Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 16 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Spori Annex and Parking Lot 20014A BYU - Idaho Thompson Excavation 7/15/2020 Sunny 3:30 85 6:00 I arrived at the site at about 4:00 PM and began my Observations. The soil that they were compacting could not be tested with the gage due to the fact that it did not have a proctor because it was a mix between pit run and 3/4" Base. Because of this I was unable to properly test the compaction so I observed that placement and the compaction. I observed the contractor place and compact the material consistent with previous efforts. I observed the contractor was in general conformance to project documents. Eli Jenkins Digitally signed by Eli Jenkins Date: 2020.07.16 07:27:37 -06'00'8129697 L. Steiner Page 2 of 2 Description: Description: Description: Description: Additional Comments: