HomeMy WebLinkAboutSITE PLAN REVIEW CHECKLIST - 08-00085 - Upper Valley Industries - Site PlanI
Site Plan Review Checklist
Project: 10 y 1/4 UtY .2 us?AO's
Permit# O% OZ8S
Zone: tZr;r,Z bWAZA'- (L- +O YEV.M C,),Qf"QAr(E)
Surrounding Land Uses: Cf'2u6 sa A
Elevations submitted: 1'E5
Landscape Plan submitted: re S
Lighting Plan submitted: p� Tui ^Em p"orc.LT-ac r""rovrW
ALE BKTC1-W� OMTS�ztTa
ReuulreC ProvHM Apgovetli
Use Consistent with zoning designation
I,=
1-2
rE S
Compliance with Comprehensive Plan
�p
Sn1�
rgS
Flood Plain Check
�v
YES
Plans are to scale
North arrow
YDS
r6S
YDS
Building Coverage
LA
res
Building setbacks:
Frontyard
Side yard doh
Backyard No}e
%L 30'
-LJ
rb'w 30'
YfS
Y6
—
_
y£S
—
—
rEs
Building Height
c(SMex
Zy
Yt5
Minimum distance between buildings
V G
N
_
Clear site tirangle
N a
N �
S
Driveway, parking lot dimensions
v ccuf
Y65
Parking space #
�
Parking space sizes
tofu 'cam
&L'
ES
Parking isle widths
7-1.-'
't- 1-'
re -5
Handicapped requirements
z s/+cE�
`Lrr+cos
r�
Unloading, loading area
s
Parking spaces located in close proximity to buildings
S
Sidwalks along right of way
S
5
ES
Internal pedestrian walkways 066b G' s2oEv-L+cz AMFrs -96-r-
VENSC L, 01 6g '"AG LOU- OICVN
5 yr 6
Snow storage d oX
7 z
h S
Open/common spaces functional?
Fencing/screening (HVAC equipment, dumpsters, parking, etc.)
Trash dumpster shown and screened
Buffering/landscaping requirements
Lighting
Design standards
Committee Meeting Held (If needed