Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 15 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Spori Annex and Parking Lot 20014A BYU - Idaho Big-D 7/17/2020 Sunny, windy 9:00 AM 86 4:30 PM I arrived on site at 9:00 AM. I observed the contractor put the foam insulation barriers for the gilsulate to be poured into around the steam line and also put insulation around the bends of the steam line. They then poured the gilsulate in two lifts and vibrate both lifts. they then topped off the gilsulate and smoothed it. they proceeded to put the foam insulation on top and add the plastic on top of that. The contractors were in general conformance to project documents. Digitally signed by Jacob P Christensen Date: 2020.07.21 14:48:27 -06'00' N.Steiner Page 2 of 2 Description: Description: Description: Description: Additional Comments: