HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 24 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Spori Annex and Parking Lot 20014A BYU - Idaho Thompson Excavation 06/23/2020 Sunny 7:30 AM 85 6:00 PM I arrived on site at approximately 8:00 AM. I observed the contractor backfilling and compacting the storm drain trench on 2nd South. The means and methods of compaction were a double drum smooth roller, and a jumping jack for small areas and around the pipe. I observed the contractor make 4-6 vibrating passes. I also observed that a fire hose was used to add moisture. At approximately 1:00 PM I observed the contractor begin grading and compacting the pad inside of the building in preparation for concrete. I observed the same means and methods in the building that I observed in the storm drain trench. I observed that work done was in general conformance with project documents. Eli Jenkins Digitally signed by Eli Jenkins Date: 2020.06.24 08:46:51 -06'00'8129697 D. Aust Page 2 of 2 Description: Description: Description: Description: Additional Comments: