HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 15 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Spori Annex and Parking Lot
20014A
BYU - Idaho
Big-D 7/17/2020
Sunny, windy
9:00 AM
86
4:30 PM
I arrived on site at 9:00 AM. I observed the contractor put the foam insulation barriers for the gilsulate to be
poured into around the steam line and also put insulation around the bends of the steam line. They then
poured the gilsulate in two lifts and vibrate both lifts. they then topped off the gilsulate and smoothed it.
they proceeded to put the foam insulation on top and add the plastic on top of that. The contractors were in
general conformance to project documents.
Digitally signed by Jacob P Christensen
Date: 2020.07.21 14:48:27 -06'00'
N.Steiner
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments: