Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 2 - 20-00700 - Kodiak LLC - Gorilla PerformanceProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: Inspected By: Neil Stoddard 20060 Jacobson Concrete 09/17/2020 Cool 9:00AM 62 10:30AM I arrived at the site and began my observations. I checked the re-bar and confirmed that it was up to spec then waited for the truck to arrive. Once the truck arrived I began my testing. The concrete passed without difficulty and I then observed that the contractor had stayed within general conformance to the project documents for the duration of the pour. Digitally signed by Jacob Christensen Date: 2020.09.21 10:13:42 -06'00' Concrete Reinforcement Concrete Reinforcement Concrete Placement L. Steiner Page 2 of 2 Description: Description: Description: Description: Additional Comments: