HomeMy WebLinkAboutCOMCHECK - 08-00040 - BYU-I Auditorium - Chiller Building Addition�( COMcheck Software V1 Envelope Com 2006 IECC 0800040 M LSI Chiller Bldg Addition Report Date: 01/15/08 Gross Area Cavity Data filename: 44465-BYU-I Central CHW Plant\Chlller Bldg.cck Proposed Section 1: Project Information Project Type: Addition R -Value Project Title : BYU-1 Chiller Buiding Expansion U -Factor Construction Site: Owner/Agent: Designer/Contractor: Rexbug, ID Brigham Young University - Idaho FFKR Architects Rexburg, ID 730 Pacific Avenue 4902 0.0 Sall Lake City, UT 84104 0.057 801-521-6186 Section 2: General Information Building Location (for weather data): Rexburg, Idaho Climate Zone: 6b Door 1: Uninsulaled Double -Layer Metal, Swinging Heating Degree Days (base 65 degrees F): 8693 --- Cooling Degree Days (base 50 degrees F): 1446 0.700 Activity Type(s) Floor Area 112 -- Warehouse 5831 1.098 Section 3: Requirements Checklist 7-Mve�''f Climate -Specific Requirements: Component Name/Description Gross Area Cavity Cont. Proposed Budget or Perimeter R -Value R -Value U -Factor U -Factor Roof 1: Insulation Entirely Above Deck 5831 -- 30.0 0.032 0.048 Exterior Wall 1: Concrete Block:8", Solid Grouted,Medium Density, 4902 0.0 15.0 0.057 0.083 Furring: Metal Door 1: Uninsulaled Double -Layer Metal, Swinging 63 -- --- 1.098 0.700 Door 2: Unlnsulated Double -Layer Metal, Non -Swinging 112 -- -- 1.098 0.500 Floor 1: Slab-On-Grade:Unheated, Vertical ft. 265 --- 10.0 --- -- (a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements. Air Leakage, Component Certification, and Vapor Retarder Requirements: 1. All joints and penetrations are caulked, gasketed or covered with a moisture vapor -permeable wrapping material Installed in accordance with the manufacturer's installation instructions. 2. Windows, doors, and skylights certified as meeting leakage requirements. 3. Component R -values & U -factors labeled as certified. fa,4. Insulation installed according to manufacturer's Instructions, in substantial contact with the surface being insulated, and In a manner that achieves the rated R -value without compressing the Insulation. 5. No roof insulation is installed on a suspended ceiling with removable ceiling panels. Stair, elevator shaft vents, and other outdoor air intake and exhaust openings in the building envelope are equipped with motorized dampers. ❑ 7. Cargo doors and loading dock doors are weather sealed./� Project Title: BYU-I Chiller Buiding Expansion Report date: 01/15/08 Data filename: J:14465 - BYU-1 Central CHW PlanAChiller Bldg.cck Page 1 of 4 0'6. Recessed lighting fixtures are: (1) Type IC rated and sealed or gasketed: or (II) Installed inside an appropriate airtight assembly with a 0.5 inch clearance from combustible materials and with 3 inches clearance from Insulation material. O 9. Building entrance doors have a vestibule and equipped with closing devicesC Exceptions: Building entrances with revolving doors. Doors that open directly from a space less than 3000 sq. ft. In area. 10. Vapor retarder Installed. Section 4: Compliance Statement Compliance Statement: The proposed envelope design represented In this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed envelope system has been designed to meet the 2006 ECC requirements in COMcheck Version 3.5.2 and to comply with the mandatory requirements in the Requirements Checklist. Name - Title Si nature Date Project Title: BYU-1 Chiller Building Expansion Report date: 01/15/06 Data filename: J:\4465 - BYU-1 Central CHW Plant\Chiller Bldg.cck Page 2 of 4 �(lCOMcheck Software Version 3.5.2 Mechanical Compliance Certificate 2006 IECC Report Date: 01/15/08 Data filename: J:\4465 - BYU-1 Central CHW Plant\Chiller Bldg.cck Section 1: Project Information Project Type: Addition Project Title : BYU-I Chiller Buiding Expansion Construction Site: Owner/Agent: Designer/Contractor: Rexbug, ID Brigham Young University - Idaho FFKR Architects Rexburg, ID 730 Pacific Avenue Salt Lake City, UT 84104 801-521-6186 Section 2: General Information Building Location (for weather data): Rexburg, Idaho Climate Zone: 6b Heating Degree Days (base 65 degrees F): 8693 Cooling Degree Days (base 50 degrees F): 1446 Section 3: Mechanical Systems List Quantity System Type & Description 1 HVAC System 1: Heating: Hydronic or Steam Coil, Steam / Single Zone 2 HVAC System 2: Heating: Unit Heater, Steam 2 Plant 1: Cooling: Water Chiller, Capacity >=300 tons, Condenser Water -Cooled, Rotary Screw or Scroll Chiller, with Propeller or Axial Fan Cooling Tower 1 Plant 2: Cooling: Water Chiller, Capacity >=300 tons, Condenser Air -Cooled, Rotary Screw or Scroll Chiller Section 4: Requirements Checklist Requirements Specific To: HVAC System 1 None Requirements Specific To: HVAC System 2 None Requirements Specific To: Plant 1 : Lj 1. Equipment minimum efficiency: Chiller: COP >= 5.50, IPLV >= 5.60 2. Closed-circuit cooling tower has: a) automatic bypass valve for condenser water loop or b) dampers that shut-off air Flow through the cooling tower Lj 3. Open -circuit cooling tower has automatic bypass valve for condenser water loop Lj 4. Open -circuit cooling tower with heat exchanger must have automatic shut-off controls for cooling tower Lj 5. Cooling tower performance >38.2 gpm/hp F -i 6. Air cooled condenser and cooling tower fan motors > 7.5 HP equipped with multiple -speed motors or single speed motors and variable speed drives Requirements Specific To: Plant 2 : FI 1. Equipment minimum efficiency: Chiller: COP >= 2.80, IPLV >= 2.80 Generic Requirements: Must be met by all systems to which the requirement is applicable: Project Title: BYU-I Chiller Buiding Expansion Report date: 01/15/08 Data filename: J:\4465 - BYU-I Central CHW Plant\Chiller Bldg.cck Page 3 of 4 O 1. Load calculations per 2001 ASHRAE Fundamentals ❑ 2. Plant equipment and system capacity no greater than needed to meet loads Exception: Standby equipment automatically off when primary system is operating Exception: Multiple units controlled to sequence operation as a function of load O 3. Minimum one temperature control device per system Li 4. Minimum one humidity control device per installed humidification/dehumidification system n 5. Automatic Controls: Setback to 55 degrees F (heat) and 85 degrees F (cool); 7 -day clock, 2 -hour occupant override, 10 -hour backup Exception: Continuously operating zones Exception: 2 kW demand or less, submit calculations 6. Outside -air source for ventilation; system capable of reducing OSA to required minimum 7. R-5 supply and return air duct insulation in unconditioned spaces R -B supply and return air duct insulation outside the building R-8 insulation between ducts and the building exterior when ducts are part of a building assembly Exception: Ducts located within equipment Exception: Ducts with interior and exterior temperature difference not exceeding 15 degrees F. - Exception: Continuously welded and locking -type longitudinal joints and seams on ducts operating at static pressures less than 2 inches w.g. pressure classification FI 8. Mechanical fasteners and sealants used to connect ducts and air distribution equipment ci g. Ducts sealed - longitudinal seams on rigid ducts; transverse seams on all ducts; UL 181A or 1818 tapes and mastics ❑ 10.Hot water pipe insulation: 1 in. for pipes <=1.5 in. and 2 in. for pipes >1.5 in. Chilled water/refrigeranYbrine pipe insulation: 1 in. for pipes <=1.5 in. and 1.5 in, for pipes >1.5 in. Steam pipe insulation: 1.5 in. for pipes <=1.51n. and 3 in. for pipes >1.5 in. - Exception: Piping within HVAC equipment - Exception: Fluid temperatures between 55 and 105 degrees F - Exception: Fluid not heated or cooled - Exception: Runouts <4 it in length 11.Operalion and maintenance manual provided to building owner ❑ 12.Balancing devices provided in accordance with IMC 603.15 13.Chilled water distribution systems >=300 kBtulh must have one of the following: a) controls that reset supply water temperature by 25% of supply/return delta T b) mechanical or electrical adjustable -speed pump drive(s) c) two-way valves at all heating coils d) multiple -stage pumps e) other system controls that reduce pump Sow by at least 50°l based on load - calculations required Q 14. Motorized, automatic shutoff dampers required on exhaust and outdoor air supply openings Exception: Gravity dampers acceptable in buildings <3 stories Exception: Gravity dampers acceptable in systems with outside or exhaust air flow rates less than 300 cfm where dampers are interlocked with fan ci 15.SIair and elevator shaft vents are equipped with motorized dampers Section 5: Compliance Statement Compliance Statement The proposed mechanical design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2006 IECC requirements in COMcbeck Version 3.5.2 and to comply with the mandatory requirements in tt1h Requirements Checklist. GIEWi4 Luttf satx Pttal., 61'.7&&, �L&++-- , Name - Title Signature Dat Project Title: BYU-1 Chiller Buiding Expansion Report date: 01/11/08 Data filename: Ja4465 - BYU-1 Central CHW PlantlChiller Bldg.cck Page 4 of 4 CoUcheck Software y U j O8 00040 E Ch111et, �]d r EnveIo6vpe Cornp�►anc b Addition le 2006(ECC ' Vertptwil Report pate: 01/15/08 Data filename: J:14465- 6YU-I Central CHW PlanllChiller eltl9 cck Section 9; Project Information OrrnatlOn Type: Additi Project Title ; on BYU-1 Chiller Buiding Expansion Construction Site: Rexbug. 10 - Owner/Agent: ShOarn Re burg, ID University- Idaho Deslgner/Co FFKR Archlt c'ra°tOC Section 2- G 730Pacfryc eneTall salt Lake Avenue BuildingnfOrtpatiOn 801-521-6188 UT841 elimat Zonatfon(forweather data): 521-6186 04 C0O �9 De agree Days (base 65rees 6b It Idaho t vl saes UeYs (base SO degrees F)): 14693 46 Warehouse Section 3.- ' r R"E"reme5831 nts Checklist Climate-Specific Requirements ComPonent Name/0 - Roof is Ins ascription Exterior IJI,II nEnlirel - Wa111:Co YAbove Deck Gro Mn ; ncrete Bl ss Area Cavity Fu 9 Metl °ck:8" or Perim Solid Grouted, eter R-value Cont. Door - Unfnsulafed Double- Medtum De 5831 R'�alue Proposed Door 2: Unlnsulatetl Double-Layer Metal Dan U-Factor Budget Swi 4902 30.0 U-Factor Floor t: Slab-On- Layer Metal, N0 win 0.0 0.032 Gratle: Unheated, -Swinging 15.0 0.057 °-p� (a) Budget U- �artIcal2 ff. 63 0.083 Factors are used for so fiw 112 --- Air Lea are baseline cal 205 1.098 0.700 1• Alljoints ga, Component C °"tailors ONLY, --- 10.0 1098 ertif/Ceti and are not code _ 0.500 with the Penetrations ar °n. an re - manu! a °aulkad, 9u'rarnents, -0'2 Wil acturer's lnsfallati- 8askeletl Vapor Retarder 3, ws, doors, ands installation °f covered with Requ/remen � Component R-vela lights certified ae s, a moistum vapor-penMents: -L�"'(• Insulitis Installed acco d ng tom labeled as cert fled, akaga requirements. wrapping material Installed In meetinwra schle 5 aced R-value wi manutcturer' -aNo roof insula' sinsfrucfio ce Insulation is installed on°ut °Ornpressing the 1 ns, m substantial co accordance �'� Stair, IS a sus Insulation. contact with the surface ❑ CarMpers. ft vents, and other outdoor a ceiling with emovable calling Panels. u ce being, and i 7.lnsulatetl 8o doom and 1 intake exhaust o n a Manner that Detling dock d Penin Dors are weather ////���� 9s in the building envelope a sesled� � Petaled Tfge: BYU re equipped with Data filena 1 Chiller Buidfn on motorized me: J:W485 - BYU•l Central �HW PlantlChiller Bldg.cck Report date: 01/15/08 Pape t 1. e�8. Recessed lighting fixtures are: (i) Type IC rated and sealed or gasketed; or (it) Installed inside an appropriate air -tight assembly with a r- 0.5 inch clearance from combustible materials and with 3 inches clearance �� n material. 9. Building entrance doors have a vestibule and equipped with closing device Exceptions: Building entrances with revolving doors. Doors that open directly from a space less than 3000 sq. ft. In area, jo.Vapor retarder installed. Section 4: Compliance Statement Compliance Statement: The proposed envelope design represented In this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed envelope system has been designed to meet the 20061ECC requirements in CCMcheck Version 3.5.2 and to comply with the mandatory Irements in the Requirements Checklist • �� b g SIM LAW C'�il1�c-l�f�L wV{Lata,. Name -Title Si nature Report date: 01/15108 Project Title: BYU-1 Chiller Buiding Expansion Page 2 of 4 Data filename: J:\4465 - BYU-1 Central CHW Plant\Chiller Bldg.cck e�j COMcheck Software Version 3.5.2 Mechanical Compliance Certificate 2006 IECC Report Date: 01/15/08 Data filename: J:14465 - SyU_I Central CHW PlanllChiller Bldg.cck Section 1: Project Information Project Type: Addition Project Title : BYU_I Chiller Buiding Expansion Construction Site: Rexbug, ID Owner/Agent: Brigham Young University - Idaho Designer/Contractor: Rexburg, ID FFKR Architects 730 Pacific Avenue Salt Lake City, UT 84104 Section 2: General807521-6186 Information Building Location (for weather data): Climate Zone: Rexburg, Heating Degree Das 6b g' Idaho Cooling Degree Days (base 50 degrees F)5 degrees : 8693 1446 Section 3: Mechanical Systems List QuAnt't-YsAOrn TYP_e 8 iption Descr 1 HVAC System 1: Heating: Hydronic or Steam Coil, Steam / Sil nge Zone 2 HVAC System 2: 2 Plant 1: Coolin Heating: Unit Heater, Steam With Propeller ro g: Water Chiller, Capacity >-300 tons 1 yeller or Axial Fan Cooling Tower .Condenser Water -C Plant 2: Cooling: Water Chiller, ooletl, Rota Capaci( x cr Screw or Scroll Chiller, Y 300 tons, Condenser Air -Cooled, Rotary Screw or Scroll Chiller Section 4: Requirements Checklist ReNon queirements Specific To: HVAC System 1 RNOq efrements Specific To: HVAC System 2 Requirements Specific To: Plant 1 ❑ 1 Equipment minimum efficiency: Chiller: COP >. 5.50, IPLV- ❑ 2. Closed-circuit coolin Coolingg tower has: a) automatic b - 5.60 tower ypass valve for condenser water loop or b) dam g tower has automatic b Pers that shut-off air flow throw ❑ 4. Opencircuit Coolingto bypass valve for condenser 9h the ❑ 5. Cooling low with heat exchanger must have water loop tower performance >38.2 gpm/hp automatic shut-off LJ 6. Air cooled condenser and coolin tower controls for cooling tower speed drives g wer fan motors > 7.5 HP equipped with multiple -speed motors or single speed motors and variable Requirements Specific To- Plant 2 : ❑ I Equipment minimum efficiency: Chiller: COP >= 2.80 Generic Requirements: IPLV >_ 2.80 Project 7rtle. ByU -I Must be met by all s ystems to which the requirement is applicable: Data Chiller Buiding Expansion filename: J:14465 - yU-1 Central CHW Pl`" """----- anllChiller Bltlg,cck Report date- nvu,�. ' 1. Load calculations per 2001 ASHRAE Fundamentals ❑ 2. Plant equipment and system capacity no greater than needed to meet loads Exception: Standby equipment automatically off when primary system is operating Exception: Multiple units controlled to sequence operation as a function of load Cj 3. Minimum one temperature control device per system � 4. Minimum one humidity control device per installed humidification/dehumidification system 5. Automatic Controls: Setback to 55 degrees F (heat) and 85 degrees F (cool); 7 -day clock, 2 -hour occupant override, 10 -hour backup - Exception: Continuously operating zones Exception: 2 kW demand or less, submit calculations 0 6. Out source for ventilation; system capable of reducing OSA to required minimum 07 R-5 supply and return air duct insulation in unconditioned spaces R-8 supply and return air duct insulation outside the building R-8 insulation between ducts and the building exterior when duds are pad of a building assembly Exception: Ducts located within equipment ees F. Exception: Duds with Interior and exterior temperature joints and seafferen0a, not ms 5on ducts operating at static pressures less than 2 Exception: Continuously welded and locking-typelongitudinal inches w.g. pressure classification C) S. Mechanical fasteners and sealants used to connect ducts and air distribution equipment rse seams on all ducts; UL 181A or 7818 tapes and mastics n g, Ducts sealed - longitudinal seams on rigid ducts; transve U 10.Hot e water 5Pn.Iand Lis in. or pipes '> 15 in. Steam pipe insullation:1 5 in.in. for pipes =illed 1.5 in. andr3 fo. for pipes pipe 155 inion: t in. for Exception: Piping within HVAC equipment - Exception: Fluid temperatures between 55 and 105 degrees F - Exception: Fluid not heated or cooled Exception: Runouts <4 it in length ❑ tt.Operation and maintenance manual provided to building owner F, 12.Balancing devices provided In accordance with IMC 603.15 ) I Ireturn delta mechanical or electrical adjustable -speed pump drive(s) c) two-way valves at if heating coils d) a Q 13.Chilled water distribution systems tee ms >=300 WWII must have one of the following- a controls that reset supply water temperature y 25% of Supp Y % based multiple -stage pumps e) other system controls that reduce pump Clow by at supply open openings on load -calculations require s 14.Motorized, automatic shutoff dampers required on exhaust and outdoor air supe Y P Exception: Gravity dampers acceptable in buildings <3 stories Exception: Gravity dampers acceptable in systems with outside or exhaust air flow rates less than 300 cfm where dampers are interlocked with fan Q 15.Slair and elevator shaft vents are equipped with motorized dampers Section 5: Compliance Statement lication. The proposed mechanical systems have been designed to meet the 2006 IECC Compliance Sratemont: The proposed mechanical design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit app sion 3.52 and to comply with the mandatory requirements in lh Requirements Checklist requirements in COMcheck Ver . _gyp Signature Dat Name - Title "Report date: 01111/08 Page 4 of 4 Project Title. BYU-1 Chiller Bmdmg Expansion Data filename: JA4465 - BYU-I Central CHW PIanAChiller Bldg.cck