HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 2 - 20-00700 - Kodiak LLC - Gorilla PerformanceProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
Inspected By:
Neil Stoddard
20060
Jacobson Concrete
09/17/2020
Cool
9:00AM
62
10:30AM
I arrived at the site and began my observations. I checked the re-bar and confirmed that it was up to spec
then waited for the truck to arrive. Once the truck arrived I began my testing. The concrete passed without
difficulty and I then observed that the contractor had stayed within general conformance to the project
documents for the duration of the pour.
Digitally signed by Jacob Christensen
Date: 2020.09.21 10:13:42 -06'00'
Concrete Reinforcement Concrete Reinforcement Concrete Placement
L. Steiner
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments: