Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Spori Annex and Parking Lot
20014A
BYU - Idaho
Big-D Construction 08/17/2020
Hot and Sunny
1:30
95.7
3:30
I arrived at the site at about 1:30 pm and began my inspection. When the truck came the contractor began
the pour, but halfway through, ran out of concrete so the pour was stopped and another truck was ordered.
When the next truck showed up the pour resumed and was able to be finished. I made sure that the
contractor was in conformance to project documents.
William Moffat Digitally signed by William Moffat Date: 2020.08.18 09:29:23 -06'00'8129697
alternate method of concrete placement electrical conduits before pour
L. Steiner
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments: