HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 17 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Spori Annex and Parking Lot
20014A
BYU - Idaho
Big-D 07/21/2020
Sunny, Hot
2:30 PM
85
6:00 PM
I arrived on site at approximately 2:30PM. When I arrived I noticed they already had the foam board and
the first lift of gilsulate in the forums. I observed that the gilsulate was adequately consolidated. They then
added another lift and I did the same thing. They then finished it off and put the foam board over the top.
Then the contractor put the plastic covering on top. The contractor was in general conformance to project
documents.
Digitally signed by Jacob P Christensen
Date: 2020.07.22 09:20:56 -06'00'
N. Steiner
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments: