HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 3 - 20-00700 - Kodiak LLC - Gorilla PerformanceProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
Inspected By:
Neil Stoddard
20060
Jacobson Concrete 09/16/2020
Sunny
11:15 AM
86
12:45 PM
I arrived on site and began my observations. I observed that the re-bar and forums for the foundation walls
were all in order according to spec. When the first truck arrived I began my testing and the concrete passed
without any problems. The pour went smoothly and there were no difficulties what so ever. Throughout the
duration of the pour I observed that the contractors were within general conformance to the project
documents.
Digitally signed by Jacob Christensen
Date: 2020.09.21 10:18:48 -06'00'
Concrete Placement Concrete Placement Concrete Reinforcement
L. Steiner
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments:
Concrete Placement