Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION - 19-00727 - Spori Annex - Ceramic & Sculpture LabsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Spori Annex and Parking Lot 20014A BYU - Idaho Thompson 09/29/2020 Sunny 7:30 AM 32 11:00 AM I arrived on site at 7:45 AM and observed that the steel reinforcement was in general compliance with the project documents. I started the tests at 8:30 AM and the results were with in the set limits and let the foreman know. I then observed that the duration of the pour. Digitally signed by Jacob P Christensen Date: 2020.09.30 10:37:13 -06'00' William Moffat Page 2 of 2 Description: Description: Description: Description: Additional Comments: