HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 12 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Spori Annex and Parking Lot
20014A
BYU - Idaho
Thompson Excavation 07/06/2020
Sunny
7:00 AM
75
10:45 AM
I arrived on site at approximately 8:00 AM. I observed that the contractor was backfilling along the
stormwater line on the North end of the Annex building. I observed the contractor backfill approximately 50'
of the line in two lifts. The contractor utilized a smooth drum double roller to achieve compaction. I also
observed the contractor grading on 2nd South to prepare for paving tomorrow. I observed the contractor
use the same roller to achieve compaction there. I also observed that the contractor made 4-5 passes in
each area with the roller.
Spori Annex - 3.75 hrs