Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 2 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Spori Annex and Parking Lot 20014A BYU - Idaho Thompson Excavation and As 09/22/2020 Sunny Cool 8:00 AM 55.6 11:30 AM I arrived at the site at about 8:30 AM and began my observations of the Concrete Reinforcement and Concrete placement for sidewalk for the SW portion of the Spori Annex Parking lot. I checked the re-bar and confirmed it was in general conformance to project documents, then waited for the first concrete truck to arrive. The truck arrived at about 9:00 AM and I then began my testing. I observed the concrete was in general conformance to project documents and the pour went smoothly. I observed that the contractor was within general conformance to the project documents. Eli Jenkins Digitally signed by Eli Jenkins Date: 2020.09.24 08:16:35 -06'00'8129697 Concrete Reinforcement Concrete Reinforcement Concrete Placement L. Steiner Page 2 of 2 Description: Description: Description: Description: Additional Comments: Concrete Placement Concrete Placement