AM. I observed the contractor backfilling along the storm drain trench. I observed that the material was a 3/8" minus material and that it was compacted using a jumping jack. I observed that approximately 6" above the pipe, the contractor began using pit run to backfill. At which point, the contractor began using a smooth double drum roller to achieve compaction. I observed that the compaction was in general conformance with project documents. Eli Jenkins Digitally signed by Eli Jenkins Date: 2020.06.23 08:28:26 -06'00'8129697 D. Aust Page 2 of 2 Description: Description: Description: Description: Additional Comments: