HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 13 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Spori Annex and Parking Lot
20014A
BYU - Idaho
Thompson Excavation 07/01/2020
Slightly Cloudy
4:15 AM
70
12:00 PM
I arrived on site at approximately 4:40 AM. I performed a walkthrough and observed that the contractor had
prepared the site for the concrete pour. The location of the pour was slab on grade for the floor of the Spori
Annex Building. I tested three different trucks.
5:00 AM- Truck 1 was within project specifications
7:00 AM- Truck 6 was within project specifications
9:00 AM- truck 9 had a high slump, I informed the project superintendent and the contractor and they
decided to accept the concrete.
Throughout the duration of the pour, I observed the contractor request to the concrete truck drivers that
they add more water to their mix, even after the slump test was performed. I informed the truck drivers that
per the specifications they were not allowed to add water on site. I informed them that if they did try to
water down the concrete, I would reject that truck. There was no superplastisizer in the mix, and they were
using a pump truck. I stayed for the duration of the pour, and ensured that no water was added.
I also tested the sidewalk concrete for Thompson Excavation on 2nd South. I observed that the concrete
was within project specifications.
10:00 AM-12:00 PM
Eli Jenkins Digitally signed by Eli Jenkins
Date: 2020.07.06 08:39:45
-06'00'8129697
Concrete Forms and steel reinforcement Concrete Forms and steel reinforcement Concrete Forms and steel
reinforcement
D. Aust
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments:
Concrete Forms and steel reinforcement