HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 3 - 20-00700 - Kodiak LLC - Gorilla PerformanceProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: Inspected By: Neil Stoddard 20060 Jacobson Concrete 09/16/2020 Sunny 11:15 AM 86 12:45 PM I arrived on site and began my observations. I observed that the re-bar and forums for the foundation walls were all in order according to spec. When the first truck arrived I began my testing and the concrete passed without any problems. The pour went smoothly and there were no difficulties what so ever. Throughout the duration of the pour I observed that the contractors were within general conformance to the project documents. Digitally signed by Jacob Christensen Date: 2020.09.21 10:18:48 -06'00' Concrete Placement Concrete Placement Concrete Reinforcement L. Steiner Page 2 of 2 Description: Description: Description: Description: Additional Comments: Concrete Placement