HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 12 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Spori Annex and Parking Lot 20014A BYU - Idaho Thompson Excavation 07/06/2020 Sunny 7:00 AM 75 10:45 AM I arrived on site at approximately 8:00 AM. I observed that the contractor was backfilling along the stormwater line on the North end of the Annex building. I observed the contractor backfill approximately 50' of the line in two lifts. The contractor utilized a smooth drum double roller to achieve compaction. I also observed the contractor grading on 2nd South to prepare for paving tomorrow. I observed the contractor use the same roller to achieve compaction there. I also observed that the contractor made 4-5 passes in each area with the roller. Spori Annex - 3.75 hrs Eli Jenkins Digitally signed by Eli Jenkins Date: 2020.07.07 08:14:48 -06'00'8129697 D. Aust Page 2 of 2 Description: Description: Description: Description: Additional Comments: