HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 22 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Spori Annex and Parking Lot
20014A
BYU - Idaho
Mill's Concrete 06/25/2020
Intermittent rain
6:00 AM
75
8:00 AM
I arrived on site at approximately 6:30 AM. I set up my concrete testing equipment and began my
observations. I observed that the contractor had prepared the site with steel reinforcement and that the
reinforcement appeared to be in general conformance with project documents. I tested the concrete and
observed that it was within general conformance to project documents. I stayed for the duration of the
concrete pour and observed that the contractor utilized a vibrator to consolidate the concrete.
Eli Jenkins Digitally signed by Eli Jenkins
Date: 2020.06.26 08:39:46
-06'00'8129697
Steel reinforcement and concrete forms Steel reinforcement and concrete forms
D. Aust
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments: