Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 22 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Spori Annex and Parking Lot 20014A BYU - Idaho Mill's Concrete 06/25/2020 Intermittent rain 6:00 AM 75 8:00 AM I arrived on site at approximately 6:30 AM. I set up my concrete testing equipment and began my observations. I observed that the contractor had prepared the site with steel reinforcement and that the reinforcement appeared to be in general conformance with project documents. I tested the concrete and observed that it was within general conformance to project documents. I stayed for the duration of the concrete pour and observed that the contractor utilized a vibrator to consolidate the concrete. Eli Jenkins Digitally signed by Eli Jenkins Date: 2020.06.26 08:39:46 -06'00'8129697 Steel reinforcement and concrete forms Steel reinforcement and concrete forms D. Aust Page 2 of 2 Description: Description: Description: Description: Additional Comments: