Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 11 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Spori Annex and Parking Lot 20014A BYU - Idaho Elite Steel 07/09/2020 Clear 1:00 PM 75 5:00 PM I arrived on site and began my observations of the steel structure. I observed that the contractor had completed the majority of the erection and welding work. I observed that the full penetration welds had been completed and were in tolerance of the project documents. I observed that the joists were in place and welded to the beams with fillet welds on each side. The contractor had also placed the majority of the bridging. I observed that the contractor had drilled holes for one of the base plates at grid line F:4. I notified the contractor to let us know when they would be epoxying these in place so we could observe this process. No deficiencies were noted. Digitally signed by Jacob P Christensen Date: 2020.07.31 15:00:09 -06'00'8129697 J. Christensen Page 2 of 2 Description: Description: Description: Description: Additional Comments: