HomeMy WebLinkAboutCOMCHECK - 18-00034 - 1160 Bond Ave - Dish One Satellite - New Building6 COMcheck Software Version 4.0.2.8
�( Envelope Compliance Certificate
Project Information
Energy Code:
2015 IECC
Project Title:
Dish One Satellite
Location:
Rexburg, Idaho
Climate Zone:
6b
Project Type:
New Construction
Vertical Glazing / Wall Area:
10%
Construction Site: Owner/Agent: Designer/Contractor:
JRW & Associates, PLLC
1152 Bond Ave
Rexburg, ID
Building Area Floor Area
1 -Gym (Gymnasium) : Nonresidential 9370
2 -Tenant Space (Office) : Nonresidential 2067
3 -Dish One Office (Office) : Nonresidential 6322
4 -Receiving (Warehouse) : Nonresidential 1135
Additional Efficiency Package
High efficiency HVAC. Systems that do not meet the performance requirement will be identified in the mechanical requirements checklist
report.
Envelope Assemblies
Assembly
Gross Area
Cavity
Cont.
Proposed
Budget U.
or
R -Value
R -Value
U -Factor
Factors.)
Product ID storefront, SHGC 0.34, PF 0.30, [Bldg. Use 2 - Tenant
Perimeter
Space] (c)
Roof 1: Metal Building, Standing Seam, Filled Cavity with Thermal
9370
38.5
11.0
0.028
0.031
Blocks (e), [Bldg. Use 1 - Gym]
Tenant Space] (c)
Roof 2: Metal Building, Standing Seam, Filled Cavity with Thermal
2067
38.5
11.0
0.028
0.031
Blocks (e), [Bldg. Use 2 - Tenant Space]
Tenant Space] (c)
Roof 3: Attic Roof with Wood Joists, [Bldg. Use 3 - Dish One Office]
6322
60.0
0.0
0.017
0.021
Roof 4: Attic Roof with Wood Joists, [Bldg. Use 4 - Receiving]
1135
60.0
0.0
0.017
0.021
Floor 1: Slab-On-Grade:Unheated, Horizontal with vertical 3 ft., [Bldg.
674
---
10.0
0.378
0.441
Use 2 - Tenant Space] (d)
NORTH
Tenant North: Other Metal Building Wall, [Bldg. Use 2 - Tenant
1318 --- ---
0.055
0.052
Space] (b)
Window'E': Metal Frame with Thermal Break:Fixed, Pert. Specs.:
64 --- ---
0.355
0.360
Product ID storefront, SHGC 0.34, PF 0.30, [Bldg. Use 2 - Tenant
Space] (c)
Window'E' copy 1: Metal Frame with Thermal Break:Fixed, Pert.
64 --- ---
0.355
0.360
Specs.: Product ID storefront, SHGC 0.34, PF 0.30, (Bldg. Use 2 -
Tenant Space] (c)
Door 1: Glass (> 50% glazing):Metal Frame, Entrance Door, Pert.
21 --- ---
0.450
0.770
Specs.: Product ID P-CUW-22285, SHGC 0.18, PF 0.30, [Bldg. Use 2 -
Tenant Space] (c)
Project Title: Dish One Satellite
Report date:
01/15/18
Data filename: 5:\Drawings\715-Dish 1\Dish One.cck
Page
1 of 11
Assembly
Door 1 copy 1: Glass (> 50%glazing):Metal Frame, Entrance Door,
Pert. Specs.: Product ID P-CUW-22285, SHGC 0.18, PF 0.30, [Bldg.
Use 2 - Tenant Space] (c)
Gym North Wall: Other Metal Building Wall, [Bldg. Use 1 - Gym] (b)
Receiving North: Wood -Framed, 16" o.c., [Bldg. Use 4 - Receiving]
Window'D': Metal Frame with Thermal Break:Fixed, Pert. Specs.:
Product ID storefront, SHGC 0.34, PF 1.33, [Bldg. Use 4 -
Receiving] (c)
Window'D' copy 1: Metal Frame with Thermal Break:Fixed, Pert.
Specs.: Product ID storefront, SHGC 0.34, PF 1.33, [Bldg. Use 4 -
Receiving] (c)
EAST
Tenant East Wall: Other Metal Building Wall, [Bldg. Use 2 - Tenant
Space] (b)
Gym East Wall: Metal Building Wall, Double Layer Mineral Fiber, [Bldg.
Use 1 -Gym]
Window C: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID storefront, SHGC 0.34, [Bldg. Use 1 - Gym] (c)
Window C copy 1: Metal Frame with Thermal Break:Fixed, Pert. Specs.:
Product ID storefront, SHGC 0.34, [Bldg. Use 1 - Gym] (c)
Door 3: Insulated Metal, Swinging, [Bldg. Use 1 - Gym]
Office -Receiving East: Wood -Framed, 16" o.c., [Bldg. Use 3 - Dish One
Office]
Window F: Metal Frame with Thermal Break:Fixed, Pert. Specs.:
Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c)
Window F copy 1: Metal Frame with Thermal Break:Fixed, Pert. Specs.:
Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c)
Window F copy 2: Metal Frame with Thermal Break:Fixed, Pert. Specs.:
Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c)
Window F copy 3: Metal Frame with Thermal Break:Fixed, Pert. Specs.:
Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c)
Window F copy 4: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c)
Window F copy 5: Metal Frame with Thermal Break:Fixed, Pad. Specs.:
Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c)
Overhead Dr: Insulated Metal, Non -Swinging, [Bldg. Use 3 - Dish One
Office]
Overhead Dr copy 1: Insulated Metal, Non -Swinging, [Bldg. Use 3 -
Dish One Office]
Door 6: Insulated Metal, Swinging, [Bldg. Use 3 - Dish One Office]
Office EIFS East: Wood -Framed, 16" o.c., [Bldg. Use 3 - Dish One
Office]
SOUTH
Office South EIFS: Wood -Framed, 16" o.c., [Bldg. Use 3 - Dish One
Office)
Window W: Metal Frame with Thermal Break:Fixed, Pert. Specs.:
Product ID storefront, SHGC 0.34, PF 0.30, [Bldg. Use 3 - Dish One
Office] (c)
Window'A' copy 1: Metal Frame with Thermal Break:Fixed, Pert.
Specs.: Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One
Office] (c)
Window'A' copy 2: Metal Frame with Thermal Break:Fixed, Pert.
Specs.: Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One
Office] (c)
Office South: Wood -Framed, 16" o.c., [Bldg. Use 3 - Dish One Office]
Window F copy 3: Metal Frame with Thermal Break:Fixed, Pert. Specs.:
Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c)
Project Title: Dish One Satellite
Data filename: S:\Drawings\715-Dish 1\Dish One.cck
Gross Area Cavity Cont. Proposed Budget U -
or R -Value R -Value U -Factor Factor(.)
Perimeter
21 --- --- 0.450 0.770
660 --- --- 0.055 0.052
640 21.7 3.0 0.050 0.051
32 --- --- 0.355 0.360
32 --- --- 0.355 0.360
449
---
---
0.055
0.052
2516
25.0
3.5
0.097
0.052
50
---
---
0.355
0.360
50
---
---
0.355
0.360
24
---
---
0.067
0.370
1288
21.7
3.0
0.050
0.051
18
---
---
0.355
0.360
18
---
---
0.355
0.360
18
---
---
0.355
0.360
18
---
---
0.355
0.360
18
---
---
0.355
0.360
18
---
---
0.355
0.360
115
---
---
0.078
0.078
115
---
---
0.078
0.078
24
---
---
0.067
0.370
82
21.7
5.0
0.045
0.051
555
21.7
5.0
0.045
0.051
22
---
---
0.355
0.360
22
---
---
0.355
0.360
22
---
---
0.355
0.360
1000
21.7
3.0
0.050
0.051
18
---
---
0.355
0.360
Report date: 01/15/18
Page 2 of 11
Assembly Gross Area Cavity Cont. Proposed Budget U.
or R -Value R -Value U -Factor Factor(.)
Perimeter
Window F copy 4: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
18 --- ---
0.355 0.360
Product ID storefront, SHGC 0.34, (Bldg. Use 3 - Dish One Office] (c)
Window F copy 4: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
18 --- ---
0.355 0.360
Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c)
Window F copy 5: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
18 --- ---
0.355 0.360
Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c)
22 --- ---
0.355 0.360
Window F copy 5: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
18 --- ---
0.355 0.360
Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c)
Window F copy 6: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
18 --- ---
0.355 0.360
Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c)
Window F copy 6: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
18 --- ---
0.355 0.360
Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c)
22 --- ---
0.355 0.360
Window F copy 7: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
18 --- ---
0.355 0.360
Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c)
Window F copy 7: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
18 --- ---
0.355 0.360
Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c)
Window F copy 8: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
18 --- ---
0.355 0.360
Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c)
1056 21.7 3.5
0.048 0.051
WEST
Office EIFS West: Wood -Framed, 16" o.c., [Bldg. Use 3 - Dish One
555 21.7 5.0
0.045 0.051
Office]
Window'A' copy 1: Metal Frame with Thermal Break:Fixed, Perf.
22 --- ---
0.355 0.360
Specs.: Product ID storefront, SHGC 0.34, PF 0.60, [Bldg. Use 3 - Dish
One Office] (c)
Window'A' copy 2: Metal Frame with Thermal Break:Fixed, Pert.
22 --- ---
0.355 0.360
Specs.: Product ID storefront, SHGC 0.34, PF 0.60, [Bldg. Use 3 - Dish
One Office] (c)
Window'A' copy 3: Metal Frame with Thermal Break:Fixed, Pert.
22 --- ---
0.355 0.360
Specs.: Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One
Office] (c)
Window'A' copy 4: Metal Frame with Thermal Break:Fixed, Perf.
22 --- ---
0.355 0.360
Specs.: Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One
Office] (c)
Door 7: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf.
27 --- ---
0.450 0.770
Specs.: Product ID P-CUW-22285, SHGC 0.18, PF 0.60, [Bldg. Use 3 -
Dish One Office] (c)
Office -Gym Framed West: Wood -Framed, 16" o.c., [Bldg. Use 3 - Dish
1056 21.7 3.5
0.048 0.051
One Office]
Window'A' copy 3: Metal Frame with Thermal Break:Fixed, Perf.
22 --- ---
0.355 0.360
Specs.: Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One
Office] (c)
Window'B': Metal Frame with Thermal Break:Fixed, Perf. Specs.:
10 --- ---
0.355 0.360
Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c)
Wlndow'A' copy 4: Metal Frame with Thermal Break:Fixed, Pert.
22 --- ---
0.355 0.360
Specs.: Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One
Office] (c)
Window W copy 5: Metal Frame with Thermal Break:Fixed, Perf.
22 --- ---
0.355 0.360
Specs.: Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One
Office] (c)
Window'B' copy 1: Metal Frame with Thermal Break:Fixed, Perf.
10 --- ---
0.355 0.360
Specs.: Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One
Office] (c)
Window'B' copy 2: Metal Frame with Thermal Break:Fixed, Pert.
10 --- ---
0.355 0.360
Specs.: Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One
Office] (c)
Gym - West: Other Metal Building Wall, [Bldg. Use 1 - Gym] (b)
3529 --- ---
0.055 0.052
Window'H': Metal Frame with Thermal Break:Fixed, Perf. Specs.:
150 --- ---
0.355 0.360
Product ID storefront, SHGC 0.34, [Bldg. Use 1 - Gym] (c)
Project Title: Dish One Satellite
Report date: 01/15/18
Data filename: S:\Drawings\715-Dish 1\Dish One.cck
Page 3 of 11
Assembly Gross Area Cavity Cont. Proposed Budget U.
or R -Value PI -Value U -Factor Factor(a)
Perimeter
Window C copy 2: Metal Frame with Thermal Break:Fixed, Pert. Specs.:
50 --- ---
0.355
0.360
Product ID storefront, SHGC 0.34, [Bldg. Use 1 - Gym] (c)
Window: Metal Frame with Thermal Break:Fixed, Pert. Specs.: Product
63 --- ---
0.355
0.360
ID storefront, SHGC 0.34, PF 0.72, [Bldg. Use 1 - Gym] (c)
Window C copy 3: Metal Frame with Thermal Break:Fixed, Pert. Specs.:
50 --- ---
0.355
0.360
Product ID storefront, SHGC 0.34, [Bldg. Use 1 - Gym] (c)
Window C copy 4: Metal Frame with Thermal Break:Fixed, Ped. Specs.:
50 --- ---
0.355
0.360
Product ID storefront, SHGC 0.34, [Bldg. Use 1 - Gym] (c)
Door 8: Glass (> 50% glazing):Metal Frame, Entrance Door, Pert.
24 --- ---
0.450
0.770
Specs.: Product ID P-CUW-22285, SHGC 0.16, PF 0.60, [Bldg. Use 1 -
Gym] (c)
Tenant - West: Other Metal Building Wall, [Bldg. Use 2 - Tenant
696 --- ---
0.055
0.052
Space] (b)
Window'E' copy 1: Metal Frame with Thermal Break:Fixed, Perf.
64 --- ---
0.355
0.360
Specs.: Product ID storefront, SHGC 0.34, PF 0.40, [Bldg. Use 2 -
Tenant Space] (c)
Window'E' copy 2: Metal Frame with Thermal Break:Fixed, Ped.
64 --- ---
0.355
0.360
Specs.: Product ID storefront, SHGC 0.34, [Bldg. Use 2 - Tenant
(a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements.
(b) 'Other' components require supporting documentation for proposed U4actors.
(c) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.
(d) Slab -On -Grade proposed and budget U -factors shown in table are F -factors.
(e) Thermal spacer block with minimum R-3.5 must be Installed above the purlin/baa, and the roof deck secured to the purlins.
Envelope Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed envelope systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.0.2.8 and to comply withlhe mandatory requirements
listed in the Inspection Checklist. 'I-- �') , .4,,-7 / /
-Acclincez 1 /15 /18
Slanature Date
Project Title: Dish One Satellite Report date: 01/15/18
Data filename: S:\Drawings\715-Dish 1\Dish One.cck Page 4 of 11
COMcheck Software Version 4.0.2.8
Inspection Checklist
Energy Code: 2015 IECC
Requirements: 0.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
Is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
#
Plan Review Complies? Comments/Assumptions
& Re .ID
0103.2
Plans and/or specifications provide all❑Complies
[PR111
Information with which compliance❑Does Not
can be determined for the building i i
'envelope ❑Not Observable:
and document where
exceptions to the standard are ;❑Not Applicable
claimed.
0402.4.1
;The skylight area <= 3 percent of the ;❑Complies
[PR1111
jgross roof area. 11 Does Not
❑Not Observable:
❑Not Applicable
C402.4.1.
!Vertical Fenestration Area Allowance: ;❑Complies
1
A maximum of 40 percent of gross ❑Does Not
[PR1211
:above -grade wall area is permitted to
be vertical fenestration area provided ❑Not Observable I
>= 50 percent of the conditioned floor:❑Not Applicable ;
:area is within a daylight zone, daylight:
!responsive controls are installed, and
glazing assemblies within the scope of
j NFRC 200 have visible transmittance i
>= 1.1 times SHGC.
0406
,Plans, specifications, and/or❑Complies
[PR9]1
:calculations provide all Information❑Does Not
:with which compliance can be :
determined for the additional energy :❑Not Observable
Applicable
:efficiency package options.❑Not
Additional Comments/Assumptions:
1 I High Impact (Tier 1) IflM Medium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Project Title: Dish One Satellite Report date: 01/15/18
Data filename: s:\Drawings\715-Dish 1\Dish One.cck Page 5 of 11
Section
#
Footing / Foundation Inspection
Complies?
Comments/Assumptions
& Req.ID
0303.2
Slab edge Insulation installed per
❑Complies
[FO412
manufacturer's instructions.
❑Does Not
❑Nat Observable I
j❑Not Applicable
C303.2.1
Exterior Insulation protected against❑Complies
[FO6]1
damage, sunlight, moisture, wind,
❑Does Not
landscaping and equipment
Observable
maintenance activities.❑Not
j❑Not Applicable
0402.2.5
Slab edge insulation R -value.
I❑Complies ;See the Envelope Assemblies table for values.
[FO3]'❑Does
Not
I❑Not Observable;
j❑Not Applicable
C402.2.6
Radiant heating systems panels❑Complies
'..See the Envelope Assemblies table for values.
[FO12]3
insulated to >=R-3.5 on face opposite❑Does Not
space being heated.
[❑Not Observable,
!❑Not Applicable
Additional Comments/Assumptions:
111 High Impact (Tier 1) Iffil Medium Impact (Tier 2) r3! Low Impact (Tier 3)
Project Title: Dish One Satellite Report date: 01/15/18
Data filename: S:\Drawings\715-Dish 1\Dish One.cck Page 6 of 11
Section
#
Framing / Rough -In Inspection
Complies? Comments/Assumptions
& Req.ID
0303.13
Fenestration products rated in',❑Complies
[FR12]2
accordance with NFRC.
;❑Does Not
I❑Not Observable:
❑Not Applicable
0303.1.3
Fenestration products are certified as
I❑Complies
[FR33]1
to performance labels or certificates
❑Does Not
provided.
;❑Not Observable I
❑Not Applicable
C402.4.3
Vertical fenestration SHGC value.
❑Complies ;See the Envelope Assemblies table for values.
[FR10]1
;❑Does Not
❑Not Observable
1❑Not Applicable j
C402.4.3,
Vertical fenestration U -Factor.
I❑Complies ',See the Envelope Assemblies table for values.
0402.4.3.❑Does
Not
4 1❑Not
[FRB]❑Not
Observable
Applicable
0402.4.4
U -factor of Opaque doors associated
;❑Complies ;See the Envelope Assemblies table for values.
[FR14]2
with the building thermal envelope
:❑Does Not
meets requirements.
❑Not Observable;
j❑Not Applicable
C402.5.1.
The building envelope contains a
I❑Complies
2.1
'continuous air barrier that Is sealed in
I❑Does Not
[FR19]1',
an approved manner and material
❑Not Observable 1
I permeability <= 0.004 dfm/ft2. Air
barrier penetrations are sealed in an❑Not
Applicable
approved manner.
0402.5.2,
Factory -built fenestration and doors❑Complies
C402.5.4
are labeled as meeting air leakage❑Does
Not
[FR18]3
requirements.
❑Not Observable
j❑Not Applicable j
C402.5.7
Vestibules are Installed on all building❑Complies
[FR1713entrances.
Doors have self-closing
j❑Does Not
devices.
I❑Not Observable
❑Not Applicable j
Additional Comments/Assumptions:
111 High Impact (Tier 1) IM Medium Impact (Tier 2) -r$; 1 Low Impact (Tier 3)
Project Title: Dish One Satellite Report date: 01/15/18
Data filename: 5:\Drawings\715-Dish 1\Dish One.cck Page 7 of 11
# I Mechanical Rough -in Inspection I Complies? I Comments/Assumptions
C402.5.5, Stair and elevator shaft vents have❑Complies
C403.2.4. 'motorized dampers that automatically❑Does Not
[ME3]3 'close.❑Not Observable:
❑Not Applicable
C402.5.5, Outdoor air and exhaust systems have;❑Complies
0403.2.4. motorized dampers that automatically❑Does Not
3 shut when not in use and meet
[ME58]3 :maximum leakage rates. Check I❑Not Observable;
gravity dampers where allowed. t❑Not Applicable
Additional Comments/Assumptions:
111 High Impact (Tier 1) MM Medium Impact (Tier 2) -331 Low Impact (Tier 3)
Project Title: Dish One Satellite Report date: 01/15/18
Data filename: s:\Drawings\715-Dish 1\Dish One.cck Page 8 of 11
Section
#
Insulation InspectionComplies?
1
Comments/Assumptions
7
& Re .ID
C303.1
;Roof Insulation Installed per
;❑Complies
[IN311
manufacturer's Instructions. Blown or
❑Does Not
loose -fill Insulation Is installed
!only
Observable
only where the roof slope is <=3 in❑Not
I12.
❑Not Applicable
C303.1
. Building envelope insulation Is labeled❑Complies
[IN10]2
with R•value or Insulation certificate
:[]Does Not
providing R -value and other relevant
data.
!❑Not Observable;
❑Not Applicable j
0303.2
',Above -grade wall Insulation Installed❑Complies
[IN711
'aper manufacturer's instructions.
;❑Does Note,
I❑Not Observable!
❑Not Applicable
0303.2.1
Exterior Insulation is protected from
I❑Complies
[IN1412
damage with a protective material.
;❑Does Not
Verification for exposed foundation
insulation may need to occur during
❑Not Observable
Foundation Inspection.
;❑Not Applicable
0402.1.3
Non -swinging opaque doors have R-
;❑Compiles
[IN19]3
4.75 Insulation.
!ElDoes Not
,[]Not Observable;
:[]Not Applicable j
C402.2.1
Insulation Intended to meet the roof
I❑Compiles
[IN17]3
insulation requirements cannot beij❑Does
Not
installed on top of a suspended
ceiling. Mark this requirement
❑Not Observable i
compliant if insulation is Installed❑Not
Applicable
accordingly.
C402.2.3
(Above -grade wall Insulation R -value.
;❑Complies ('See the Envelope Assemblies table for values.
[IN6]1❑Does
Not
❑Not Observable f
j❑Not Applicable
C402.2.5
Floor insulation R -value.
;❑Complies ;See the Envelope Assemblies table for values.
[IN8]'❑Does
Not
I❑Not Observable
j❑Not Applicable
C402.2.6
Radiant panels and associated❑Complies
[IN18)3
'components, designed for heat
❑Does Not
transfer from the panel surfaces to the;
Observable;
occupants or indoor space are
: insulated with a minimum of R-3.5.❑Not
:❑Not
Applicable j
C402.4.2.
Roof R -value. For some ceiling
;❑Complies (See the Envelope Assemblies table for values.
2'
,systems, verification may need to
:[]Does Not
[IN211
;occur during Framing Inspection.
j❑Not Observable!
j❑Not Applicable
0402.5.1.
IAII sources of air leakage in the❑Complies
1
:building thermal envelope are sealed,
❑Does Not
[IN111
;caulked, gasketed, weather stripped
❑Not Observable
or wrapped with moisture vapor -
permeable wrapping material to❑Not
Applicable j
minimize air leakage.
Additional Comments/Assumptions:
111 High Impact (Tier 1) in Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: Dish One Satellite Report date: 01/15/18
Data filename: S:\Drawings\715-Dish 1\Dish One.cck Page 9 of 11
Section
#
Final Inspection
Complies? Comments/Assumptions
& Re .ID
0402.5.3
Where open combustion air ducts❑Complies
[FI51]3
provide combustion air to open
j❑Does Not
combustion fuel burning appliances,
Observable.
the appliances and combustion air❑Not
opening are located outside the❑Not
Applicable
building thermal envelope or enclosed
in a room, isolated from Inside the
thermal envelope. Such rooms are
,sealed and insulated.
C402.5.6
I Weatherseals Installed on all loading
;❑Complies
[F13711
!dock cargo doors.❑Does
Not
I❑Not Observable:
❑Not Applicable j
0402.5.8
Recessed luminaires In thermal
I❑Complies
[FI2613
envelope to limit infiltration and be IC
;❑Does Not
rated and labeled. Seal between
interior finish and luminaire housing.
❑Not Observable
j❑Not Applicable
Additional Comments/Assumptions:
111 High Impact (Tier 1) JMJ Medium Impact (Tier 2) 13 ILOW Impact( 3)
Project Title: Dish One Satellite Report date: 01/15/18
Data filename: S:\Drawings\715-Dish 1\Dish One.cck Page 10 of 11
Project Title: Dish One Satellite Report date: 01/15/18
Data filename: S:\Drawings\715-Dish 1\Dish Onexck Page 11 of 11
6 COMcheck Software Version 4.0.7.2 Review
�( Interior Lighting Compliance Certificate
Project Information
Energy Code: 2015 IECC
Project Title: DISH ONE SATELLITE
Project Type: New Construction
Construction Site: Owner/Agent: Designer/Contractor:
REXBURG, ID DISH ONE SATELLITE Payne Engineering
ID 1823 E. Center Street
Additional Efficiency Package
Pocatello,
08-232 qq 93201
High efficiency HVAC. Systems that do not meet the performance requirement will be identified in the mechanical requirements checklist
report.
Allowed Interior Lighting Power
A
B
C
D
Area Category
Floor Area
Allowed
Allowed Watts
(11112)
Watts / t12
(B X C)
1 -Office
6291
0.82
5159
2 -Gymnasium
10348
0.94
9727
Total Allowed Wafts =
14886
Proposed Interior Lighting Power
A
B
C
D
E
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
Lamps/
# of
Fixture
(C X D)
Fixture
Fixtures
Watt.
1 -Office
LED 1: F2/F2E/F2SE: 2X2 LAYIN TROFFER: Other:
1
40
30
1200
LED 1 copy 1: F3: 2X2 LAYIN TROFFER: Other:
1
50
40
2000
LED 3: F4E: 6" RECESSED CAN: Other:
1
1
25
25
LED 4: F5: 4FT STRIP: Other:
1
3
30
90
LED 5: F6: 4FT LINEAR WALL: Other:
1
2
40
80
LED 6: F7/F7E: 4FT SURFACE WRAP: Other:
1
11
32
352
LED 7: F8:6" ROUND SURFACE: Other:
1
2
18
36
gymnasium
LED 8: F9: 8FT STRIP: Other: 1 5 77 385
LED 9: F10/F10E: HIGH BAY LED: Other: 1 35 100 3500
Total Proposed Watts= 7668
ITterlor Linrtif a PAr- .. .- rq- ..-
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.0.7.2 Review and to comply with any applicable
mandatory requirements listed In the Inspection Checklist.
Project Title: DISH ONE SATELLITE Report date: 01/10/18
Data filename: \\PESERVER\Payne Engineering Data\2018\Dish One - 1804\05_Calculations\Comcheck\Dish Page 1 of 6
One.cck
Mike Payne, Designer Mike Payne 01/10/2018
Name - Title Signature Date
Project Title: DISH ONE SATELLITE Report date: 01/10/18
Data filename: \\PESERVER\Payne Engineering Data\2018\Dish One - 1804\05_Calculations\Comcheck\Dish Page 2 of 6
One.cck
n�(
COMcheck Software Version 4.0.7.2 Review
Mechanical Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
Construction Site:
Rexburg, ID
Additional Efficiency Package
Unspecified
Mechanical Systems List
2015 IECC
Dish One Satellite
Rexburg, Idaho
6b
New Construction
OwnerlAgent: DesignerlContractor:
Dwayne Sudweeks
Engineered Systems Assoc., Inc.
1355 E. Center St.
Pocatello, ID 83201
208-233-0501
dcs@engsystems.com
Quantity System Type & Description
3 HVAC System 1 (Single Zone):
Healing: 1 each - Duct Furnace, Gas, Capacity = 106 kBtum
Proposed Efficiency = 85.00% Ec, Required Efficiency = 80.00% Ec
Cooting: 1 each - Single Package DX Unit, Capacity = 60 kBtu/h, Air -Cooled Condenser, Air Economizer
Proposed Efficiency = 14.00 SEER, Required Efficiency: 14.00 SEER
Fan System: FAN SYSTEM 1 -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 1 Supply, Constant Volume, 1800 CFM, 0.8 motor nameplate hp, 0.8 fan efficiency grade
HVAC System 2 (Single Zone):
Heating: 1 each - Duct Furnace, Gas, Capacity = 98 kBtu/h
Proposed Efficiency - 85.00% Ec, Required Efficiency - 80.00% Ec
Cooling: 1 each - Single Package DX Unit, Capacity - 49 kBtu/h, Air -Cooled Condenser, Air Economizer
Proposed Efficiency - 14.00 SEER, Required Efficiency: 14.00 SEER
Fan System: FAN SYSTEM 1 -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 1 Supply, Constant Volume, 1800 CFM, 0.6 motor nameplate hp, 0.8 fan efficiency grade
HVAC System 3 (Single Zone):
Heating: 1 each - Duct Furnace, Gas, Capacity = 284 kBtu/h
Proposed Efficiency - 85.00% Ec, Required Efficiency = 80.00% Ec
Cooling: 1 each - Single Package DX Unit, Capacity = 180 kBtu/h, Air -Cooled Condenser, Air Economizer
Proposed Efficiency - 10.80 EER, Required Efficiency: 10.80 EER i 12.2 IEER
Fan System: FAN SYSTEM 2 -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 2 Supply, Constant Volume, 6000 CFM, 3.0 motor nameplate hp, 0.9 fan efficiency grade
Water Heater 1:
Gas Storage Water Heater, Capacity: 50 gallons, Input Rating: 65 kBtu/h
Proposed Efficiency: 85.00 EF, Required Efficiency: 0.58 EF
Project Title: Dish One Satellite
Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Dish One.cck
Report date: 01/12/18
Page 1 of 11
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical design represented in this document Is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been
designed to meet the 2015 IECC requirements in COMche k Version 4.0.7.2 Review and to comply with any applicable
m datory requirements listed in the Inspection Checklist,
T
Name-Title Signa ure Date
Project Title: Dish One Satellite Report date: 01/12/18
Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Dish One.cck Page 2 of 11
eCOMcheck Software Version 4.0.7.2 Review
�(J Inspection Checklist
Energy Code: 2015 IECC
Requirements: 0.0% were addressed directly in the COMcheck software
Text In the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that Is documented, or that an exception
Is being claimed. Where compliance Is Itemized in a separate table, a reference to that table is provided.
#
6 Re .ID
I Plan ReviewComplies?
I
Comments/Assumptions
0303.2
_
Plans, specifications, and/or
_
❑Complies
[PR211
calculations provide all information
[]Does Not
with which compliance can be
determined for the mechanical
❑Not Observable
systems and equipment and
❑Not Applicable
document where exceptions to the
standard are claimed, Load
calculations per acceptable
engineering standards and
handbooks.
0103.2
Plans, specifications, and/or
❑Complies
(PR311
calculations provide all Information
❑Does Not
with which compliance can be
❑Not Observable
determined for the service water
heating systems and equipment and
❑Not Applicable
document where exceptions to the
standard are claimed. Hot water
system sized per manufacturer's
sizing guide.
C406
Plans, specifications, and/or
❑Complies
(PR911
calculations provide all Information
❑Does Not
with which compliance can be
(]Not Observable
determined for the additional energy
efficiency package options.
❑Not Applicable
Additional Comments/Assumptions:
1 I High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) 1
Project Title: Dish One Satellite Report date: 01/12/18
Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Dish One.cck Page 3 of 11
cIon
#
Foundation Inspection
Footing / Fou
om
cpllesi
mm Coin ents/Assn ptlons
e .ID
3.2.4.
Snow/ice melting system sensors for
❑Complies
future connection to controls. Freeze
❑Does Not
3.2.4.
protection systems have automatic
[]Not Observable
It3
controls Installed.
❑Not Applicable
Additional Comments/Assumptions:
1 IHigh Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: Dish One Satellite Report date: 01/12/18
Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Dish One.cck Page 4 of 11
III
e .10
I Plumbing Rough -In InspectionI
Complies?
3.5,
_
Heated water supply piping conforms
❑Complies
3.5.1,
to pipe length and volume
❑Does Not
3.5.2
13
requirements. Refer to section details.
❑Not Observable
:404.6.3
Pumps that circulate water between a
❑Not Applicable
C4O4.5, Heated water supply piping conforms UComplies
C4O4.5.1, to pipe length and volume []Does Not
C40435.2 requirements. Refer to section details. ❑Not Observable
(PL6) ❑Not Applicable
Heated water supply piping conforms UComplles
to pipe length and volume ❑Does Not
requirements. Refer to section details. []Not Observable
❑Not Applicable
404.5, Heated water supply piping conforms UComplles
404.5.1, to pipe length and volume ❑Does Not
404.5.2 requirements. Refer to section details.
❑
'PL613 Not Observable
[]Not Applicable
404.6.3
Pumps that circulate water between a
UComplles
PL713
heater and storage tank have controls
[]Does Not
through a cold -water supply pipe Is a
demand recirculation water system.
that limit operation from startup to
❑Not Observable
<= 5 minutes after end of heating
cycle,
❑Not Applicable
:404.6.3
Pumps that circulate water between a
❑Complies
PL713
heater and storage tank have controls
❑Does Not
entering the cold -water piping to
that limit operation from startup to
❑NoF Observable
<= 5 minutes after end of heating
cycle.
❑Not Applicable
Pumps that circulate water between a UComplles
heater and storage tank have controls ❑Does Not
that limit operation from startup to ❑Not Observable
<m 5 minutes after end of heating
cycle, ❑Not Applicable
Pumps that circulate water between a UComplies
heater and storage tank have controls ❑Does Not
that limit operation from startup to ❑Not Observable
<= 5 minutes after end of heating
cycle, ❑Not Applicable
Water distribution system that pumps
UComplles
water from a heated -water supply
❑Does Not
pipe back to the heated -water source
[]Not Observable
through a cold -water supply pipe Is a
demand recirculation water system.
❑Not Applicable
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold -water piping to
104°F.
Comments/Assumptions
11 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Project Title: Dish One Satellite Report date: 01/12/18
Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Dish One.cck Page 5 of 11
Section
UComplles
1PL813 water from a heated -water supply
#
Plumbing Rough -0n Inspection
Complies?
through a cold -water supply pipe is a
❑Not Applicable
demand recirculation water system.
C404.7
Water distributsystem that pumps
Fon
❑Complies
[PL813
water from a heated -water supply
❑Does Not
pipe back to the heated -water source
[]Not Observable
limits the temperature of the water
through a cold -water supply pipe Is a
[]Not Applicable
demand recirculation water system.
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold -water piping to
104°F.
C404.7
Water distribution system that pumps
❑Complies
PI -813
water from a heated -water supply
❑Does Not
pipe back to the heated -water source
❑Not Observable
through a cold -water supply pipe is a
❑Not Applicable
demand recirculation water system.
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold -water piping to
Comments/Assungrtl Otis
C404.7 Water distribution system that pumps
UComplles
1PL813 water from a heated -water supply
❑Does Not
pipe back to the heated -water source
❑Not Observable
through a cold -water supply pipe is a
❑Not Applicable
demand recirculation water system.
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold -water piping to
104°F.
Additional Comments/Assumptions:
11 Nigh Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: Dish One Satellite Report date: 01/12/18
Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Dish One.cck Page 6 of 11
Section
#Mechanical
Rough -In Inspection
complies?
Comments/Assumptions
& Re .ID
C402.2.6
Thermally Ineffective panel surfaces of
_
❑Complies
(ME4113
sensible heating panels have
[]Does Not
Insulation >= R-3.5.
[]Not Observable
❑Not Applicable _
0403.2.13
Unenclosed spaces that are heated
❑Complies
(ME7112
use only radiant heat.
❑Does Not
[]Not Observable
❑Not Applicable
C403.2,3
HVAC equipment efficiency verified.
❑Complies See the Mechanical Systems list for values.
IME5513
[]Does Not
[]Not Observable
❑Not Applicable
_ __
0403.2.4.
Fault detection and diagnostics
_
❑Complies
7
installed with air-cooled unitary DX
[]Does Not
IME11312
units having economizers.
❑Not Observable
❑Not Applicable
0403,2.4.
Fault detection and diagnostics
❑Complies
7
Installed with air-cooled unitary DX
❑Does Not
[ME11312
units having economizers.
❑Not Observable
❑Not Applicable
C403.2.6.
Demand control ventilation provided
❑Complies
1
for spaces >500 R2 and >25
(]Does Not
[ME5911
people/1000 ft2 occupant density and
[]Not Observable
served by systems with air side
Not Applicable
economizer, auto modulating outside
air damper control, or design airflow
>3,000 cfm.
C403.2,6,
Enclosed parking garage ventilation
❑Complies
2
has automatic contaminant detection
[]Does Not
(ME1151)
and capacity to stage or modulate
❑Not Observable
fans to 50% or less of design capacity.
❑Not Applicable
0403.2,7
Exhaust air energy recovery on
❑Complies
[ME5711
systems meeting Table C403.2,7(1)
[]Does Not
and C403.2.7(2).
❑Not Observable
❑Not Applicable
C403.2.8
Kitchen exhaust systems comply with
❑Complies
(ME11613
replacement air and conditioned
[)Does Not
supply air limitations, and satisfy hood
❑Not Observable
rating requirements and maximum
❑Not Applicable
exhaust rate criteria.
PP e
C403.2.9
HVAC ducts and plenums insulated.
❑Complies
(ME6012
Where ducts or plenums are Installed
[]Does Not
In or under a slab, verification may
❑Not Observable
need to occur during Foundation
❑Not Applicable
'.Inspection.
C403.2,9
Ducts and plenums sealed based on
❑Complies
(ME1013
static pressure and location.
❑Does Not
❑Not Observable
❑Not Applicable
0403.2,9,
Ductwork operating >3 in. water
_
❑Complies
1.3
column requires air leakage testing,
❑Does Not
[ME1113
[]Not Observable
❑Not Applicable
111 High Impact (Tier 1) 2 Medium Impact (Tier 2) 13 Low Impact (Tier 3)
Project Title: Dish One Satellite Report date: 01/12/18
Data filename: CAUsers\Dwayne 15\Documents\COMcheck\DIsh One.cck Page 7 of 11
section
#
Mechanical Rough -In Inspection
Compiles?
Comments/Assumptions
& Re .ID
C403.2.9,
Ductwork operating >3 in. water
❑Complies
_
1.3
column requires air leakage testing.
[]Does Not
(ME1113
❑Not Observable
[]Not Applicable
C403.2,9.
Ductwork operating >3 In. water
❑Complies
113
column requires air leakage testing.
❑Does Not
[ME1113
❑Not Observable
❑Not Applicable
C403.3
Air economizers provided where
_
❑Complies
IME6211
required, meet the requirements for
❑Does Not
design capacity, control signal,
ventilation controls, high -limit shut-off,
Not Observable
Integrated economizer control, and
❑Not A Iicable
pP
provide a means to relieve excess
outside air during operation.
04033
Air economizers provided where
❑Complies
[ME6211
required, meet the requirements for
❑Does Not
design capacity, control signal,
ventilation controls, high -limit shut-off,
[]Not Observable
Integrated economizer control, and
[]Not Applicable
pP
provide a means to relieve excess
outside air during operation.
0403,4.4.
Multiple zone VAV systems with DDC
❑Complies
See the Mechanical Systems list for values.
6
of individual zone boxes have static
❑Does Not
IME31013
pressure setpolnt reset controls.
[_]Not Observable
❑Not Applicable
C403.4.4.
Multiple zone VAV systems with DDC
❑Complies
See the Mechankal Systems list for values.
6
of individual zone boxes have static
[]Does Not
IME11013
pressure setpolnt reset controls.
❑Not Observable
❑Not Applicable
C403.4.4.
Multiple zone VAV systems with DDC
❑Complies
See the MechanlcalSystems list for values.
6
of individual zone boxes have static
❑Does Not
[ME11013
pressure setpoint reset controls.
❑Not Observable
❑Not Applicable_
0404.2.1
Gas-fired water -heating equipment
❑Complies
[ME111)2
Installed In new buildings: where a
❑Does Not
singular piece of water -heating
❑Not Observable
equipment >- 1,000 kBtu/h serves
❑Not Applicable
the entire building, thermal efficiency
>= 90 Et. Where multiple pieces of
water -heating equipment serve the
building with combined rating >-
1,000 kBtu/h, the combined input -
capacity -weighted -average thermal
efficiency >= 90 Et. Exclude Input
rating of equipment in Individual
dwelling units and equipment <- 100
kBtu/h.
C408.2.2.
Air outlets and zone terminal devices
❑Complies
1
have means for air balancing.
❑Does Not
IME5313
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 1HIgh Impact (Tier 1) _ I.2 Medium Impact (Tier 2) 13 low Impact (Tier 3)
Project Title: Dish One Satellite Report date: 01/12/18
Data filename: C:\Users\Dwayne 15\Documents\C0Mchec1k\Dish One.cck Page 8 of 11
Section
#
Final Inspection
CompllesT
Comments/Assumptions
& Re .ID
I
_
0303.3,
Furnished O&M manuals for HVAC
❑Complies
C408.2.5.
systems within 90 days of system
❑Does Not
3
[FI813
acceptance.
[]Not Observable
❑Not Applicable
0403.2.2
HVAC systems and equipment
❑Complies
[F12713
capacity does not exceed calculated
❑Does Not
loads.
[]Not Observable
❑Not Applicable
0403,2,4.
Heating and cooling to each zone Is
❑Complies
1
controlled by a thermostat control.
❑Does Not
IF14711
Minimum one humidity control device
❑Not Observable
per Installed
humidification/dehumidification
❑Not A pplicable
system.
C403.2.4.
Heating and cooling to each zone is
❑Complies
1
controlled by a thermostat control.
❑Does Not
IFI47]3
Minimum one humidity control device
❑Not Observable
per Installed
❑Not Applicable
pplicable
system.
C403.2.4.
Heating and cooling to each zone is
❑Complies
1
controlled by a thermostat control.
❑Does Not
(FI47)3
Minimum one humidity control device
❑Not Observable
per installed
humidification/dehumidification
[]Not Applicable
system.
C403.2.4.
Thermostatic controls have a 5 °F
❑Complies
1.2
deadband.
[]Does Not
[F13813
❑Not Observable
❑Not Applicable
C403.2.4.
Temperature controls have setpoint
❑Complies
1.3
overlap restrictions.
[]Does Not
[F12013
❑Not Observable
❑Not Applicable
C403.2.4.
Each zone equipped with setback
❑Complies
2
controls using automatic time clock or
[]Does Not
IF139]3
programmable control system.
[]Not Observable
❑Not Applicable
C403.2.4.
Automatic Controls; Setback to SS°F
❑Complies
2.1,
(heat) and 85°F (cool); 7 -day clock, 2-
[]Does Not
C403.2.4.
hour occupant override, 10 -hour
[]Not Observable
2.2
[F140)3
backup
❑Not Applicable
0403,2.4,
Systems Include optimum start
❑Complies
2.3
controls.
❑Does Not
V14113
[]Not Observable
❑Not Applicable
C403.2.4.
Systems include optimum start
❑Complies
2.3
controls.
❑Does Not
IFI4113
[]Not Observable
❑Not Applicable
C403.2.4.
Systems Include optimum start
❑Complies
2.3
controls.
❑Does Not
IF141)3
❑Not Observable
❑Not Applicable
1 High Impact (Tier 1) 2 Medium Impact (Tier 21 3 Low Impact (Tier 3)
Project Title: Dish One Satellite Report date: 01/12/18
Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Dlsh One.cck Page 9 of 11
Section.
N
Final Inspection
Complies? Comments/Assumptions
I
& Req.ID.
__ _
0404.3
Heat traps installed on supply and
❑Complies
(Fill 13
discharge piping of non -circulating
❑Does Not
systems.
❑Not Observable
❑Not Applicable _
C404.4
All piping insulated in accordance with
[]Complies
[F12512
section details and Table C403,2.10.
[]Does Not
❑Not Observable
❑Not Applicable
C408.2.1
Commissioning plan developed by
❑Complies
[F12813
registered design professional or
[]Does Not
approved agency,
[]Not Observable
❑Not Applicable
0408.2.3.
HVAC equipment has been tested to
❑Complies
1
ensure proper operation.
[]Does Not
[F13111
QNot Observable
❑Not Applicable
0408.2.3.
HVAC control systems have been
❑Complies
2
tested to ensure proper operation,
❑Does Not
IFI101'
calibration and adjustment of controls.
❑Not Observable
❑Not Applicable
0408.2.3.
Economizers have been tested to
❑Complies
3
ensure proper operation.
❑Does Not
IF13211
❑Not Observable
❑Not Applicable
0408.2.4
Preliminary commissioning report
❑Complies
(F12911
completed and certified by registered
❑Does Not
design professional or approved
[]Not Observable
agency,
❑Not Applicable
0408.2.5.
Furnished HVAC as -built drawings
[Complies
1
submitted within 90 days of system
❑Does Not
IFI713
acceptance.
[]Not Observable
❑Not Applicable
0408,2.5.
An air and/or hydronic system
❑Complies
3
balancing report is provided for HVAC
❑Does Not
[F14311
systems.
❑Not Observable
❑Not Applicable
0408.2.5.
Final commissioning report due to
❑Complies
4
building owner within 90 days of
❑Does Not
(F13011
receipt of certificate of occupancy.
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 I High Impact (Tier 1) 2 Medium Impact (Tier 2) 13 Itow, Impact (Tier 31
Project Title: Dish One Satellite Report date: 01/12/18
Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Dish One,cck Page 10 of 11
Project Title: Dish One Satellite Report date: 01/12/18
Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Dish One.cck Page 11 of 11