Loading...
HomeMy WebLinkAboutCOMCHECK - 18-00034 - 1160 Bond Ave - Dish One Satellite - New Building6 COMcheck Software Version 4.0.2.8 �( Envelope Compliance Certificate Project Information Energy Code: 2015 IECC Project Title: Dish One Satellite Location: Rexburg, Idaho Climate Zone: 6b Project Type: New Construction Vertical Glazing / Wall Area: 10% Construction Site: Owner/Agent: Designer/Contractor: JRW & Associates, PLLC 1152 Bond Ave Rexburg, ID Building Area Floor Area 1 -Gym (Gymnasium) : Nonresidential 9370 2 -Tenant Space (Office) : Nonresidential 2067 3 -Dish One Office (Office) : Nonresidential 6322 4 -Receiving (Warehouse) : Nonresidential 1135 Additional Efficiency Package High efficiency HVAC. Systems that do not meet the performance requirement will be identified in the mechanical requirements checklist report. Envelope Assemblies Assembly Gross Area Cavity Cont. Proposed Budget U. or R -Value R -Value U -Factor Factors.) Product ID storefront, SHGC 0.34, PF 0.30, [Bldg. Use 2 - Tenant Perimeter Space] (c) Roof 1: Metal Building, Standing Seam, Filled Cavity with Thermal 9370 38.5 11.0 0.028 0.031 Blocks (e), [Bldg. Use 1 - Gym] Tenant Space] (c) Roof 2: Metal Building, Standing Seam, Filled Cavity with Thermal 2067 38.5 11.0 0.028 0.031 Blocks (e), [Bldg. Use 2 - Tenant Space] Tenant Space] (c) Roof 3: Attic Roof with Wood Joists, [Bldg. Use 3 - Dish One Office] 6322 60.0 0.0 0.017 0.021 Roof 4: Attic Roof with Wood Joists, [Bldg. Use 4 - Receiving] 1135 60.0 0.0 0.017 0.021 Floor 1: Slab-On-Grade:Unheated, Horizontal with vertical 3 ft., [Bldg. 674 --- 10.0 0.378 0.441 Use 2 - Tenant Space] (d) NORTH Tenant North: Other Metal Building Wall, [Bldg. Use 2 - Tenant 1318 --- --- 0.055 0.052 Space] (b) Window'E': Metal Frame with Thermal Break:Fixed, Pert. Specs.: 64 --- --- 0.355 0.360 Product ID storefront, SHGC 0.34, PF 0.30, [Bldg. Use 2 - Tenant Space] (c) Window'E' copy 1: Metal Frame with Thermal Break:Fixed, Pert. 64 --- --- 0.355 0.360 Specs.: Product ID storefront, SHGC 0.34, PF 0.30, (Bldg. Use 2 - Tenant Space] (c) Door 1: Glass (> 50% glazing):Metal Frame, Entrance Door, Pert. 21 --- --- 0.450 0.770 Specs.: Product ID P-CUW-22285, SHGC 0.18, PF 0.30, [Bldg. Use 2 - Tenant Space] (c) Project Title: Dish One Satellite Report date: 01/15/18 Data filename: 5:\Drawings\715-Dish 1\Dish One.cck Page 1 of 11 Assembly Door 1 copy 1: Glass (> 50%glazing):Metal Frame, Entrance Door, Pert. Specs.: Product ID P-CUW-22285, SHGC 0.18, PF 0.30, [Bldg. Use 2 - Tenant Space] (c) Gym North Wall: Other Metal Building Wall, [Bldg. Use 1 - Gym] (b) Receiving North: Wood -Framed, 16" o.c., [Bldg. Use 4 - Receiving] Window'D': Metal Frame with Thermal Break:Fixed, Pert. Specs.: Product ID storefront, SHGC 0.34, PF 1.33, [Bldg. Use 4 - Receiving] (c) Window'D' copy 1: Metal Frame with Thermal Break:Fixed, Pert. Specs.: Product ID storefront, SHGC 0.34, PF 1.33, [Bldg. Use 4 - Receiving] (c) EAST Tenant East Wall: Other Metal Building Wall, [Bldg. Use 2 - Tenant Space] (b) Gym East Wall: Metal Building Wall, Double Layer Mineral Fiber, [Bldg. Use 1 -Gym] Window C: Metal Frame with Thermal Break:Fixed, Perf. Specs.: Product ID storefront, SHGC 0.34, [Bldg. Use 1 - Gym] (c) Window C copy 1: Metal Frame with Thermal Break:Fixed, Pert. Specs.: Product ID storefront, SHGC 0.34, [Bldg. Use 1 - Gym] (c) Door 3: Insulated Metal, Swinging, [Bldg. Use 1 - Gym] Office -Receiving East: Wood -Framed, 16" o.c., [Bldg. Use 3 - Dish One Office] Window F: Metal Frame with Thermal Break:Fixed, Pert. Specs.: Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c) Window F copy 1: Metal Frame with Thermal Break:Fixed, Pert. Specs.: Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c) Window F copy 2: Metal Frame with Thermal Break:Fixed, Pert. Specs.: Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c) Window F copy 3: Metal Frame with Thermal Break:Fixed, Pert. Specs.: Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c) Window F copy 4: Metal Frame with Thermal Break:Fixed, Perf. Specs.: Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c) Window F copy 5: Metal Frame with Thermal Break:Fixed, Pad. Specs.: Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c) Overhead Dr: Insulated Metal, Non -Swinging, [Bldg. Use 3 - Dish One Office] Overhead Dr copy 1: Insulated Metal, Non -Swinging, [Bldg. Use 3 - Dish One Office] Door 6: Insulated Metal, Swinging, [Bldg. Use 3 - Dish One Office] Office EIFS East: Wood -Framed, 16" o.c., [Bldg. Use 3 - Dish One Office] SOUTH Office South EIFS: Wood -Framed, 16" o.c., [Bldg. Use 3 - Dish One Office) Window W: Metal Frame with Thermal Break:Fixed, Pert. Specs.: Product ID storefront, SHGC 0.34, PF 0.30, [Bldg. Use 3 - Dish One Office] (c) Window'A' copy 1: Metal Frame with Thermal Break:Fixed, Pert. Specs.: Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c) Window'A' copy 2: Metal Frame with Thermal Break:Fixed, Pert. Specs.: Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c) Office South: Wood -Framed, 16" o.c., [Bldg. Use 3 - Dish One Office] Window F copy 3: Metal Frame with Thermal Break:Fixed, Pert. Specs.: Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c) Project Title: Dish One Satellite Data filename: S:\Drawings\715-Dish 1\Dish One.cck Gross Area Cavity Cont. Proposed Budget U - or R -Value R -Value U -Factor Factor(.) Perimeter 21 --- --- 0.450 0.770 660 --- --- 0.055 0.052 640 21.7 3.0 0.050 0.051 32 --- --- 0.355 0.360 32 --- --- 0.355 0.360 449 --- --- 0.055 0.052 2516 25.0 3.5 0.097 0.052 50 --- --- 0.355 0.360 50 --- --- 0.355 0.360 24 --- --- 0.067 0.370 1288 21.7 3.0 0.050 0.051 18 --- --- 0.355 0.360 18 --- --- 0.355 0.360 18 --- --- 0.355 0.360 18 --- --- 0.355 0.360 18 --- --- 0.355 0.360 18 --- --- 0.355 0.360 115 --- --- 0.078 0.078 115 --- --- 0.078 0.078 24 --- --- 0.067 0.370 82 21.7 5.0 0.045 0.051 555 21.7 5.0 0.045 0.051 22 --- --- 0.355 0.360 22 --- --- 0.355 0.360 22 --- --- 0.355 0.360 1000 21.7 3.0 0.050 0.051 18 --- --- 0.355 0.360 Report date: 01/15/18 Page 2 of 11 Assembly Gross Area Cavity Cont. Proposed Budget U. or R -Value R -Value U -Factor Factor(.) Perimeter Window F copy 4: Metal Frame with Thermal Break:Fixed, Perf. Specs.: 18 --- --- 0.355 0.360 Product ID storefront, SHGC 0.34, (Bldg. Use 3 - Dish One Office] (c) Window F copy 4: Metal Frame with Thermal Break:Fixed, Perf. Specs.: 18 --- --- 0.355 0.360 Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c) Window F copy 5: Metal Frame with Thermal Break:Fixed, Perf. Specs.: 18 --- --- 0.355 0.360 Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c) 22 --- --- 0.355 0.360 Window F copy 5: Metal Frame with Thermal Break:Fixed, Perf. Specs.: 18 --- --- 0.355 0.360 Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c) Window F copy 6: Metal Frame with Thermal Break:Fixed, Perf. Specs.: 18 --- --- 0.355 0.360 Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c) Window F copy 6: Metal Frame with Thermal Break:Fixed, Perf. Specs.: 18 --- --- 0.355 0.360 Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c) 22 --- --- 0.355 0.360 Window F copy 7: Metal Frame with Thermal Break:Fixed, Perf. Specs.: 18 --- --- 0.355 0.360 Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c) Window F copy 7: Metal Frame with Thermal Break:Fixed, Perf. Specs.: 18 --- --- 0.355 0.360 Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c) Window F copy 8: Metal Frame with Thermal Break:Fixed, Perf. Specs.: 18 --- --- 0.355 0.360 Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c) 1056 21.7 3.5 0.048 0.051 WEST Office EIFS West: Wood -Framed, 16" o.c., [Bldg. Use 3 - Dish One 555 21.7 5.0 0.045 0.051 Office] Window'A' copy 1: Metal Frame with Thermal Break:Fixed, Perf. 22 --- --- 0.355 0.360 Specs.: Product ID storefront, SHGC 0.34, PF 0.60, [Bldg. Use 3 - Dish One Office] (c) Window'A' copy 2: Metal Frame with Thermal Break:Fixed, Pert. 22 --- --- 0.355 0.360 Specs.: Product ID storefront, SHGC 0.34, PF 0.60, [Bldg. Use 3 - Dish One Office] (c) Window'A' copy 3: Metal Frame with Thermal Break:Fixed, Pert. 22 --- --- 0.355 0.360 Specs.: Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c) Window'A' copy 4: Metal Frame with Thermal Break:Fixed, Perf. 22 --- --- 0.355 0.360 Specs.: Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c) Door 7: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf. 27 --- --- 0.450 0.770 Specs.: Product ID P-CUW-22285, SHGC 0.18, PF 0.60, [Bldg. Use 3 - Dish One Office] (c) Office -Gym Framed West: Wood -Framed, 16" o.c., [Bldg. Use 3 - Dish 1056 21.7 3.5 0.048 0.051 One Office] Window'A' copy 3: Metal Frame with Thermal Break:Fixed, Perf. 22 --- --- 0.355 0.360 Specs.: Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c) Window'B': Metal Frame with Thermal Break:Fixed, Perf. Specs.: 10 --- --- 0.355 0.360 Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c) Wlndow'A' copy 4: Metal Frame with Thermal Break:Fixed, Pert. 22 --- --- 0.355 0.360 Specs.: Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c) Window W copy 5: Metal Frame with Thermal Break:Fixed, Perf. 22 --- --- 0.355 0.360 Specs.: Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c) Window'B' copy 1: Metal Frame with Thermal Break:Fixed, Perf. 10 --- --- 0.355 0.360 Specs.: Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c) Window'B' copy 2: Metal Frame with Thermal Break:Fixed, Pert. 10 --- --- 0.355 0.360 Specs.: Product ID storefront, SHGC 0.34, [Bldg. Use 3 - Dish One Office] (c) Gym - West: Other Metal Building Wall, [Bldg. Use 1 - Gym] (b) 3529 --- --- 0.055 0.052 Window'H': Metal Frame with Thermal Break:Fixed, Perf. Specs.: 150 --- --- 0.355 0.360 Product ID storefront, SHGC 0.34, [Bldg. Use 1 - Gym] (c) Project Title: Dish One Satellite Report date: 01/15/18 Data filename: S:\Drawings\715-Dish 1\Dish One.cck Page 3 of 11 Assembly Gross Area Cavity Cont. Proposed Budget U. or R -Value PI -Value U -Factor Factor(a) Perimeter Window C copy 2: Metal Frame with Thermal Break:Fixed, Pert. Specs.: 50 --- --- 0.355 0.360 Product ID storefront, SHGC 0.34, [Bldg. Use 1 - Gym] (c) Window: Metal Frame with Thermal Break:Fixed, Pert. Specs.: Product 63 --- --- 0.355 0.360 ID storefront, SHGC 0.34, PF 0.72, [Bldg. Use 1 - Gym] (c) Window C copy 3: Metal Frame with Thermal Break:Fixed, Pert. Specs.: 50 --- --- 0.355 0.360 Product ID storefront, SHGC 0.34, [Bldg. Use 1 - Gym] (c) Window C copy 4: Metal Frame with Thermal Break:Fixed, Ped. Specs.: 50 --- --- 0.355 0.360 Product ID storefront, SHGC 0.34, [Bldg. Use 1 - Gym] (c) Door 8: Glass (> 50% glazing):Metal Frame, Entrance Door, Pert. 24 --- --- 0.450 0.770 Specs.: Product ID P-CUW-22285, SHGC 0.16, PF 0.60, [Bldg. Use 1 - Gym] (c) Tenant - West: Other Metal Building Wall, [Bldg. Use 2 - Tenant 696 --- --- 0.055 0.052 Space] (b) Window'E' copy 1: Metal Frame with Thermal Break:Fixed, Perf. 64 --- --- 0.355 0.360 Specs.: Product ID storefront, SHGC 0.34, PF 0.40, [Bldg. Use 2 - Tenant Space] (c) Window'E' copy 2: Metal Frame with Thermal Break:Fixed, Ped. 64 --- --- 0.355 0.360 Specs.: Product ID storefront, SHGC 0.34, [Bldg. Use 2 - Tenant (a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements. (b) 'Other' components require supporting documentation for proposed U4actors. (c) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. (d) Slab -On -Grade proposed and budget U -factors shown in table are F -factors. (e) Thermal spacer block with minimum R-3.5 must be Installed above the purlin/baa, and the roof deck secured to the purlins. Envelope Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.0.2.8 and to comply withlhe mandatory requirements listed in the Inspection Checklist. 'I-- �') , .4,,-7 / / -Acclincez 1 /15 /18 Slanature Date Project Title: Dish One Satellite Report date: 01/15/18 Data filename: S:\Drawings\715-Dish 1\Dish One.cck Page 4 of 11 COMcheck Software Version 4.0.2.8 Inspection Checklist Energy Code: 2015 IECC Requirements: 0.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception Is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions & Re .ID 0103.2 Plans and/or specifications provide all❑Complies [PR111 Information with which compliance❑Does Not can be determined for the building i i 'envelope ❑Not Observable: and document where exceptions to the standard are ;❑Not Applicable claimed. 0402.4.1 ;The skylight area <= 3 percent of the ;❑Complies [PR1111 jgross roof area. 11 Does Not ❑Not Observable: ❑Not Applicable C402.4.1. !Vertical Fenestration Area Allowance: ;❑Complies 1 A maximum of 40 percent of gross ❑Does Not [PR1211 :above -grade wall area is permitted to be vertical fenestration area provided ❑Not Observable I >= 50 percent of the conditioned floor:❑Not Applicable ; :area is within a daylight zone, daylight: !responsive controls are installed, and glazing assemblies within the scope of j NFRC 200 have visible transmittance i >= 1.1 times SHGC. 0406 ,Plans, specifications, and/or❑Complies [PR9]1 :calculations provide all Information❑Does Not :with which compliance can be : determined for the additional energy :❑Not Observable Applicable :efficiency package options.❑Not Additional Comments/Assumptions: 1 I High Impact (Tier 1) IflM Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Dish One Satellite Report date: 01/15/18 Data filename: s:\Drawings\715-Dish 1\Dish One.cck Page 5 of 11 Section # Footing / Foundation Inspection Complies? Comments/Assumptions & Req.ID 0303.2 Slab edge Insulation installed per ❑Complies [FO412 manufacturer's instructions. ❑Does Not ❑Nat Observable I j❑Not Applicable C303.2.1 Exterior Insulation protected against❑Complies [FO6]1 damage, sunlight, moisture, wind, ❑Does Not landscaping and equipment Observable maintenance activities.❑Not j❑Not Applicable 0402.2.5 Slab edge insulation R -value. I❑Complies ;See the Envelope Assemblies table for values. [FO3]'❑Does Not I❑Not Observable; j❑Not Applicable C402.2.6 Radiant heating systems panels❑Complies '..See the Envelope Assemblies table for values. [FO12]3 insulated to >=R-3.5 on face opposite❑Does Not space being heated. [❑Not Observable, !❑Not Applicable Additional Comments/Assumptions: 111 High Impact (Tier 1) Iffil Medium Impact (Tier 2) r3! Low Impact (Tier 3) Project Title: Dish One Satellite Report date: 01/15/18 Data filename: S:\Drawings\715-Dish 1\Dish One.cck Page 6 of 11 Section # Framing / Rough -In Inspection Complies? Comments/Assumptions & Req.ID 0303.13 Fenestration products rated in',❑Complies [FR12]2 accordance with NFRC. ;❑Does Not I❑Not Observable: ❑Not Applicable 0303.1.3 Fenestration products are certified as I❑Complies [FR33]1 to performance labels or certificates ❑Does Not provided. ;❑Not Observable I ❑Not Applicable C402.4.3 Vertical fenestration SHGC value. ❑Complies ;See the Envelope Assemblies table for values. [FR10]1 ;❑Does Not ❑Not Observable 1❑Not Applicable j C402.4.3, Vertical fenestration U -Factor. I❑Complies ',See the Envelope Assemblies table for values. 0402.4.3.❑Does Not 4 1❑Not [FRB]❑Not Observable Applicable 0402.4.4 U -factor of Opaque doors associated ;❑Complies ;See the Envelope Assemblies table for values. [FR14]2 with the building thermal envelope :❑Does Not meets requirements. ❑Not Observable; j❑Not Applicable C402.5.1. The building envelope contains a I❑Complies 2.1 'continuous air barrier that Is sealed in I❑Does Not [FR19]1', an approved manner and material ❑Not Observable 1 I permeability <= 0.004 dfm/ft2. Air barrier penetrations are sealed in an❑Not Applicable approved manner. 0402.5.2, Factory -built fenestration and doors❑Complies C402.5.4 are labeled as meeting air leakage❑Does Not [FR18]3 requirements. ❑Not Observable j❑Not Applicable j C402.5.7 Vestibules are Installed on all building❑Complies [FR1713entrances. Doors have self-closing j❑Does Not devices. I❑Not Observable ❑Not Applicable j Additional Comments/Assumptions: 111 High Impact (Tier 1) IM Medium Impact (Tier 2) -r$; 1 Low Impact (Tier 3) Project Title: Dish One Satellite Report date: 01/15/18 Data filename: 5:\Drawings\715-Dish 1\Dish One.cck Page 7 of 11 # I Mechanical Rough -in Inspection I Complies? I Comments/Assumptions C402.5.5, Stair and elevator shaft vents have❑Complies C403.2.4. 'motorized dampers that automatically❑Does Not [ME3]3 'close.❑Not Observable: ❑Not Applicable C402.5.5, Outdoor air and exhaust systems have;❑Complies 0403.2.4. motorized dampers that automatically❑Does Not 3 shut when not in use and meet [ME58]3 :maximum leakage rates. Check I❑Not Observable; gravity dampers where allowed. t❑Not Applicable Additional Comments/Assumptions: 111 High Impact (Tier 1) MM Medium Impact (Tier 2) -331 Low Impact (Tier 3) Project Title: Dish One Satellite Report date: 01/15/18 Data filename: s:\Drawings\715-Dish 1\Dish One.cck Page 8 of 11 Section # Insulation InspectionComplies? 1 Comments/Assumptions 7 & Re .ID C303.1 ;Roof Insulation Installed per ;❑Complies [IN311 manufacturer's Instructions. Blown or ❑Does Not loose -fill Insulation Is installed !only Observable only where the roof slope is <=3 in❑Not I12. ❑Not Applicable C303.1 . Building envelope insulation Is labeled❑Complies [IN10]2 with R•value or Insulation certificate :[]Does Not providing R -value and other relevant data. !❑Not Observable; ❑Not Applicable j 0303.2 ',Above -grade wall Insulation Installed❑Complies [IN711 'aper manufacturer's instructions. ;❑Does Note, I❑Not Observable! ❑Not Applicable 0303.2.1 Exterior Insulation is protected from I❑Complies [IN1412 damage with a protective material. ;❑Does Not Verification for exposed foundation insulation may need to occur during ❑Not Observable Foundation Inspection. ;❑Not Applicable 0402.1.3 Non -swinging opaque doors have R- ;❑Compiles [IN19]3 4.75 Insulation. !ElDoes Not ,[]Not Observable; :[]Not Applicable j C402.2.1 Insulation Intended to meet the roof I❑Compiles [IN17]3 insulation requirements cannot beij❑Does Not installed on top of a suspended ceiling. Mark this requirement ❑Not Observable i compliant if insulation is Installed❑Not Applicable accordingly. C402.2.3 (Above -grade wall Insulation R -value. ;❑Complies ('See the Envelope Assemblies table for values. [IN6]1❑Does Not ❑Not Observable f j❑Not Applicable C402.2.5 Floor insulation R -value. ;❑Complies ;See the Envelope Assemblies table for values. [IN8]'❑Does Not I❑Not Observable j❑Not Applicable C402.2.6 Radiant panels and associated❑Complies [IN18)3 'components, designed for heat ❑Does Not transfer from the panel surfaces to the; Observable; occupants or indoor space are : insulated with a minimum of R-3.5.❑Not :❑Not Applicable j C402.4.2. Roof R -value. For some ceiling ;❑Complies (See the Envelope Assemblies table for values. 2' ,systems, verification may need to :[]Does Not [IN211 ;occur during Framing Inspection. j❑Not Observable! j❑Not Applicable 0402.5.1. IAII sources of air leakage in the❑Complies 1 :building thermal envelope are sealed, ❑Does Not [IN111 ;caulked, gasketed, weather stripped ❑Not Observable or wrapped with moisture vapor - permeable wrapping material to❑Not Applicable j minimize air leakage. Additional Comments/Assumptions: 111 High Impact (Tier 1) in Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: Dish One Satellite Report date: 01/15/18 Data filename: S:\Drawings\715-Dish 1\Dish One.cck Page 9 of 11 Section # Final Inspection Complies? Comments/Assumptions & Re .ID 0402.5.3 Where open combustion air ducts❑Complies [FI51]3 provide combustion air to open j❑Does Not combustion fuel burning appliances, Observable. the appliances and combustion air❑Not opening are located outside the❑Not Applicable building thermal envelope or enclosed in a room, isolated from Inside the thermal envelope. Such rooms are ,sealed and insulated. C402.5.6 I Weatherseals Installed on all loading ;❑Complies [F13711 !dock cargo doors.❑Does Not I❑Not Observable: ❑Not Applicable j 0402.5.8 Recessed luminaires In thermal I❑Complies [FI2613 envelope to limit infiltration and be IC ;❑Does Not rated and labeled. Seal between interior finish and luminaire housing. ❑Not Observable j❑Not Applicable Additional Comments/Assumptions: 111 High Impact (Tier 1) JMJ Medium Impact (Tier 2) 13 ILOW Impact( 3) Project Title: Dish One Satellite Report date: 01/15/18 Data filename: S:\Drawings\715-Dish 1\Dish One.cck Page 10 of 11 Project Title: Dish One Satellite Report date: 01/15/18 Data filename: S:\Drawings\715-Dish 1\Dish Onexck Page 11 of 11 6 COMcheck Software Version 4.0.7.2 Review �( Interior Lighting Compliance Certificate Project Information Energy Code: 2015 IECC Project Title: DISH ONE SATELLITE Project Type: New Construction Construction Site: Owner/Agent: Designer/Contractor: REXBURG, ID DISH ONE SATELLITE Payne Engineering ID 1823 E. Center Street Additional Efficiency Package Pocatello, 08-232 qq 93201 High efficiency HVAC. Systems that do not meet the performance requirement will be identified in the mechanical requirements checklist report. Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed Watts (11112) Watts / t12 (B X C) 1 -Office 6291 0.82 5159 2 -Gymnasium 10348 0.94 9727 Total Allowed Wafts = 14886 Proposed Interior Lighting Power A B C D E Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D) Fixture Fixtures Watt. 1 -Office LED 1: F2/F2E/F2SE: 2X2 LAYIN TROFFER: Other: 1 40 30 1200 LED 1 copy 1: F3: 2X2 LAYIN TROFFER: Other: 1 50 40 2000 LED 3: F4E: 6" RECESSED CAN: Other: 1 1 25 25 LED 4: F5: 4FT STRIP: Other: 1 3 30 90 LED 5: F6: 4FT LINEAR WALL: Other: 1 2 40 80 LED 6: F7/F7E: 4FT SURFACE WRAP: Other: 1 11 32 352 LED 7: F8:6" ROUND SURFACE: Other: 1 2 18 36 gymnasium LED 8: F9: 8FT STRIP: Other: 1 5 77 385 LED 9: F10/F10E: HIGH BAY LED: Other: 1 35 100 3500 Total Proposed Watts= 7668 ITterlor Linrtif a PAr- .. .- rq- ..- Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.0.7.2 Review and to comply with any applicable mandatory requirements listed In the Inspection Checklist. Project Title: DISH ONE SATELLITE Report date: 01/10/18 Data filename: \\PESERVER\Payne Engineering Data\2018\Dish One - 1804\05_Calculations\Comcheck\Dish Page 1 of 6 One.cck Mike Payne, Designer Mike Payne 01/10/2018 Name - Title Signature Date Project Title: DISH ONE SATELLITE Report date: 01/10/18 Data filename: \\PESERVER\Payne Engineering Data\2018\Dish One - 1804\05_Calculations\Comcheck\Dish Page 2 of 6 One.cck n�( COMcheck Software Version 4.0.7.2 Review Mechanical Compliance Certificate Project Information Energy Code: Project Title: Location: Climate Zone: Project Type: Construction Site: Rexburg, ID Additional Efficiency Package Unspecified Mechanical Systems List 2015 IECC Dish One Satellite Rexburg, Idaho 6b New Construction OwnerlAgent: DesignerlContractor: Dwayne Sudweeks Engineered Systems Assoc., Inc. 1355 E. Center St. Pocatello, ID 83201 208-233-0501 dcs@engsystems.com Quantity System Type & Description 3 HVAC System 1 (Single Zone): Healing: 1 each - Duct Furnace, Gas, Capacity = 106 kBtum Proposed Efficiency = 85.00% Ec, Required Efficiency = 80.00% Ec Cooting: 1 each - Single Package DX Unit, Capacity = 60 kBtu/h, Air -Cooled Condenser, Air Economizer Proposed Efficiency = 14.00 SEER, Required Efficiency: 14.00 SEER Fan System: FAN SYSTEM 1 -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 1 Supply, Constant Volume, 1800 CFM, 0.8 motor nameplate hp, 0.8 fan efficiency grade HVAC System 2 (Single Zone): Heating: 1 each - Duct Furnace, Gas, Capacity = 98 kBtu/h Proposed Efficiency - 85.00% Ec, Required Efficiency - 80.00% Ec Cooling: 1 each - Single Package DX Unit, Capacity - 49 kBtu/h, Air -Cooled Condenser, Air Economizer Proposed Efficiency - 14.00 SEER, Required Efficiency: 14.00 SEER Fan System: FAN SYSTEM 1 -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 1 Supply, Constant Volume, 1800 CFM, 0.6 motor nameplate hp, 0.8 fan efficiency grade HVAC System 3 (Single Zone): Heating: 1 each - Duct Furnace, Gas, Capacity = 284 kBtu/h Proposed Efficiency - 85.00% Ec, Required Efficiency = 80.00% Ec Cooling: 1 each - Single Package DX Unit, Capacity = 180 kBtu/h, Air -Cooled Condenser, Air Economizer Proposed Efficiency - 10.80 EER, Required Efficiency: 10.80 EER i 12.2 IEER Fan System: FAN SYSTEM 2 -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 2 Supply, Constant Volume, 6000 CFM, 3.0 motor nameplate hp, 0.9 fan efficiency grade Water Heater 1: Gas Storage Water Heater, Capacity: 50 gallons, Input Rating: 65 kBtu/h Proposed Efficiency: 85.00 EF, Required Efficiency: 0.58 EF Project Title: Dish One Satellite Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Dish One.cck Report date: 01/12/18 Page 1 of 11 Mechanical Compliance Statement Compliance Statement: The proposed mechanical design represented in this document Is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2015 IECC requirements in COMche k Version 4.0.7.2 Review and to comply with any applicable m datory requirements listed in the Inspection Checklist, T Name-Title Signa ure Date Project Title: Dish One Satellite Report date: 01/12/18 Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Dish One.cck Page 2 of 11 eCOMcheck Software Version 4.0.7.2 Review �(J Inspection Checklist Energy Code: 2015 IECC Requirements: 0.0% were addressed directly in the COMcheck software Text In the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that Is documented, or that an exception Is being claimed. Where compliance Is Itemized in a separate table, a reference to that table is provided. # 6 Re .ID I Plan ReviewComplies? I Comments/Assumptions 0303.2 _ Plans, specifications, and/or _ ❑Complies [PR211 calculations provide all information []Does Not with which compliance can be determined for the mechanical ❑Not Observable systems and equipment and ❑Not Applicable document where exceptions to the standard are claimed, Load calculations per acceptable engineering standards and handbooks. 0103.2 Plans, specifications, and/or ❑Complies (PR311 calculations provide all Information ❑Does Not with which compliance can be ❑Not Observable determined for the service water heating systems and equipment and ❑Not Applicable document where exceptions to the standard are claimed. Hot water system sized per manufacturer's sizing guide. C406 Plans, specifications, and/or ❑Complies (PR911 calculations provide all Information ❑Does Not with which compliance can be (]Not Observable determined for the additional energy efficiency package options. ❑Not Applicable Additional Comments/Assumptions: 1 I High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) 1 Project Title: Dish One Satellite Report date: 01/12/18 Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Dish One.cck Page 3 of 11 cIon # Foundation Inspection Footing / Fou om cpllesi mm Coin ents/Assn ptlons e .ID 3.2.4. Snow/ice melting system sensors for ❑Complies future connection to controls. Freeze ❑Does Not 3.2.4. protection systems have automatic []Not Observable It3 controls Installed. ❑Not Applicable Additional Comments/Assumptions: 1 IHigh Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Dish One Satellite Report date: 01/12/18 Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Dish One.cck Page 4 of 11 III e .10 I Plumbing Rough -In InspectionI Complies? 3.5, _ Heated water supply piping conforms ❑Complies 3.5.1, to pipe length and volume ❑Does Not 3.5.2 13 requirements. Refer to section details. ❑Not Observable :404.6.3 Pumps that circulate water between a ❑Not Applicable C4O4.5, Heated water supply piping conforms UComplies C4O4.5.1, to pipe length and volume []Does Not C40435.2 requirements. Refer to section details. ❑Not Observable (PL6) ❑Not Applicable Heated water supply piping conforms UComplles to pipe length and volume ❑Does Not requirements. Refer to section details. []Not Observable ❑Not Applicable 404.5, Heated water supply piping conforms UComplles 404.5.1, to pipe length and volume ❑Does Not 404.5.2 requirements. Refer to section details. ❑ 'PL613 Not Observable []Not Applicable 404.6.3 Pumps that circulate water between a UComplles PL713 heater and storage tank have controls []Does Not through a cold -water supply pipe Is a demand recirculation water system. that limit operation from startup to ❑Not Observable <= 5 minutes after end of heating cycle, ❑Not Applicable :404.6.3 Pumps that circulate water between a ❑Complies PL713 heater and storage tank have controls ❑Does Not entering the cold -water piping to that limit operation from startup to ❑NoF Observable <= 5 minutes after end of heating cycle. ❑Not Applicable Pumps that circulate water between a UComplles heater and storage tank have controls ❑Does Not that limit operation from startup to ❑Not Observable <m 5 minutes after end of heating cycle, ❑Not Applicable Pumps that circulate water between a UComplies heater and storage tank have controls ❑Does Not that limit operation from startup to ❑Not Observable <= 5 minutes after end of heating cycle, ❑Not Applicable Water distribution system that pumps UComplles water from a heated -water supply ❑Does Not pipe back to the heated -water source []Not Observable through a cold -water supply pipe Is a demand recirculation water system. ❑Not Applicable Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold -water piping to 104°F. Comments/Assumptions 11 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Dish One Satellite Report date: 01/12/18 Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Dish One.cck Page 5 of 11 Section UComplles 1PL813 water from a heated -water supply # Plumbing Rough -0n Inspection Complies? through a cold -water supply pipe is a ❑Not Applicable demand recirculation water system. C404.7 Water distributsystem that pumps Fon ❑Complies [PL813 water from a heated -water supply ❑Does Not pipe back to the heated -water source []Not Observable limits the temperature of the water through a cold -water supply pipe Is a []Not Applicable demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold -water piping to 104°F. C404.7 Water distribution system that pumps ❑Complies PI -813 water from a heated -water supply ❑Does Not pipe back to the heated -water source ❑Not Observable through a cold -water supply pipe is a ❑Not Applicable demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold -water piping to Comments/Assungrtl Otis C404.7 Water distribution system that pumps UComplles 1PL813 water from a heated -water supply ❑Does Not pipe back to the heated -water source ❑Not Observable through a cold -water supply pipe is a ❑Not Applicable demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold -water piping to 104°F. Additional Comments/Assumptions: 11 Nigh Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: Dish One Satellite Report date: 01/12/18 Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Dish One.cck Page 6 of 11 Section #Mechanical Rough -In Inspection complies? Comments/Assumptions & Re .ID C402.2.6 Thermally Ineffective panel surfaces of _ ❑Complies (ME4113 sensible heating panels have []Does Not Insulation >= R-3.5. []Not Observable ❑Not Applicable _ 0403.2.13 Unenclosed spaces that are heated ❑Complies (ME7112 use only radiant heat. ❑Does Not []Not Observable ❑Not Applicable C403.2,3 HVAC equipment efficiency verified. ❑Complies See the Mechanical Systems list for values. IME5513 []Does Not []Not Observable ❑Not Applicable _ __ 0403.2.4. Fault detection and diagnostics _ ❑Complies 7 installed with air-cooled unitary DX []Does Not IME11312 units having economizers. ❑Not Observable ❑Not Applicable 0403,2.4. Fault detection and diagnostics ❑Complies 7 Installed with air-cooled unitary DX ❑Does Not [ME11312 units having economizers. ❑Not Observable ❑Not Applicable C403.2.6. Demand control ventilation provided ❑Complies 1 for spaces >500 R2 and >25 (]Does Not [ME5911 people/1000 ft2 occupant density and []Not Observable served by systems with air side Not Applicable economizer, auto modulating outside air damper control, or design airflow >3,000 cfm. C403.2,6, Enclosed parking garage ventilation ❑Complies 2 has automatic contaminant detection []Does Not (ME1151) and capacity to stage or modulate ❑Not Observable fans to 50% or less of design capacity. ❑Not Applicable 0403.2,7 Exhaust air energy recovery on ❑Complies [ME5711 systems meeting Table C403.2,7(1) []Does Not and C403.2.7(2). ❑Not Observable ❑Not Applicable C403.2.8 Kitchen exhaust systems comply with ❑Complies (ME11613 replacement air and conditioned [)Does Not supply air limitations, and satisfy hood ❑Not Observable rating requirements and maximum ❑Not Applicable exhaust rate criteria. PP e C403.2.9 HVAC ducts and plenums insulated. ❑Complies (ME6012 Where ducts or plenums are Installed []Does Not In or under a slab, verification may ❑Not Observable need to occur during Foundation ❑Not Applicable '.Inspection. C403.2,9 Ducts and plenums sealed based on ❑Complies (ME1013 static pressure and location. ❑Does Not ❑Not Observable ❑Not Applicable 0403.2,9, Ductwork operating >3 in. water _ ❑Complies 1.3 column requires air leakage testing, ❑Does Not [ME1113 []Not Observable ❑Not Applicable 111 High Impact (Tier 1) 2 Medium Impact (Tier 2) 13 Low Impact (Tier 3) Project Title: Dish One Satellite Report date: 01/12/18 Data filename: CAUsers\Dwayne 15\Documents\COMcheck\DIsh One.cck Page 7 of 11 section # Mechanical Rough -In Inspection Compiles? Comments/Assumptions & Re .ID C403.2.9, Ductwork operating >3 in. water ❑Complies _ 1.3 column requires air leakage testing. []Does Not (ME1113 ❑Not Observable []Not Applicable C403.2,9. Ductwork operating >3 In. water ❑Complies 113 column requires air leakage testing. ❑Does Not [ME1113 ❑Not Observable ❑Not Applicable C403.3 Air economizers provided where _ ❑Complies IME6211 required, meet the requirements for ❑Does Not design capacity, control signal, ventilation controls, high -limit shut-off, Not Observable Integrated economizer control, and ❑Not A Iicable pP provide a means to relieve excess outside air during operation. 04033 Air economizers provided where ❑Complies [ME6211 required, meet the requirements for ❑Does Not design capacity, control signal, ventilation controls, high -limit shut-off, []Not Observable Integrated economizer control, and []Not Applicable pP provide a means to relieve excess outside air during operation. 0403,4.4. Multiple zone VAV systems with DDC ❑Complies See the Mechanical Systems list for values. 6 of individual zone boxes have static ❑Does Not IME31013 pressure setpolnt reset controls. [_]Not Observable ❑Not Applicable C403.4.4. Multiple zone VAV systems with DDC ❑Complies See the Mechankal Systems list for values. 6 of individual zone boxes have static []Does Not IME11013 pressure setpolnt reset controls. ❑Not Observable ❑Not Applicable C403.4.4. Multiple zone VAV systems with DDC ❑Complies See the MechanlcalSystems list for values. 6 of individual zone boxes have static ❑Does Not [ME11013 pressure setpoint reset controls. ❑Not Observable ❑Not Applicable_ 0404.2.1 Gas-fired water -heating equipment ❑Complies [ME111)2 Installed In new buildings: where a ❑Does Not singular piece of water -heating ❑Not Observable equipment >- 1,000 kBtu/h serves ❑Not Applicable the entire building, thermal efficiency >= 90 Et. Where multiple pieces of water -heating equipment serve the building with combined rating >- 1,000 kBtu/h, the combined input - capacity -weighted -average thermal efficiency >= 90 Et. Exclude Input rating of equipment in Individual dwelling units and equipment <- 100 kBtu/h. C408.2.2. Air outlets and zone terminal devices ❑Complies 1 have means for air balancing. ❑Does Not IME5313 ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 1HIgh Impact (Tier 1) _ I.2 Medium Impact (Tier 2) 13 low Impact (Tier 3) Project Title: Dish One Satellite Report date: 01/12/18 Data filename: C:\Users\Dwayne 15\Documents\C0Mchec1k\Dish One.cck Page 8 of 11 Section # Final Inspection CompllesT Comments/Assumptions & Re .ID I _ 0303.3, Furnished O&M manuals for HVAC ❑Complies C408.2.5. systems within 90 days of system ❑Does Not 3 [FI813 acceptance. []Not Observable ❑Not Applicable 0403.2.2 HVAC systems and equipment ❑Complies [F12713 capacity does not exceed calculated ❑Does Not loads. []Not Observable ❑Not Applicable 0403,2,4. Heating and cooling to each zone Is ❑Complies 1 controlled by a thermostat control. ❑Does Not IF14711 Minimum one humidity control device ❑Not Observable per Installed humidification/dehumidification ❑Not A pplicable system. C403.2.4. Heating and cooling to each zone is ❑Complies 1 controlled by a thermostat control. ❑Does Not IFI47]3 Minimum one humidity control device ❑Not Observable per Installed ❑Not Applicable pplicable system. C403.2.4. Heating and cooling to each zone is ❑Complies 1 controlled by a thermostat control. ❑Does Not (FI47)3 Minimum one humidity control device ❑Not Observable per installed humidification/dehumidification []Not Applicable system. C403.2.4. Thermostatic controls have a 5 °F ❑Complies 1.2 deadband. []Does Not [F13813 ❑Not Observable ❑Not Applicable C403.2.4. Temperature controls have setpoint ❑Complies 1.3 overlap restrictions. []Does Not [F12013 ❑Not Observable ❑Not Applicable C403.2.4. Each zone equipped with setback ❑Complies 2 controls using automatic time clock or []Does Not IF139]3 programmable control system. []Not Observable ❑Not Applicable C403.2.4. Automatic Controls; Setback to SS°F ❑Complies 2.1, (heat) and 85°F (cool); 7 -day clock, 2- []Does Not C403.2.4. hour occupant override, 10 -hour []Not Observable 2.2 [F140)3 backup ❑Not Applicable 0403,2.4, Systems Include optimum start ❑Complies 2.3 controls. ❑Does Not V14113 []Not Observable ❑Not Applicable C403.2.4. Systems include optimum start ❑Complies 2.3 controls. ❑Does Not IFI4113 []Not Observable ❑Not Applicable C403.2.4. Systems Include optimum start ❑Complies 2.3 controls. ❑Does Not IF141)3 ❑Not Observable ❑Not Applicable 1 High Impact (Tier 1) 2 Medium Impact (Tier 21 3 Low Impact (Tier 3) Project Title: Dish One Satellite Report date: 01/12/18 Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Dlsh One.cck Page 9 of 11 Section. N Final Inspection Complies? Comments/Assumptions I & Req.ID. __ _ 0404.3 Heat traps installed on supply and ❑Complies (Fill 13 discharge piping of non -circulating ❑Does Not systems. ❑Not Observable ❑Not Applicable _ C404.4 All piping insulated in accordance with []Complies [F12512 section details and Table C403,2.10. []Does Not ❑Not Observable ❑Not Applicable C408.2.1 Commissioning plan developed by ❑Complies [F12813 registered design professional or []Does Not approved agency, []Not Observable ❑Not Applicable 0408.2.3. HVAC equipment has been tested to ❑Complies 1 ensure proper operation. []Does Not [F13111 QNot Observable ❑Not Applicable 0408.2.3. HVAC control systems have been ❑Complies 2 tested to ensure proper operation, ❑Does Not IFI101' calibration and adjustment of controls. ❑Not Observable ❑Not Applicable 0408.2.3. Economizers have been tested to ❑Complies 3 ensure proper operation. ❑Does Not IF13211 ❑Not Observable ❑Not Applicable 0408.2.4 Preliminary commissioning report ❑Complies (F12911 completed and certified by registered ❑Does Not design professional or approved []Not Observable agency, ❑Not Applicable 0408.2.5. Furnished HVAC as -built drawings [Complies 1 submitted within 90 days of system ❑Does Not IFI713 acceptance. []Not Observable ❑Not Applicable 0408,2.5. An air and/or hydronic system ❑Complies 3 balancing report is provided for HVAC ❑Does Not [F14311 systems. ❑Not Observable ❑Not Applicable 0408.2.5. Final commissioning report due to ❑Complies 4 building owner within 90 days of ❑Does Not (F13011 receipt of certificate of occupancy. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 I High Impact (Tier 1) 2 Medium Impact (Tier 2) 13 Itow, Impact (Tier 31 Project Title: Dish One Satellite Report date: 01/12/18 Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Dish One,cck Page 10 of 11 Project Title: Dish One Satellite Report date: 01/12/18 Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Dish One.cck Page 11 of 11