HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 18 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Spori Annex and Parking Lot
20014A
BYU - Idaho
Elite Steel Erection 07/16/2020
Sunny
10:00 AM
85
11:00 AM
I began the welding inspection at approximately 10:00 AM. I went onto the roof of the annex building, and
began my observations. I observed that all of the decking had been fastened to the joists all the way
across. I also observed that the seams between each sheet of decking had been crimped together
approximately every 6"-9". I observed that the work done appeared to be in general conformance with
project documents.
Eli Jenkins Digitally signed by Eli Jenkins
Date: 2020.07.17 11:03:46
-06'00'8129697
Decking fastened to joists with nails Decking fastened to joists with nails Decking fastened to joists with nails
D. Aust
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments:
Decking fastened to joists with nails Decking fastened to joists with puddle welds
Decking fastened to joists with puddle welds