HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 4 - 20-00700 - Kodiak LLC - Gorilla PerformanceProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Neil Stoddard
20060
JRW & Associates
Jacobsen Construction 9/14/2020
Clear
1:00 PM
68
3:00 PM
I arrived on site and began my observations of the reinforcement of the perimeter footings. I observed that
the contractor had placed the reinforcement in general conformance with the project documents. After
speaking with the contractor, he notified me that the footings were dug 6" deeper than the plans called for. I
observed that the reinforcement was the correct size and spacing and maintained the required clearance
from the ground and forms. I observed the contractor wet set the vertical reinforcement in place. I notified
the contractor of my observations and the test results prior to leaving.
Digitally signed by Jacob P Christensen
Date: 2020.09.20 14:04:55 -06'00'8129697
East Footings South Footings
J. Christensen
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments: