Loading...
HomeMy WebLinkAboutPRE-CONSTRUCTION CHECKLIST - 08-00122 & 08-00123 - Rexburg US Welding - Cylinder DockC Building Safety Departmentik City of Rexburg ici }°'�E X.4 U #V 19 E. Main janellh@rexburg.org Phone: 208.359.3020 ext 326 _ C' _..�'�._'_�.'m__ Rexburg, ID 83440 www.rexburg.org Fox: 208.359.3024 �rizerica's Family Con:r�,uunic}= iF Seismic Design Category — D (unless soil evaluation confirms category C) Ground Snow — 50 lbs. per sq. ft. Office Hours: Monday -Friday 8:OOam-4:OOpm struction C Roof Snow Load — 35 lbs. per sq. ft. Wind Load — 90 MPH Frost Depth — 36" The following items should be completed be oreyou submityour building permit application. ComPletion of BuBd'n9PemVtAPPyca60= You may print this application from our website Nvww.rexburg_org or pick up a copy at the City Annex Building (address above). Commercial Permits (the following must be submitted with the Application) 21 4 sets of site plans and 2 sets of building plans stamped by a licensed professional ✓� Site plans and building plans in PDF format must be submitted after plans have been approved. ❑ Structural Calculations stamped by a licensed Engineer ❑ Energy Compliance Report: As per the 2003 IECC, a Compliance check must be completed and submitted (the comcheck is available online at w-ameneracode_s.gov). Please complete the envelope, mechanical & lighting sections. Q✓ Page 2 of the Application must include the Idaho Contractor's Registration Number or the exemption form must be completed and sued, see Page 9. ❑ Page 4 of the Application must be completed and signed by your Plumber. ❑ Page 5 of the Application must be completed by signed by your Mechanical Contractor. ❑ Mechanical system sizing and design. ❑ Page 6 of the Application must be completed and signed by your Electrician. ❑ Electrical layout must be included with the building plans. Plans will be reviewed by the electrical inspector prior to issuance of the building permit. ❑ Emergency Services Construction Permit ❑ Lighting Plan Electrical Permits are now issued through the City of Rexburg. See Page 6 of the application. Remodels: If you are considering a remodel, a gM of the bid or estimate for the remodel must be submitted with the Permit Application. • 2 set of plans (may need IECC Review) • Additions — Same as new construction