Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 1 - 20-00700 - Kodiak LLC - Gorilla PerformanceProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By:By: Neil Stoddard 20060 Jacobson Concrete 09/15/2020 Sunny 12:30 PM 85 2:15 PM I arrived at the site and began my inspections. I checked the re-bar and confirmed that everything looked correct according to spec, and then waited for the truck to arrive. the first truck showed up at about 1:40 PM and then I began my testing. The truck passed easily with no problem, and then I observed that throughout the duration of the pour, the contractor stayed withing general conformance to the project documents. Digitally signed by Jacob Christensen Date: 2020.09.21 10:22:40 -06'00' Concrete Placement Concrete Reinforcement Concrete Reinforcement L. Steiner Page 2 of 2 Description: Description: Description: Description: Additional Comments: