HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 21 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Spori Annex and Parking Lot
20014A
BYU - Idaho
Thompson Excavation 06/25/2020
Intermittent Rain
8:00 AM
75
4:00 PM
I began testing the compaction on 2nd South at approximately 8:00 AM after observing the concrete pour
at the same site. I observed that the contractor was demolishing and removing old sidewalk that had been
damaged due large machinery driving over it. I observed that the contractor compact the native material
and 3/4 base material that was under the old sidewalk. I observed that most of it was adequate material for
reuse. The areas where it was not adequate I asked to be replaced by new material from the contractor. I
observed the contractor achieve compaction by utilizing a hoe pack and a plate compactor.
Eli Jenkins Digitally signed by Eli Jenkins
Date: 2020.06.26 08:42:05
-06'00'8129697
D. Aust
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments: