Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 4 - 20-00700 - Kodiak LLC - Gorilla PerformanceProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Neil Stoddard 20060 JRW & Associates Jacobsen Construction 9/14/2020 Clear 1:00 PM 68 3:00 PM I arrived on site and began my observations of the reinforcement of the perimeter footings. I observed that the contractor had placed the reinforcement in general conformance with the project documents. After speaking with the contractor, he notified me that the footings were dug 6" deeper than the plans called for. I observed that the reinforcement was the correct size and spacing and maintained the required clearance from the ground and forms. I observed the contractor wet set the vertical reinforcement in place. I notified the contractor of my observations and the test results prior to leaving. Digitally signed by Jacob P Christensen Date: 2020.09.20 14:04:55 -06'00'8129697 East Footings South Footings J. Christensen Page 2 of 2 Description: Description: Description: Description: Additional Comments: