Loading...
HomeMy WebLinkAboutBUILDING PLAN REVIEW - 08-00035 - Hibbard Church - MechanicalU8/t71/2t7Vr 14:11 IOU ("Ot I0 r(AM UI/11 6T INTERNATIONAL CODF COUNCIL International Code Council Chicago oi;t0a office 4051 W Rosamoor Road Cou ntry Club Hilly, JL 60478 tel: BBB.iccsafe (41.7233) fax! 708 799 4981 W~Iccsafe.arg Dear Mr. Morris: x,035 July 31, 2007 Mr, Clifford Morris Madison County, Idaho 134 East Main Rexburg, ID 83440 RE: PR #10607 - HIBBARD 2 WARD REXBURG IDAHO NORTH STAKE THE CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS Enclosed is the Building Plan Review of the construction documents for the above referenced project in accordance with your request. The enclosed comments and worksheets reflect the additional information and deficiencies that we have identified in our review of the documents you have submitted. We advise you to review the deficiencies cited coupled with the listed code sections to determine the necessary revisions to achieve code compliance. Revised construction documents are to be reviewed prior to permit issuance with approval resting with the building official. As is often the case, certain aspects of code compliance can involve interpretations and judgmental decisions. It is important that you review these comments and worksheets and contact us if you have any questions. This review is based upon and limited only to the information which has been provided. When additional information is submitted in response to the plan review comments, this Information can be resubmitted to ICC for review, without an additional fee, The drawings and materials that were submitted for this review will be returned upon completion of the requested Mechanical, Energy and Accessibility Plan Reviews, our Invoice in the amount of $3,859.00 for the Building Plan Review will follow shortly. If you have any questions concerning this review, we can be reached directly at 1 -888 -ICC - SAFE, Ext, 4311. It has been a pleasure to serve you, and we look forward to extending our services to you in the future. Very truly yours, Gary L. Nelson, P.E. Senior Staff Engineer utilul/Luu/ 14:11 (VU I7]u.51u rRum null July 31, 2007 rnternatlonal Code Council Plan Review#10607 Chicago District Office 4osi W Flossmoor Road Country Club Hills, It 60478 fel: 888A708.799,49 p:z.7z93) ICC PLAN REVIEW SERVICE lax: 70a.799�496r www.i"safe.org. ICC INTERNATIONAL BUILDING CODE/2003 JURISDICTION: MADISON COUNTY, ID BUILDING LOCATION: 1508 WEST 3000 NORTH, REXBURG, ID BUILDING DESCRIPTION: HIBBARD 2 WARD REXBURG IDAHO NORTH STAKE THE CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS NOTES AND COMMENTS* NOTE: These Plan Review comments reflect submitted construction document omissions br deficiencies that we have identified in our review. The construction documents shall be revised in accordance with the comments and the referenced code sections. Prior to approval of the been addressed. INFORMATIONAL NOTE: The materials submitted for this plan review project depict anew one-story, slab -on -grade building with mezzanine level intended for worship and other assembly uses. The submitted materials include the following: a. Nielson Bodily & Associates' Drawings G1.1 through G1.4, SD1.1, SD1.2, SD2.1, SD2.2, SD3.1 through SD3.5, ILIA through 1_1.6, A1.1 through A1.6, A2.1, A2.2, A3.1 through A3.7, A4.1 through A4.3, A5.1 through A5.4, A6.1 through A6,6, A7.1 through A7.3, F1.1, F2,1, F2.2, F3.1, F3.2, S1.0 through S1.4, S2.1 through S2,11, S3.1 through S3.3, FS1,1 through FS1.3, FS2.1, FS5.1, P1.1, P1.2, P4.1, P4.2, P5,1, M1.1, M1.2, M2.1, M5.1, M5.2, M6.1, ME1.1, ME1.2. ME2.1 through ME2.4, E1.0 through E1.3, E2.1, E2.2, E4.1, E4.2, T1.1, T1.2 and FD1.1 signed, sealed and dated by S. L. Nielson, Idaho Licensed Architect No. AR. 1116. 'Numerals indicated are applicable sections of the ICC International Building Code/2003. The Plan Review accomplished as indicated in the record is limited to those code sections specifically identified herein. Copyright, 2003, International Code Council, Inc. Reproduction by any means is prohibited. CJO/V11 LVV! lY.11 IVV(JJ VJIV INTERNATIONAL CODECOUNClr July 31, 2007 International Code Council Plan Review#10607 Chicago District Office 4051 W Flossmoor Road Page 2 Country Club Hills, IL 60478 tel: 888.icLsale (472.7138) faX: 708.7094881 www,iccsafe.org b. Nielson Bodily & Associates' Drawings G1.5 and S01.3 signed, sealed and dated by S. L. Nielson, Idaho Licensed Architect No. ARA 116. c. Project Manual by Nielson Bodily & Associates dated April, 2007. d. Addendum No. 2 dated May 9, 2007. e. Addendum No. 3 dated May 21, 2007. f. Structural Design Calculations by Engineering Structural Solutions, dated April 27, 2007 and signed, sealed and dated by T. Bateman, Idaho Registered Professional Engineer No. 9512. Geotechnical Engineering Report by Materials Testing & Inspection, dated August 24, 2006 and signed, sealed and dated by K. L. Schroeder, Idaho Registered Professional Geologist No. 964. The project manual and addendums must be signed, sealed and dated by the registered design Professional responsible for the work. Confirmation that the construction documents have been prepared by a registered design professional who is recognized by the professional registration laws of the State of Idaho is required. The main floor of this building is arranged as a Chapel with its fixed pews and Rostrum platform where the main worship and religious services are held. Accordion folding partitions separate the end of the Chapel from the Overflow area and from the Cultural Center. The Cultural Center can also be subdivided with accordion folding partitions. This space will be used for indoor sporting activities and other general assembly functions. At the far end of the Cultural Center is a stage Platform. The building also contains numerous large meeting rooms such as the High Council room, Rooms 113 through 115 with their integral Serving Area and Rooms 123, 134, 136, etc. All of these rooms, spaces and areas are classified as Assembly Group A-3. udlul/LDt77 14:11 tutfl,"U I0 July 31, 2007 International Code Council Plan Review#10607 Chicago District Office cos w Flossmoor Road Page 3 Country Club Hills, IL 6047e let: Naa.-cc xafe (4" 7133) fair: 708.799.4921 w .iccsafe.wg PA(mL 04111 It appears that Rooms 141, 142 and possibly 140 will be used as "cry rooms" or as a child care facility, but only during the worship and religious services. If so, these rooms are considered as part of the main use and occupancy. If these rooms provide child day care services outside of the normal church activities, then they must be classified as Institutional Group 1-4. Further design information must be submitted for these rooms to determine the applicable code requirements. This building also contains various labeled and unlabeled partitioned offices, clerical rooms, work rooms, etc. that will be used to conduct the business and administrative functions of the church. These rooms and spaces are classified as Business Group B. The nonseparated uses option will be used to evaluate the mixed use groups and occupancies (A-3 and B) present in this building. Based on a full street frontage area modification increase and the automatic NFPA 13 fire sprinkler system building area increase, the Type VB construction specked on the drawings provides the necessary height and area allowances for this building. Please see Comment No. 2 relative to the mechanical access mezzanine. The 70' high noncombustible steeple does not add to the building's height in terms of "feet". The building contains various rooms labeled as Storage, Custodian, Fire Riser, Electrical and W Material Center along with the spaces under the stage Platform and the mechanical access uy mezzanine. These rooms and spaces must be considered as incidental use areas and mustv�( be provided with the separation and protection specified by Table 302.1.1 and Section 302.1.1.1. The drawings indicate that a small one-story, enclosed, wood -framed storage building / pump house and a small roofed -over, woad -framed picnic shelter will be remotely located across the parking lot from the church. (106.1, 106.1.1, 106.2, 302.1, 302.1,1, Table 302.1.1, 302.1.1.1, 302.3, 302.3.1, 303.1, 304.1, 305.1, 308.5, 502.1, 503.1, Table 503, 504.3, 505.1, 505,2, 506.1, 506.2, 506.3, Table 601, 602.1, 602.5, 1509.5) 2. Drawing A1.2 indicates an extensive mechanical access mezzanine that runs along the three sides of the Chapel / Overflow / Cultural Center rooms and directly corresponds to the exit access corridor layout on the main floor. The mezzanine floor consists of 3/4" thick wood structural panels and is approximately 4,186 square feet in area. This mezzanine greatly exceeds the code's area limitation of 1/3 of the "room" containing the mezzanine, which is the combined Chapel / Overflow / Cultural Center. The building official must evaluate and determine whether this mezzanine is the second story of the building or whether further area restrictions are required. (505.1, 505.2) U131 UIfAMt 1q:11 Intl t"U'l111 PAGE 05/11 INTERNATIONAL cooccouNar July 31, 2007 International Code Council Plan Review#10607 Chicago District Office Page4 4a61 W Flossmoor Road Country Club Hills, IL 60478 tel: 888.1cc.safe (g22.7233) fate 708.700A98t www.iccmft.org The mezzanine is served by only one unenclosed interior stairway that is accessed via Room 119. As a space with just one means of egress, the travel distance (including the catwalk system located above the mezzanine) greatly exceeds the code's common path of travel limitation. Another remotely located means of egress stairway must be added that provides two distinct paths from all parts of the mezzanine. Since the mezzanine is not open to the "room" below, one of the means of egress must be an enclosed interior exit stairway in accordance with Exception No. 2 of Section 505.4. Revised drawings are required. (505.3, 505.4, 1013.3) The stage Platform located at the far end of the Cultural Center is shown with hanging curtains that can be drawn, a proscenium -style face and concealed backstage areas. This stage Platform must comply with the applicable stage provisions of Section 410. Full details must be submitted to verify code compliance. (410) 4. The sports wood floor system shown in the Cultural Center appears to have concealed sleeper spaces. However, fireblocking is IMot required in accordance with Exception No. 1 of Section 717,2.7. Typically, the code requires draftstopping in the enclosed attics and roof spaces of buildings of combustible construction. Since this building is equipped throughout with an automatic NFPA 13 fire sprinkler system, including the mezzanine and attic areas, draftstopping is not required. (717.1, 717.2, 717.2.7, 717.4, 717.4.3, 903.3.1.1) 5, The flame spread and smoke -developed index ratings forthe proposed thermal- and sound - insulating materials shown as batt insulation must be included on the drawings or in the material specifications. (719.1, 719.2, 719.3) Although Drawing A5.1, the F series of drawings and the material specifications contain the appropriate details and requirements for the interior finish and trim within this structure, the building official must verify code compliance of each individual finish, including the accordion folding partitions. All curtains, draperies, hangings or other decorative materials must be flame -resistant in accordance with referenced standard NFPA 701 and must be limited to 10% of the aggregate area of the walls and ceilings. (803.1, 803.2, 803.3, 803.4, Table 803.5, 804.1, 805.1, 805.1.2) out tilt ZULII 14:11 /IiC/77gO10 rau¢ uol♦1 INTERNATIONAL CODECOUNCir July 31, 2007 International code Council plan Review#10607 - Chicago olstlictOffice Page 5 405+ H' FlQeWMr Road g Country Club Hills, IL 6047A to i! 88BAcc.safe (4».7233) fAX! 708.799.49At www.lccsale.nrg Although the FS series of drawings and material specifications have been submitted, full working drawings and design calculations must be submitted for the automatic NFPA 13 fire sprinkler system required in this building. The drawings and calculations must include information on the sprinkler spacing and arrangement, water supply and discharge requirements, size and equivalent lengths of pipes and fittings, water supply source, fire tank and pump. Quick -response sprinkler heads are required as part of this system based on the light -hazard occupancies present. Once construction documents are completed, a review of the fire sprinkler system for compliance with the applicable standard can be performed as part of ICC's comprehensive Sprinkler Plan Review Service. (106.1.1.1, 302.1.1, Table 302.1.1, 506.3, 901.2, 901.6.1, 903.2, 903.2.1, 903.2.1.3, 903.3.1.1, 903.3.2, 903.3.5, 903.4) 8. A commercial kitchen exhaust hood system may be required for the cooking appliances located in the Serving Area. See the ICC International Mechanical Code/2003 for further requirements. Design details and materials must be submitted for any dry -chemical or wet - chemical range hood extinguishing systems required for Type 1 commercial kitchen exhaust hood systems. (901.2, 904.2.1, 904.3, 904.11) 9. Since this building contains Group A-3 and B occupancies, NFPA 10 portable fire extinguishers are required. The building official must approve the label, type and location of the extinguishers. Although not required for plan review or permit application purposes, portable fire extinguishers are also required for the building during its construction phase. (906.1, Section 906 of the ICC International Fire Code/2003) 10. A manual fire alarm system is required and is provided in this building, The building official is required by the code to approve all of the proposed devices, appliances and equipment of the fire alarm system. The locations of all manual fire alarm boxes, detectors and alarms are shown on Drawing F131.1. Visible alarm notification appliances are required in the public and common areas of the building. Evidence must be submitted to ICC indicating that the proposed audible alarm notification appliances have a sound pressure level of 15 CIBAabove the average ambient sound level within the building. The minimum sound pressure level is 60 dBA. An approved supervisory station must be provided to monitor the fire alarm system. (901.2, 901.6.2, 907.1, 907.1.1, 907.1.2, 907.2, 907.2.1, 907.2.1.1, 907.2.1.2, 907.2.2, 907.3, 907.4, 907.5, 907.6, 907.8, 907.9, 907.9.1, 907.9.1.1, 907.9.2, 907.14) 08/01/2007 14:11 7087990310 PAGE 07/11 Intemational Code Council Chicago Disukt Office 4oS? W Ftossmnor Road Country Cluh Hills, IL 604'/8 W: NPP !cc. safe 1413.7]33 fa3' 70a.799.401 www.ic(Safe.org July 31, 2007 Plan Review #10607 Page 6 11. Those rooms and spaces simply labeled as "Room" on Drawing A1.1 must be clearly identified as to their anticipated use and occupancy to verify compliance with the code's means of egress requirements. (106.1.2, 1004.1, 1004.3, 1005.1) 12. The non -carpeted walking surfaces of the means of egress, including the floors of corridors and the treads and landing of the stairway, must be of slip -resistant materials. (1003.4, 1009.5.1) 13. The building official must approve for all "Exit" signs their location and placement, size and color, Illumination and power source as well as the intensity of illumination and power source for all artificial means of egress lighting, "Exit" signs must be located such that the building occupants are not more than 100' from the nearest visible sign in exit access corridors. (1006, 1011) 14. Doors 302A, 303A and 304A must each have a clear width of at least 32" since each storage room they serve is 10 square feet or greater in area. Revised drawings are required. The means of egress doors within the building must be readily openable from the egress side without the use of a key or special knowledge or effort. Details of all door hardware (including opening forces, mounting heights, locks and latches) must be shown on the drawings to verify code compliance. Any electronic locking of the means of egress doors must be in accordance with the code's provisions for access -controlled doors or for delayed egress locks. Pages 2, 4 and 5 of Specifications Section 080601 refer to both dead bolts and flush bolts for Group 1, 50 and 50A hardware sets. Specifications Section 087103 also refers to both dead bolts and flush bolts as does Addendum No, 3 for a Group 10 hardware set. Manually operated edge- or surface -mounted bolts are only permitted on the inactive leafs of pairs of doors serving storage or equipment rooms. The main interior egress doors from the Chapel / Overflow / Cultural Center areas and the main exterior egress doors from the building must be equipped with approved panic and fire exit hardware. Details of the panic and fire exit hardware must be submitted along with opening force requirements to verify code compliance. Revised drawings are required. (1008.1.1, 1008.1.3.4, 1008.1.8, 1008.1.8.1, 1008.1.8.2, 1008.1.8.4, 1008.1.8.6, 1008.1.9) UU/01t ZUUr 14:14 ruoI valU r,-ia� owu INTERNATIONAL CODE COOK IL' International Code Council Chicago District Office 4031 W FI03:moor Rnu1 Cucntry Club Hills, It 60478 tnl: age.icc.;afe, (42x7233) lax: 709.799.4983 w WACesafe.org July 31, 2007 Plan Review #10607 Page 7 15. Detail Pon Drawing A7.2 indicates 7-3/4" high risers for the mechanical access steps versus the code specified maximum of 7". Revised drawings are required. (1009.3) 16. Sections F and Ron Drawing F2.2 indicate non -circular cross sections for the handrails for the ramp. The handrails must be revised to conform with the non -circular perimeter limits specified in the code. (1009.11.3. 1010.1, 1010.8) 17. Detail P on Drawing A7.1 indicates a 36" height for the "attic railing". Guards along open - sided walking surfaces are required to be 42" high. The railing at the front edge of the Rostrum platform is also not 42" high. The building official must review and evaluate the appropriate height for this specific guard. This guard must be of adequate strength and attachment as required by Section 1607.7. (1012.1, 1012.2, 1607.7) 18. Accessibility for persons with physical disabilities to all spaces of this building is required. Accessibility is not required for individual employee work areas or equipment spaces (such as the mechanical access mezzanine) frequented only by authorized personnel. Accessible routes must be provided to all spaces of this building, including the stage Platform and the front of the baptismal Font. At least 50% of the entrances to this building must be accessible. At least one entrance serving each public access point must be accessible. Signage must be posted at each non -accessible entrance indicating the location of the accessible entrances. Drawing SD1.1 indicates a sufficient number of accessible parking spaces based on the total number of spaces shown in the parking lot. Verify that the accessible parking space complies with the size requirements of referenced standard ICC A117.1. (1101.2,1103,1, 11 D3.2.3,1103.2.9,1104.3,1104.4,1105.1,1106.1, Table 1106.1, 1110) Based on the design occupant load of 235 for the Fixed pews in the Chapel, at least 5 accessible wheelchair spaces are required versus the 4 currently shown. It appears that an accessible seat can be provided directly adjacent to the raised tiered seating areas of the Rostrum platform. It also appears that an accessible dining space can be provided in Rooms 113 through 115 with their integral Serving Area. Assistive listening systems have been indicated as being provided. r7tl�G1/LGG/ 14.11 lntemational Code Council Chlcago District office 40n w rlessmoor (toad Country Club Hills, IL 60476 tel: 888.1cr..safe (422.7233) far: 706.799,498s www.iccskft.org IVGI I]V.J V July 31, 2007 Plan Review #10607 Page 8 Each of the three toilet rooms labeled Women and each of the two toilet rooms labeled Men must have at least one of each type of fixture or element accessible. In addition, two single occupant Rest Rooms are indicated. One of these must be labeled as the required accessible unisex toilet room while the other must also have at least one of each type of fixture or element accessible since it does not serve a single private office. Verify that the required accessible fixtures in the toilet rooms comply with the size requirements of referenced standard ICC Al 17, 1. Verify that 50% of the required drinking fountains are accessible. Although not part of this plan review project, this building and its elements must comply with referenced standard ICC A117.1 and all other federal, state and local requirements. Seethe I CC Accessibility Plan Review for further comments. (110 1, 2, 1108.2. 1108.2.2, Table 1108.2.2.1, 1108.2.4, 1108.2.7, 1108.2.9.1, 1109.2, 1109.2.1, 1109.3, 1109.5, 1109.13, 1110) 19. The drawings Indicate that the unconditioned attic spaces will be provided with ridge vents. These spaces must have adequate cross ventilation. The net free ventilating area provided by all soffit and ridge vents must be shown on the drawings along with the minimum required ventilating area. Revised drawings are required. (1203.2) 20. The Design Criteria listed on Drawing 51,0 refers to the ICC International Building Code/2006 versus the code of record, the ICC International Building Code/2003. The design loads and other pertinent information concerning the structural design of this building have been clearly indicated on the construction documents for all of its components as required by the code. There appears to be a discrepancy between the mapped spectral seismic accelerations and the calculated design spectral response accelerations shown on Drawing S1.0 versus those shown on Page 2 of the submitted structural design calculations. The drawings and calculations must be reconciled. Detailed structural drawings and structural design calculations have been provided. However, calculations have not been included for the small one-story, enclosed, wood -framed storage building / pump house and for the small roofed -over, wood -framed picnic shelter remotely located across the parking lot from the church. As you know, this information is essential and must be provided for review prior to approval of the project. (106.1, 106.1.1, 1601.1, 1603.1, 1604.1, 1615.1, 1615.1.3) 08/01/2007 14:11 7087990310 PAGE 10/11 sw\MMI MUM\ INTERNATIONAL CODE COUNCIL" International Code Council Chicago Dintrio Officc 41p W rlossmaor Road Country Club Hills, IL G6478 tel! 888.Irr,.xafe (422.71,33) fax: 708 799.4981 VWmiccsafe.org July 31, 2007 Plan Review #10607 Page 9 21. The proposed work depicted on the drawings is subject to the code's special inspection provisions. Although Drawing S1.0 contains general notes, a statement must be submitted with the permit application including a complete list of the materials and work requiring special inspections, the inspections to be performed and a list of the individuals, approved agencies and/or firms intended to conduct the inspections. (1704.1, 1704.1.1, 1704.2, 1704.4, 1704.5, 1704.6, 1704.7, 1705, 1707, 1708, 1709) 22. Page 1 of Specifications Section 032100 lists the 1983 version of referenced standard ACI 318 for the proposed plain and reinforced concrete materials versus the 2002 edition that is specified in the code. The design/construction standard referenced in the code for the proposed masonry materials must be specified on the drawings or in the material specifications. The specific cold -weather and hot -weather curing protection methods for the proposed concrete and masonry materials must be specified on the drawings. General Note #7 on Drawing A1.1 and Detail H on Drawing A7.1 indicate that a vapor retarder will only be placed under the sports wood floor system in the Cultural Center. A vapor retarder is required between all of the concrete floor slabs -on -grade and the base courses or subgrades. A complete description and thickness of the materials intended to serve as the required vapor retarder and the applicable installation details must be submitted to verify code compliance. Revised drawings are required. (1901.2,1908,1911.1,1905.12,1905.13, 2101.2, 2104.3, 2104.4, Chapter 35) 23. Drawing S1.0 indicates the possible use of prefabricated wood i -joists. The building official must verify that the structural capacities and design provisions for the prefabricated wood 1 -joists were established and monitored in accordance with referenced standard ASTM D5055. Details must be included for any lateral restraint or bridging required for the wood 1 -joists. (2303.1.2) 24. The prefabricated metal -plate -connected wood roof trusses indicated on the drawings must be designed in accordance with referenced standard TPI 1. Shop drawings and structural design calculations must be submitted and include all of the information required by the code. The minimum roof snow load must be 45 psf with a 20 psf bottom chord live load for the roof trusses. The shop drawings and structural design calculations must be signed, sealed and dated by the registered design professional responsible for the work. Details must be included for any required bracing and roof tie -downs based on the applicable wind uplift pressures. (23034, 2303.4.1) 08/01/2007 14:11 /88 /y80j18 fNbt 11/11 INIERNATIONAI CODE COUNCIL" International Code Council Ch1wo District Office 4051w Flossmoor Road Country Club Hi11s, IL 60478 tel! 888.1ec.safe (42z.7233) la%: 709 79.9 4981 Ww .. iccsafc.ors July 31, 2007 Plan Review #10607 Page 10 25. Although the referenced standard is noted in Specifications Section 088100, all glazing in the doors, in the sidelites and in all other specific hazardous locations must be of safety glazing quality and must pass the test requirements of referenced standard CPSC 16 CFR 1201. Evidence of the same must be submitted to the building official. (2406.1.1, 2406.2, 2406.3) 26. The foam plastics Intended for use as foundation insulation must meet the code's surface- a burning characteristic limits and must be labeled. Evidence of the same must be submitted to the building official. The foam plastics must either be prescriptively installed in accordance with the code's requirements or documented by special approval. (2603.2, 2603.3, 2603.4, 2603.8)