HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Spori Annex and Parking Lot
20014A
BYU - Idaho
Thompson 09/29/2020
Sunny
7:30 AM
32
11:00 AM
I arrived on site at 7:45 AM and observed that the steel reinforcement was in general compliance with the
project documents. I started the tests at 8:30 AM and the results were with in the set limits and let the
foreman know. I then observed that the duration of the pour.
Digitally signed by Jacob P Christensen
Date: 2020.09.30 10:37:13 -06'00'
William Moffat
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments: