Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 18 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Spori Annex and Parking Lot 20014A BYU - Idaho Elite Steel Erection 07/16/2020 Sunny 10:00 AM 85 11:00 AM I began the welding inspection at approximately 10:00 AM. I went onto the roof of the annex building, and began my observations. I observed that all of the decking had been fastened to the joists all the way across. I also observed that the seams between each sheet of decking had been crimped together approximately every 6"-9". I observed that the work done appeared to be in general conformance with project documents. Eli Jenkins Digitally signed by Eli Jenkins Date: 2020.07.17 11:03:46 -06'00'8129697 Decking fastened to joists with nails Decking fastened to joists with nails Decking fastened to joists with nails D. Aust Page 2 of 2 Description: Description: Description: Description: Additional Comments: Decking fastened to joists with nails Decking fastened to joists with puddle welds Decking fastened to joists with puddle welds