RE: Review Comments
Permit Number 08 00081
Electrical Wholesale Supply Co., Inc.
7aNell,
08 OC 81 & 08 00082
Electrical Wholesale
Revisions 3/20/08
Idaho Falls, ID 83403-2212 6 Telephone 2081522.8779 • Fax 2081522.8785
oD
MAO 2 zona
CITY OF REXBURG
We received the review comments for the referenced project and submit the following response.
Please forward to the respective departments.
SITE PLAN REVIEW
Planning Staff Review:
1. The snow storage area has been recalculated to be based on the impervious parking area.
Snow storage calculations are shown on plan sheet A0.1. Snow storage areas are landscaped.
2. Landscape has been added along Highway 20 as shown on plan sheet Ll. 1.
3. Photometric layout has been added to the electrical site plan, plan sheet E-1. Fixture cuts are
attached. Exterior lighting is "Night Sky Compliant"
4. Wall on the north property line is a 6-0" tall masonry wall (see detail K/A0.2). It will be
constructed with the same materials as the building.
5. The ditch can be accessed from Airport Road. There is not an access easement to the ditch
through the property therefore it is our opinion that we do not have to provide access to the
ditch. The new masonry fence will be located 20'-0" off the property line and 10'-0" from the
high point of the ditch bank. This allows enough room between the fence and the ditch bank
to maintain the ditch. The outdoor storage area will only be un -locked during business hours
and providing access to the ditch through the locked storage area would jeopardize security.
6. Fencing has been revised such that the 'Ace is not located in the 10'-0" front yard .
Scott L Nielson, A I A Kevin R. Bodily,arA. James H. Wyatt,n.ia.
Members of The American Institute of Architects
Public Works Review:
Drawings will be changed to reference Rexburg standard. The referenced was obtained from
The City of Rexburg Development Code, page 18, Standard Drawings and Specifications
indicates "drawings and specifications are defined as The Idaho Falls Engineering Department
Standards......"
2. Razor wire has been eliminated from project.
Dumpster enclosure de/tails are shown on plan sheet A0.2, detail M and elevation K.
Fire Department Review:
Materials Testing and Inspection (MT1) has been retained to performed hydrant flow test.
Test are scheduled for the week of March 17�'. When the results are complete they will be
transmitted to the City.
2. International Fire Code - 2006 section B 105.2, exception allows a fire flow reduction of up
to 75% when the building is provided with an automatic fire sprinkler system. However the
fire flow can not be less than 1,750 g.p.m. Table B105.1 requires a building with our
construction type and size to have a 2,500 g.p.m. fire flow for 2 hours. With reduction noted
above the actual required fire flow is 1,750 g.p.m. for 2 hours. Per table C105.1 a building
with a fire flow of 1,750 or less is only required to have one fire hydrant.
The walls are 22'-8" tall. The building will have high piled storage and the fire sprinkler
system will be designed accordingly.
4. As indicated above required fire flow is 1,750 g.p.m. for 2 hours.
COMMERCIAL NEW
Administrative Review:
The project has not bid yet, therefor we do not know who the general contractor and sub-
contractors are. We the contractor has been selected they will be instructed to provide this
information.
2. A 2" water meter will be installed. It will be installed inside the mechanical room. It will be
provided with a remote reading device.
Building Department Review:
Materials Testing and Inspection has been retained to provided special inspections.
2. Contractor will be notified of requirements for plumbing inspections.
Fire Department Review:
Two 4-A:60-B:C fire extinguishers have been specified for this project. One is located in Hall
107 and the other in Counter Area 101.
Fire sprinkler plans will be submitted to the State Fire Marshall for approval prior to installing
the system.
The fire alarm control panel is located in Mechanical Room 106. Plans will be submitted to
the City of Rexburg for approval prior to installing the system.
4. The requirement for a fire department lock box has been added, see plan sheet Al. 1.
I believe that you will find all is in order. If you have any questions or need any additional
information please do not hesitate to contact our office. Please let me know when the building permit
is ready.
Sincerely, p
es ya��AIA
elson Bodily &Associates, P.A.