HomeMy WebLinkAboutCOMCHECK - 08-00040 - BYU-I Auditorium - Chiller Building Addition�( COMcheck Software V1
Envelope Com
2006 IECC
0800040
M LSI Chiller Bldg Addition
Report Date: 01/15/08
Gross Area Cavity
Data filename: 44465-BYU-I Central CHW Plant\Chlller Bldg.cck
Proposed
Section 1: Project Information
Project Type: Addition
R -Value
Project Title : BYU-1 Chiller Buiding Expansion
U -Factor
Construction Site: Owner/Agent:
Designer/Contractor:
Rexbug, ID Brigham Young University - Idaho
FFKR Architects
Rexburg, ID
730 Pacific Avenue
4902 0.0
Sall Lake City, UT 84104
0.057
801-521-6186
Section 2: General Information
Building Location (for weather data): Rexburg, Idaho
Climate Zone: 6b
Door 1: Uninsulaled Double -Layer Metal, Swinging
Heating Degree Days (base 65 degrees F): 8693
---
Cooling Degree Days (base 50 degrees F): 1446
0.700
Activity Type(s) Floor Area
112 --
Warehouse 5831
1.098
Section 3: Requirements Checklist
7-Mve�''f
Climate -Specific Requirements:
Component Name/Description
Gross Area Cavity
Cont.
Proposed
Budget
or Perimeter R -Value
R -Value
U -Factor
U -Factor
Roof 1: Insulation Entirely Above Deck
5831 --
30.0
0.032
0.048
Exterior Wall 1: Concrete Block:8", Solid Grouted,Medium Density,
4902 0.0
15.0
0.057
0.083
Furring: Metal
Door 1: Uninsulaled Double -Layer Metal, Swinging
63 --
---
1.098
0.700
Door 2: Unlnsulated Double -Layer Metal, Non -Swinging
112 --
--
1.098
0.500
Floor 1: Slab-On-Grade:Unheated, Vertical ft.
265 ---
10.0
---
--
(a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements.
Air Leakage, Component Certification, and Vapor Retarder Requirements:
1. All joints and penetrations are caulked, gasketed or covered with a moisture vapor -permeable wrapping material Installed in accordance
with the manufacturer's installation instructions.
2. Windows, doors, and skylights certified as meeting leakage requirements.
3. Component R -values & U -factors labeled as certified.
fa,4. Insulation installed according to manufacturer's Instructions, in substantial contact with the surface being insulated, and In a manner that
achieves the rated R -value without compressing the Insulation.
5. No roof insulation is installed on a suspended ceiling with removable ceiling panels.
Stair, elevator shaft vents, and other outdoor air intake and exhaust openings in the building envelope are equipped with motorized
dampers.
❑ 7. Cargo doors and loading dock doors are weather sealed./�
Project Title: BYU-I Chiller Buiding Expansion Report date: 01/15/08
Data filename: J:14465 - BYU-1 Central CHW PlanAChiller Bldg.cck Page 1 of 4
0'6. Recessed lighting fixtures are: (1) Type IC rated and sealed or gasketed: or (II) Installed inside an appropriate airtight assembly with a
0.5 inch clearance from combustible materials and with 3 inches clearance from Insulation material.
O 9. Building entrance doors have a vestibule and equipped with closing devicesC
Exceptions:
Building entrances with revolving doors.
Doors that open directly from a space less than 3000 sq. ft. In area.
10. Vapor retarder Installed.
Section 4: Compliance Statement
Compliance Statement: The proposed envelope design represented In this document is consistent with the building plans, specifications
and other calculations submitted with this permit application. The proposed envelope system has been designed to meet the 2006 ECC
requirements in COMcheck Version 3.5.2 and to comply with the mandatory requirements in the Requirements Checklist.
Name - Title Si nature Date
Project Title: BYU-1 Chiller Building Expansion Report date: 01/15/06
Data filename: J:\4465 - BYU-1 Central CHW Plant\Chiller Bldg.cck Page 2 of 4
�(lCOMcheck Software Version 3.5.2
Mechanical Compliance Certificate
2006 IECC
Report Date: 01/15/08
Data filename: J:\4465 - BYU-1 Central CHW Plant\Chiller Bldg.cck
Section 1: Project Information
Project Type: Addition
Project Title : BYU-I Chiller Buiding Expansion
Construction Site: Owner/Agent: Designer/Contractor:
Rexbug, ID Brigham Young University - Idaho FFKR Architects
Rexburg, ID 730 Pacific Avenue
Salt Lake City, UT 84104
801-521-6186
Section 2: General Information
Building Location (for weather data): Rexburg, Idaho
Climate Zone: 6b
Heating Degree Days (base 65 degrees F): 8693
Cooling Degree Days (base 50 degrees F): 1446
Section 3: Mechanical Systems List
Quantity System Type & Description
1 HVAC System 1: Heating: Hydronic or Steam Coil, Steam / Single Zone
2 HVAC System 2: Heating: Unit Heater, Steam
2 Plant 1: Cooling: Water Chiller, Capacity >=300 tons, Condenser Water -Cooled, Rotary Screw or Scroll Chiller,
with Propeller or Axial Fan Cooling Tower
1 Plant 2: Cooling: Water Chiller, Capacity >=300 tons, Condenser Air -Cooled, Rotary Screw or Scroll Chiller
Section 4: Requirements Checklist
Requirements Specific To: HVAC System 1
None
Requirements Specific To: HVAC System 2
None
Requirements Specific To: Plant 1 :
Lj 1. Equipment minimum efficiency: Chiller: COP >= 5.50, IPLV >= 5.60
2. Closed-circuit cooling tower has: a) automatic bypass valve for condenser water loop or b) dampers that shut-off air Flow through the
cooling tower
Lj 3. Open -circuit cooling tower has automatic bypass valve for condenser water loop
Lj 4. Open -circuit cooling tower with heat exchanger must have automatic shut-off controls for cooling tower
Lj 5. Cooling tower performance >38.2 gpm/hp
F -i 6. Air cooled condenser and cooling tower fan motors > 7.5 HP equipped with multiple -speed motors or single speed motors and variable
speed drives
Requirements Specific To: Plant 2 :
FI 1. Equipment minimum efficiency: Chiller: COP >= 2.80, IPLV >= 2.80
Generic Requirements: Must be met by all systems to which the requirement is applicable:
Project Title: BYU-I Chiller Buiding Expansion Report date: 01/15/08
Data filename: J:\4465 - BYU-I Central CHW Plant\Chiller Bldg.cck Page 3 of 4
O 1. Load calculations per 2001 ASHRAE Fundamentals
❑ 2. Plant equipment and system capacity no greater than needed to meet loads
Exception: Standby equipment automatically off when primary system is operating
Exception: Multiple units controlled to sequence operation as a function of load
O 3. Minimum one temperature control device per system
Li 4. Minimum one humidity control device per installed humidification/dehumidification system
n 5. Automatic Controls: Setback to 55 degrees F (heat) and 85 degrees F (cool); 7 -day clock, 2 -hour occupant override, 10 -hour backup
Exception: Continuously operating zones
Exception: 2 kW demand or less, submit calculations
6. Outside -air source for ventilation; system capable of reducing OSA to required minimum
7. R-5 supply and return air duct insulation in unconditioned spaces R -B supply and return air duct insulation outside the building R-8
insulation between ducts and the building exterior when ducts are part of a building assembly
Exception: Ducts located within equipment
Exception: Ducts with interior and exterior temperature difference not exceeding 15 degrees F.
- Exception: Continuously welded and locking -type longitudinal joints and seams on ducts operating at static pressures less than 2
inches w.g. pressure classification
FI 8. Mechanical fasteners and sealants used to connect ducts and air distribution equipment
ci g. Ducts sealed - longitudinal seams on rigid ducts; transverse seams on all ducts; UL 181A or 1818 tapes and mastics
❑ 10.Hot water pipe insulation: 1 in. for pipes <=1.5 in. and 2 in. for pipes >1.5 in. Chilled water/refrigeranYbrine pipe insulation: 1 in. for
pipes <=1.5 in. and 1.5 in, for pipes >1.5 in. Steam pipe insulation: 1.5 in. for pipes <=1.51n. and 3 in. for pipes >1.5 in.
- Exception: Piping within HVAC equipment
- Exception: Fluid temperatures between 55 and 105 degrees F
- Exception: Fluid not heated or cooled
- Exception: Runouts <4 it in length
11.Operalion and maintenance manual provided to building owner
❑ 12.Balancing devices provided in accordance with IMC 603.15
13.Chilled water distribution systems >=300 kBtulh must have one of the following: a) controls that reset supply water temperature by
25% of supply/return delta T b) mechanical or electrical adjustable -speed pump drive(s) c) two-way valves at all heating coils d)
multiple -stage pumps e) other system controls that reduce pump Sow by at least 50°l based on load - calculations required
Q 14. Motorized, automatic shutoff dampers required on exhaust and outdoor air supply openings
Exception: Gravity dampers acceptable in buildings <3 stories
Exception: Gravity dampers acceptable in systems with outside or exhaust air flow rates less than 300 cfm where dampers are
interlocked with fan
ci 15.SIair and elevator shaft vents are equipped with motorized dampers
Section 5: Compliance Statement
Compliance Statement The proposed mechanical design represented in this document is consistent with the building plans, specifications
and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2006 IECC
requirements in COMcbeck Version 3.5.2 and to comply with the mandatory requirements in tt1h Requirements Checklist.
GIEWi4 Luttf satx Pttal., 61'.7&&, �L&++-- ,
Name - Title Signature Dat
Project Title: BYU-1 Chiller Buiding Expansion Report date: 01/11/08
Data filename: Ja4465 - BYU-1 Central CHW PlantlChiller Bldg.cck Page 4 of 4
CoUcheck Software y U j O8 00040
E Ch111et, �]d r
EnveIo6vpe Cornp�►anc b Addition
le
2006(ECC ' Vertptwil
Report pate: 01/15/08
Data filename: J:14465-
6YU-I Central CHW PlanllChiller eltl9 cck
Section 9; Project Information OrrnatlOn
Type: Additi
Project Title ; on
BYU-1 Chiller Buiding Expansion
Construction Site:
Rexbug. 10 -
Owner/Agent:
ShOarn
Re burg, ID University- Idaho Deslgner/Co
FFKR Archlt c'ra°tOC
Section 2- G 730Pacfryc
eneTall salt Lake Avenue
BuildingnfOrtpatiOn 801-521-6188 UT841
elimat Zonatfon(forweather data): 521-6186 04
C0O �9 De agree Days (base 65rees 6b It
Idaho
t vl saes UeYs (base SO degrees F)): 14693
46
Warehouse
Section 3.- ' r
R"E"reme5831
nts Checklist
Climate-Specific Requirements
ComPonent Name/0 -
Roof is Ins ascription
Exterior IJI,II nEnlirel -
Wa111:Co YAbove Deck Gro
Mn ; ncrete Bl ss Area Cavity
Fu 9 Metl °ck:8" or Perim
Solid Grouted, eter R-value Cont.
Door - Unfnsulafed Double- Medtum De 5831 R'�alue Proposed
Door 2: Unlnsulatetl Double-Layer Metal Dan
U-Factor Budget
Swi 4902 30.0 U-Factor
Floor t: Slab-On- Layer Metal, N0 win 0.0 0.032
Gratle: Unheated, -Swinging 15.0 0.057 °-p�
(a) Budget U- �artIcal2 ff. 63 0.083
Factors are used for so fiw 112 ---
Air Lea are baseline cal 205 1.098 0.700
1• Alljoints ga, Component C °"tailors ONLY, --- 10.0 1098
ertif/Ceti and are not code _ 0.500
with the Penetrations ar °n. an re -
manu! a °aulkad, 9u'rarnents,
-0'2 Wil acturer's lnsfallati- 8askeletl Vapor Retarder
3, ws, doors, ands installation
°f covered with Requ/remen
� Component R-vela lights certified ae s, a moistum vapor-penMents:
-L�"'(• Insulitis Installed acco d ng tom labeled as cert fled, akaga requirements. wrapping
material Installed In
meetinwra
schle
5 aced R-value wi manutcturer'
-aNo roof insula' sinsfrucfio ce
Insulation is installed on°ut °Ornpressing the 1 ns, m substantial co
accordance
�'� Stair, IS
a sus Insulation.
contact with the surface
❑ CarMpers. ft vents, and other outdoor a ceiling with emovable calling Panels. u ce being, and i
7.lnsulatetl
8o doom and 1 intake exhaust o n a Manner that
Detling dock d Penin
Dors are weather ////���� 9s in the building envelope a
sesled� �
Petaled Tfge: BYU re equipped with
Data filena 1 Chiller Buidfn on motorized
me: J:W485 - BYU•l Central �HW PlantlChiller Bldg.cck
Report date: 01/15/08
Pape t 1.
e�8. Recessed lighting fixtures are: (i) Type IC rated and sealed or gasketed; or (it) Installed inside an appropriate air -tight assembly with a
r- 0.5 inch clearance from combustible materials and with 3 inches clearance �� n material.
9. Building entrance doors have a vestibule and equipped with closing device
Exceptions:
Building entrances with revolving doors.
Doors that open directly from a space less than 3000 sq. ft. In area,
jo.Vapor retarder installed.
Section 4: Compliance Statement
Compliance Statement: The proposed envelope design represented In this document is consistent with the building plans, specifications
and other calculations submitted with this permit application. The proposed envelope system has been designed to meet the 20061ECC
requirements in CCMcheck Version 3.5.2 and to comply with the mandatory Irements in the Requirements Checklist • �� b g
SIM LAW C'�il1�c-l�f�L wV{Lata,.
Name -Title Si nature
Report date: 01/15108
Project Title: BYU-1 Chiller Buiding Expansion Page 2 of 4
Data filename: J:\4465 - BYU-1 Central CHW Plant\Chiller Bldg.cck
e�j COMcheck Software Version 3.5.2
Mechanical Compliance Certificate
2006 IECC
Report Date: 01/15/08
Data filename: J:14465 - SyU_I Central CHW PlanllChiller Bldg.cck
Section 1: Project Information
Project Type: Addition
Project Title : BYU_I Chiller Buiding Expansion
Construction Site:
Rexbug, ID Owner/Agent:
Brigham Young University - Idaho Designer/Contractor:
Rexburg, ID FFKR Architects
730 Pacific Avenue
Salt Lake City, UT 84104
Section 2: General807521-6186
Information
Building Location (for weather data):
Climate Zone: Rexburg,
Heating Degree Das 6b g' Idaho
Cooling Degree Days (base 50 degrees F)5 degrees : 8693
1446
Section 3: Mechanical Systems List
QuAnt't-YsAOrn TYP_e 8 iption
Descr
1 HVAC System 1: Heating: Hydronic or Steam Coil, Steam / Sil
nge Zone
2 HVAC System 2:
2 Plant 1: Coolin Heating: Unit Heater, Steam
With
Propeller
ro g: Water Chiller, Capacity >-300 tons
1 yeller or Axial Fan Cooling Tower .Condenser Water -C
Plant 2: Cooling: Water Chiller, ooletl, Rota
Capaci( x cr Screw or Scroll Chiller,
Y 300 tons, Condenser Air -Cooled, Rotary Screw or Scroll Chiller
Section 4: Requirements Checklist
ReNon
queirements Specific To: HVAC System 1
RNOq efrements Specific To: HVAC System 2
Requirements Specific To: Plant 1
❑ 1 Equipment minimum efficiency: Chiller: COP >. 5.50, IPLV-
❑ 2. Closed-circuit coolin
Coolingg tower has: a) automatic b - 5.60
tower ypass valve for condenser water loop or b) dam
g tower has automatic b Pers that shut-off air flow throw
❑ 4. Opencircuit
Coolingto bypass valve for condenser 9h the
❑ 5. Cooling low with heat exchanger must have water loop
tower performance >38.2 gpm/hp automatic shut-off
LJ 6. Air cooled condenser and
coolin tower
controls for cooling tower
speed drives g wer fan motors > 7.5 HP
equipped with multiple -speed motors or single speed motors and
variable
Requirements Specific To- Plant 2 :
❑ I Equipment minimum efficiency: Chiller: COP >= 2.80
Generic Requirements: IPLV >_ 2.80
Project 7rtle. ByU -I
Must be met by all s
ystems to which the requirement is applicable:
Data Chiller Buiding Expansion
filename: J:14465 - yU-1 Central CHW Pl`" """-----
anllChiller Bltlg,cck
Report date- nvu,�.
' 1. Load calculations per 2001 ASHRAE Fundamentals
❑ 2. Plant equipment and system capacity no greater than needed to meet loads
Exception: Standby equipment automatically off when primary system is operating
Exception: Multiple units controlled to sequence operation as a function of load
Cj 3. Minimum one temperature control device per system
� 4. Minimum one humidity control device per installed humidification/dehumidification system
5. Automatic Controls: Setback to 55 degrees F (heat) and 85 degrees F (cool); 7 -day clock, 2 -hour occupant override, 10 -hour backup
- Exception: Continuously operating zones
Exception: 2 kW demand or less, submit calculations
0 6. Out source for ventilation; system capable of reducing OSA to required minimum
07 R-5 supply and return air duct insulation in unconditioned spaces R-8 supply and return air duct insulation outside the building R-8
insulation between ducts and the building exterior when duds are pad of a building assembly
Exception: Ducts located within equipment
ees F.
Exception: Duds with Interior and exterior temperature joints and seafferen0a, not ms
5on ducts operating at static pressures less than 2
Exception: Continuously welded and locking-typelongitudinal
inches w.g. pressure classification
C) S. Mechanical fasteners and sealants used to connect ducts and air distribution equipment
rse seams on all ducts; UL 181A or 7818 tapes and mastics
n g, Ducts sealed - longitudinal seams on rigid ducts; transve
U 10.Hot e water 5Pn.Iand Lis in. or pipes '> 15 in. Steam pipe insullation:1 5 in.in.
for pipes =illed 1.5 in. andr3 fo. for pipes pipe
155 inion: t in. for
Exception: Piping within HVAC equipment
- Exception: Fluid temperatures between 55 and 105 degrees F
- Exception: Fluid not heated or cooled
Exception: Runouts <4 it in length
❑ tt.Operation and maintenance manual provided to building owner
F, 12.Balancing devices provided In accordance with IMC 603.15 )
I Ireturn delta mechanical or electrical adjustable -speed pump drive(s) c) two-way valves at if heating coils d)
a
Q 13.Chilled water distribution systems
tee ms >=300 WWII must have one of the following- a controls that reset supply water temperature y
25% of Supp Y
% based
multiple -stage pumps e) other system controls that reduce pump Clow by at supply
open openings on load -calculations require
s
14.Motorized, automatic shutoff dampers required on exhaust and outdoor air supe Y P
Exception: Gravity dampers acceptable in buildings <3 stories
Exception: Gravity dampers acceptable in systems with outside or exhaust air flow rates less than 300 cfm where dampers are
interlocked with fan
Q 15.Slair and elevator shaft vents are equipped with motorized dampers
Section 5: Compliance Statement
lication. The proposed mechanical systems have been designed to meet the 2006 IECC
Compliance Sratemont: The proposed mechanical design represented in this document is consistent with the building plans, specifications
and other calculations submitted with this permit app
sion 3.52 and to comply with the mandatory requirements in lh Requirements Checklist
requirements in COMcheck Ver .
_gyp
Signature Dat
Name - Title
"Report date: 01111/08
Page 4 of 4
Project Title. BYU-1 Chiller Bmdmg Expansion