Loading...
HomeMy WebLinkAboutCONCRETE TEST 8 - 19-00723 - Mountain America Credit Union Office - Call CenterProject Name: Client: Mix Number: Project Number: Ticket Number: Load Amount: Admixtures: Tested By: Date and Time: Compressive Strength of Concrete Test Specimens Field Test Data: (ASTM C143, C138, C173, C231, C31, C1064, and C511) Slump (Inches): Entrained Air (%): Concrete Temperature: Ambient Temperature: Test Results:Minimum:Maximum: Cylinder # Lab Test Data: (ASTM C39, C42, C617, and C1231) Break Age Cylinder Diameter (in) Area (in² ) Break Date Maximum Load (lbs) Break Type Compressive Strength (psi)Required 28 day Strength (psi) °F °F Reviewed By: Supplier: Test Location: Unit Weight (PCF):Set # : Cylinders Picked Up By: Date and Time: Hi / Low Temperatures Remarks: 28-day Average Strength 6,271 PSI MACU Call Center Big-D Construction 1421 20023 17613 10 Yards MP 322 BASF MAC 360FF L. Steiner 09/15/2020 5:30 AM 5 1.2 65.8 42 338A 338E 338C 338B 338D 4 4 4 4 09/22/20 10/13/20 10/13/20 10/13/20 48,460 79,060 77,300 80,090 3 4,0003,855 6,289 6,149 6,371 Digitally signed by Jacob Christensen Date: 2020.10.14 09:03:22 -06'00' 12.57 Walters Ready Mix Inc. Second Floor Interior 7 28 28 28 H 12.57 12.57 12.57 1 of 2 09/16/2020 1 2 2