HomeMy WebLinkAboutCOMCHECK - 08-00087 - Upper Valley Industries - CANCELLED2003 IECC
COMct,eck Software Version 3.4.0
Envelope Compliance Certificate
Report Date: 02/21/08
Data filename: C:Wsers\Newell's Computer,Desktop%UVI–IUVI–admin.cck
Section 1: Project Information
1: 111::' ••
Upper Valley Industries
Project Title: Upper Valley Industries - New Administration & Classroom Building
Construction Site: Owner/Agent: Designer/Contractor:
Rexburg Business Park Upper Valley Industries Newell Goldsberry
Rexburg, ID 16th North 2nd East Sundberg & Assoc., Inc.
Rexburg, ID 111 E. 16th Street
Idaho Falls, ID
208-522-6901
Section 2: General Information
Building Location (for weather data):
Rexburg, Idaho
Climate Zone:
16
Heating Degree Days (base 65 degrees F):
8693
Cooling Degree Days (base 65 degrees F):
143
Project Type:
New Construction
Vertical Glazing/ Wall Area Pct.:
16%
Activity Type(s)
Floor Area
Office
2454
Dining
1098
Classroom/Lecture Hall
6210
Section 3: Requirements Checklist
L+. lr us L� j�
FEB 21 2008 1
CITY OF REXBl1RG
ri.'a'Y`.F'.xs'ri�;F 53'a��.k. 4..°.'�.'�'6.�L �Ij�, NC.e M '.✓� .y.�.�i"s.�.w+r"�
S-'k�
'`
Y�32ST.'
Climate -Specific Requirements:
Component Name/Description
Gross Area
Cavity
Cont. Proposed
Budget
or Perimeter
R -Value
R -Value U -Factor
U•Factor
_ Orientation: NORTH
Exterior Wall 4: Wood Frame, Any Spacing
746
19.0
0.0 0.068
0.067
Window 5: Vinyl Frame:Double Pane with Low -E, Clear, SHGC 0.36
100
—
-- 0.320
0.520
Door 5: Glass, Clear, SHGC 0.32
49
--
-- 0.590
0.520
Door 6: Glass, Clear, SHGC 0.32
38
—
— 0.590
0.520
Orientation: EAST
Exterior Wall 3: Wood Frame, Any Spacing
1509
19.0
0.0 0.068
0.067
Window 4: Vinyl Frame:Double Pane with Low -E, Clear, SHGC 0.36
160
—
–• 0.320
0.520
Door 4: Solid
96
--
–• 0.150
0.112
Orientation: SOUTH
Exterior Wall 2: Wood Frame, Any Spacing
746
19.0
0.0 0.068
0.067
Window 3: Vinyl Frame:Double Pane with Low -E, Clear, SHGC 0.36
80
—
–• 0.320
0.520
Door 2: Solid
72
—
— 0.150
0.112
Door 3: Glass, Clear, SHGC 0.32
49
--
.•. 0.590
0.520
Orientation: WEST
Exterior Wall 1: Wood Frame, Any Spacing
1509
19.0
0.0 0.068
0.067
Upper Valley Industries - New Administration & Classroom Building
Page 1 of 2
Window 1: Vinyl Frame:Double Pane `� Low -E, Clear, SHGC 0.36
180 --
-- 0.320
0.520
Window 2: Metal Frame with Thermal _ .eak:Double Pane with
67 --
-- 0.590
0.520
Low -E, Clear, SHGC 0.32
Door 1: Solid
24 --
--- 0.150
0.112
Orientation: UNSPECIFIED ORIENTATION
Roof 1: All -Wood Joist/Rafter/Truss
9762 38.0
0.0 0.026
0.047
Floor 1: Slab-On-Grade:Unheated
471 ---
-- --
--
(a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements
Air Leakage, Component Certification, and Vapor Retarder Requirements:
F-1 1. All joints and penetrations are caulked, gasketed or covered with a moisture vapor -permeable wrapping material installed in
accordance with the manufacturer's installation instructions.
r -i 2. Windows, doors, and skylights certified as meeting leakage requirements.
I] 3, Component R -values & U -factors labeled as certified.
4. Insulation installed according to manufacturer's instructions, in substantial contact with the surface being insulated, and in a
manner that achieves the rated R -value without compressing the insulation.
❑ 5. Stair, elevator shaft vents, and other dampers integral to the building envelope are equipped with motodzed dampers.
6. Cargo doors and loading dock doors are weather sealed.
7. Recessed lighting fixtures are: (i) Type IC rated and sealed or gasketed; or (ii) installed inside an appropriate air -tight assembly
with a 0.5 inch clearance from combustible materials and with 3 inches clearance from insulation material.
8. Building entrance doors have a vestibule and equipped with closing devices.
Exceptions:
Building entrances with revolving doors.
Doors that open directly from a space less than 3000 sq. ft. in area.
❑ 9. Vapor retarder installed.
Section 4: Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications
and other calculations submitted with this permit application, The pro velope system has been designed to meet the 20031ECC
requirements in COMcheck Version 3.4.0 and to comply with the m6ndat.QAPrqquIremerjp ig the Requirements Checklist.
Upper Valley Industries - New Administration & Classroom Building Page 2 of 2
COM ci,_ .:k Software Version 3.4.0
Envelope Compliance Certificate
2003 IECC
Report Date: 02/21/08
Data filename: C:\Users\Newell's Computer\Desktop\UVI–\UVI–admin.ock
Section 1: Project Information
Project Title: Upper Valley Industries - New Administration & Classroom Building
Construction Site: Owner/Agent:
Designer/Contractor:
Rexburg Business Park Upper Valley Industries
Newell Goldsberry
Rexburg, ID 16th North 2nd East
Sundberg & Assoc., Inc.
Rexburg, ID
111 E. 16th Street
Project Type:
Idaho Falls, ID
Vertical Glazing / Wall Area Pct.:
208-522-6901
Section 2: General Information
Building Location (for weather data):
Rexburg, Idaho
Climate Zone:
6b
Heating Degree Days (base 65 degrees F):
8693
Cooling Degree Days (base 50 degrees F):
1446
Project Type:
New Construction
Vertical Glazing / Wall Area Pct.:
4%
Building Tvoe
Floor Area
Storage, Industrial and Commercial
19650
Section 3: Requirements Checklist
Climate -Specific Requirements:
Component Name/Description
Roof 1: Metal Building, Standing Seam
Exterior Wall 1: Metal Building Wall
Window 1: Metal Frame:Double Pane with Low -E, Tinted, Factory
Assembled, SHGC 0.36
Door 1: Insulated Metal, Swinging
Door 2: Glass, Clear, SHGC 0.36
Door 3: Insulated Metal, Non -Swinging
Floor 1: Slab-On-Grade:Heated
Gross Area Cavity Cont. Proposed Budget
or Perimeter R -Value R -Value U -Factor U -Factor
19650 38.0
0.0 0.046
0.065
10930 19.0
0.0 0.070
0.057
360 ---
— 0.320
0.350
96 --
--- 0.150
0.700
38 --
-- 0.320
0.500
358 --
--- 0.150
0.500
619 --
--- ---
(a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements.
Air Leakage, Component Certification, and Vapor Retarder Requirements:
1. All joints and penetrations are caulked, gasketed or covered with a moisture vapor -permeable wrapping material installed in
accordance with the manufacturer's Installation instructions.
2. Windows, doors, and skylights certified as meeting leakage requirements.
O 3. Component R -values & U -factors labeled as certified.
O 4. Insulation installed according to manufacturer's Instructions, In substantial contact with the surface being insulated, and in a
manner that achieves the rated R -value without compressing the Insulation.
5. Stair, elevator shaft vents, and other outdoor air intake and exhaust openings in the building envelope are equipped with motorized
dampers.
6. Cargo doors and loading dock doors are weather sealed.
7. Recessed lighting fixtures are: (i) Type IC rated and sealed or gasketed; or (it) installed inside an appropriate air -tight assembly
with a 0.5 inch clearance from combustible materials and with 3 inches clearance from insulation material.
Page 1 of 2
Exceptions: 1
Building entrances with revolving doors.
Doors that open directly from a space less than 3000 sq. ft. in area.
0 9. Vapor retarder installed.
Section 4: Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications
and other calculations submitted with this permit application. The prop e�d. \rvelope system has been designed to meet the 2004 ECC
requirements in COMcheck Version 3.4.0 and to comply with them ndat rquirem Is in the Requirements Checklist.
Al�P
Nme - Title Sionature Date
Page 2 of 2