Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 21 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Spori Annex and Parking Lot 20014A BYU - Idaho Thompson Excavation 06/25/2020 Intermittent Rain 8:00 AM 75 4:00 PM I began testing the compaction on 2nd South at approximately 8:00 AM after observing the concrete pour at the same site. I observed that the contractor was demolishing and removing old sidewalk that had been damaged due large machinery driving over it. I observed that the contractor compact the native material and 3/4 base material that was under the old sidewalk. I observed that most of it was adequate material for reuse. The areas where it was not adequate I asked to be replaced by new material from the contractor. I observed the contractor achieve compaction by utilizing a hoe pack and a plate compactor. Eli Jenkins Digitally signed by Eli Jenkins Date: 2020.06.26 08:42:05 -06'00'8129697 D. Aust Page 2 of 2 Description: Description: Description: Description: Additional Comments: