Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION - The Grove at Thomson Farms - East Parking LotProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Thompson Farms 20001 Stillwater Equity Partners Hill and Sons Excavation 09/14/2020 Clear 10:00 AM 55 12:00 PM I arrived on site and began my observations of the subgrade for the Eastern parking lot. I observed the contractor use a loaded water truck and proof roll the subgrade. I observed a couple of areas that were soft and yielding under the weight of the truck. These areas were marked with paint for the contractor to remove and replace. I notified the earthwork contractor as well as Headwaters superintendent Don Thorp of the areas that need to be reworked. Digitally signed by Jacob P Christensen Date: 2020.09.20 13:53:05 -06'00'8129697 J. Christensen Page 2 of 2 Description: Description: Description: Description: Additional Comments: