Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 19 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Spori Annex and Parking Lot 20014A BYU - Idaho Big-D 07/09/2020 Sunny 3:30 PM 85 5:30 PM I arrived on site at approximately 3:45 PM. I observed that the contractor had prepared the holes for the bolts near the Northeast corner of the building. I observed that the holes had been drilled and that they were clean and free of dust and debris. I observed that the epoxy was not expired. I observed the contractor place the epoxy, and the bolts into the holes in the concrete. I also observed that there was epoxy up to the top of the holes. I observed the epoxy and bolt placement was in general conformance to project documents. Eli Jenkins Digitally signed by Eli Jenkins Date: 2020.07.14 07:53:47 -06'00'8129697 Bolts set in epoxy Bolts set in epoxy Expiration date of 03/12/21 D. Aust Page 2 of 2 Description: Description: Description: Description: Additional Comments: Expiration date of 03/12/21