Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 10 - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Spori Annex and Parking Lot 20014A BYU - Idaho Big-D 08/17/2020 hot 1:30 PM 93 3:45 PM I arrived on site at approximately 1:30 PM. I observed the contractor look at the forums to make sure they were in tact before they poured the red concrete. When the mix arrived the contractor began to pour the concrete around the conduits as they vibrated it to compact the material. The contract was in general conformance to project documents. William Moffat Digitally signed by William Moffat Date: 2020.08.18 09:27:25 -06'00'8129697 N. Steiner Page 2 of 2 Description: Description: Description: Description: Additional Comments: