Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 14 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Spori Annex and Parking Lot 20014A BYU - Idaho Big-D Construction 08/17/2020 Hot and Sunny 1:30 95.7 3:30 I arrived at the site at about 1:30 pm and began my inspection. When the truck came the contractor began the pour, but halfway through, ran out of concrete so the pour was stopped and another truck was ordered. When the next truck showed up the pour resumed and was able to be finished. I made sure that the contractor was in conformance to project documents. William Moffat Digitally signed by William Moffat Date: 2020.08.18 09:29:23 -06'00'8129697 alternate method of concrete placement electrical conduits before pour L. Steiner Page 2 of 2 Description: Description: Description: Description: Additional Comments: