HomeMy WebLinkAboutPROJECT DETAILS - 08-00023 - Sunrise Dr - Founders Square PH1 Final PlatRENDEZVOUS ENGINEERING, P.D. Z_ Civil Engineers and Planners in Wyoming and Idaho Rendezvous Project No: 08-005 February 13, 2008 Mr. Gary Leikness Planning & Zoning Administrator 19 E. Main Street P.O. Box 280 Rexburg, ID 83440 Via email:,2 l ieresburg.org RE: hounders Square PUD Dear Mr. Leikness, As requested, we have provided for your review additional information regarding the landscaping of the Founders Square project. Please find enclosed for your information a set of design guidelines and specifications pertaining to the proposed landscaping. In addition, a bid sheet indicating quantities of each of the landscape design components, as well as drawings Ll through L4 have been included for your use. Please note that Sheets Ll and I.3 were provided to you in our previous submittal. These sheets have been subject to further revisions and as such, should replace the previously submitted material. All other material in this submission is new and should he considered as supporting information to the original submittal. If you require any additional information, please do not hesitate to contact me. Sincerely, Allison M. Fleury Registered Landscape Architect 25 South Gros Ventre Street - Post Office Box 4858 -Jackson, Wyoming 83007 Phone -307.733.5252 Fax -307.733.2334 COST ESTIMATE FORMS AND MINIMUM SPECIFICATIONS In order to assist the developer in acquiring contractor bids and assuring a minimum level of installation performance and aesthetic intent the following bid sheets and specifications are provided. Bid sheets and specifications for the project are arranged by phase and further subdivided into specific areas within each phase. Each of these areas has a spread sheet, installation specifications and design assumptions which describes the landscape components specific to that area. PHASE I PROJECT COMMON AREAS With the exception of irrigation points of connection and mainline piping for common areas, it is assumed that Phase I landscaping of these common areas will commence after the completion of project infrastructure, including water, sewer, wire and road improvements. Phase I landscaping includes the following: Sunrise Drive Planting, Entry Boulevard Median, Founders Park and all areas disturbed by infrastructure installation which will require an interim revegetation effort to prevent wind and water erosion of bare ground. Specifications for these areas are as follows. Specifications: 1. Revegetation of disturbed areas with a temporary cover crop: • An appropriate quick cover seed, any one of those listed or comparable. • Surface preparation: hard packed or caked soil shall be scarified or disked. • Broadcast seed to the specified rate and rake over to set seed. Quick Cover for Erosion Control of Disturbed Soils Use any one of the species listed below at the given Tate. Common Name Botanical Name Application Rate lbs PLS/acre Percent Mix.' Barley Hordeum vulgare 48 100 Mountain. brome Bromus marginatus 12 100 Mountain rye Secale montanus 50 100 Oats Avena stavia 35 too Perennial ryegrass Lolium perenne 6 100 Rye Secale cerelae 35 100 Slender wheatgrass Agropyron trachycaulum 7 100 Tall oatgrass Arrhenatherumelatius 6 100 Wheat-wheatgrass hybrid Agropyron X Triticum 60 100 2. Sunrise Drive Plantings: • Installation of drip irrigation per irrigation contractor's design to supply all indicated plants with adequate irrigation. • Install Siberian Pea Shrubs at 5'on centers. • Revegetate with the permanent dry native grass mix between property line and the back of curb on the north margin of the property. Grasses will require temporary irrigation for a minimum of one season to insure germination. Common Name Botanical Name Application Name change Rate botanical name Synonyms Bluebunch Wheatgrass lbs PLS/acre Percent Mix Bluebunch Wheatgrass Pseudoroegneria spicata 10 25.0% Canby bluegrass Poa secunda 1 2.5% Idaho fescue Festuca idahoensis 2 5.0% Slender wheatgrass Elymus trachycaulus 5 12.5% Thickspike wheatgrass Elymus tanceolatus spp. Dasystachyum 10 25.0% Western wheatgrass Agropyron smithii 12 30.0% Total Pure Live Seed Application Rate 40 lbs PLS/acre Additional Notes: Name change common name botanical name Synonyms Bluebunch Wheatgrass Pseudoroegneria spicata Agropyron spicatum Canby bluegrass Poe secunda Poe canbyi 'Canbar' Thickspike wheatgrass Elymus lanceolatus spp. Dasystachyum Agropyron dasystachyum Slender wheatgrass Elymus tracnycaulus Agropyron trachycaulum Entry Median Planting: • Installation of drip (for trees) and spray (for sod) irrigation per irrigation contractor's design. • Install 8 entry trees at 38' -7" on center the length of the median, beginning 30' from the northern end of the planter (Sunrise Drive end). • Prepare surface of the planter to receive sod with 6" of topsoil raked smooth. Apply sod to cover. 2 3. Founder's Square Park: • The area of the park will be covered to a depth of 6" with topsoil • Concrete pads for benches shall be 4" thick with 6" of V crush rock base. Two pads are located on each of the east, west and south sides of the park abutting the inner margin of the sidewalk and will be constructed to a size that permits 3' of free space on all sides of the benches for access. Example: a pad 12' long by 8'wide would accommodate a 6' by 2' bench. Bench type shall to be determined by the developer. • Another concrete pad of the same construction shall be constructed centered on the inside of the south sidewalk of the park as shown in the drawings. This pad shall be 10' x 24' in size and will accomodate the flagpole and memorial marker. • Benches, flagpole and park memorial shall be installed according to manufacturer's instructions. • The area of the park will be sodded and have head to head spray irrigation. • The planting strip surrounding the park area, outside the sidewalk area shall be prepared and planted as a sodded area. Trees for the park planting strip will be 10 Maples and 9 Green Ash trees alternated and spaced as drawn on Sheet Ll. Trees alternate such that no two trees planted next to one another are the same species in the street planting strips. PHASE 2 Specifications: 1. Revegetation of disturbed areas with cover crop: • An appropriate quick cover seed mix such as shown above or comparable. • Surface preparation: hard packed or caked topsoil shall be scarified or disked. • Broadcast seed to the specified application rate and rake over to set seed. 2. Activity Park • The 5' wide path shall be laid out and constructed of a 2" Asphalt mat over a 6" crushed gravel base 7 ft wide. • Concrete pads (9'x17') for the lean-to shelters, 4" thick over a 6" crushed gravel base. A pedestal type barbecue shall be installed on each of the 3 pads at the time of construction and placed according to the design plan. • Lean-to shelter shall be constructed to cover an area of 10' by 12'and shall be an open air, shed type construction. • The remaining area of the park will be covered to a depth of 6" with topsoil • The Picnic/Play area of the park will be sodded and have head to head spray irrigation. Drip irrigation for shade trees and screening shrubs will be the responsibility of the irrigation contractor. Temporary irrigation will be provided to establish the permanent native grass mix in the activity area of the park. • One shade tree and 3 Lilacs will be planted near each picnic pad and screening shrubs (Pea Shrubs) will be planted along residential lot margins and as indicated on Sheet Ll. • The planting strip on the south east margin of the park area, outside the sidewalk area shall be prepared and planted as the sodded planting strips. Plant materials for the park planting strip will be 2 Maples and 2 Green Ash trees alternated and spaced as indicated on Sheet Ll. • The Activity areas will be prepared for permanent planting by smoothing or raking. Hard packed or caked topsoil shall be scarified or disking prior to seeding. Broadcast field grass seed to the specified pure live seed application rate and lightly rake over to set seed. PHASE 3 Specifications: 1. Revegetation of disturbed areas with cover crop: • An appropriate quick cover seed mix such as shown above or comparable. • Surface preparation: hard packed or caked topsoil shall be scarified or disked. Broadcast seed to the specified application rate and rake over to set seed. 2. View Park • The 5' wide path shall be laid out according to design and constructed of a 2" Asphalt mat over a 6" crushed gravel base 7 ft wide. • Two 20' by 18' parking stalls shall be constructed in a manner consistent with the adjacent street profile on the southern end of the park • Benches shall be installed according to manufacturer's instructions at design locations. • The remaining area of the park will be covered to a depth of 6" with topsoil. • Two shade trees shall be planted as shown on the drawings north of the parking area as drawn. • The field grass areas will be prepared for permanent planting by smoothing or raking. Hard packed or caked topsoil shall be scarified or disking prior to seeding. Broadcast field grass seed to the specified pure live seed application rate and lightly rake over to set seed. • The planting strip on the south margin of the park, outside the sidewalk area shall be prepared and planted as the entry median. Trees for the park planting strip will be 1 Green Ash tree placed as shown on Sheet Ll. • Install bollards per manufacturer's specifications. INDIVIDUAL LOT LANDSCAPING Landscaping of individual project lots will commence after the completion of each home. Likewise, the irrigation and plant materials (sod and street trees) designed for the frontage of each lot will be installed after the completion of each home. An escrow fund or surety shall be arranged between the developer and individual lot owner at the time of sale for each lot and shall be in an amount sufficient to purchase, install and irrigate all required plant material for each individual lot as specified by the City of Rexburg Development Code, Chapter 4.15, K., 7. and as indicated for all planting strip areas as described on Sheet Ll and supporting Bid Sheets and Specifications. The developer will complete the street improvements including paving, curb and sidewalk within each phase of development. It is anticipated that development of residential structures on small individual lots will require all of the space from the back of curb to the lot lines. Therefore street trees and sod will not be installed in the planting strip until each home is completed. Planting strip vegetation will be irrigated by associated individual residential irrigation systems. • Approved Planned Unit Development requirements for each lot include: two 2" caliper shade trees in each front yard; one 1.5" caliper shade tree in each back yard; and four shrubs on each lot. PLANTING DETAILS I-, "-I ...... MITI, cr w"'Irill- It .... I'l, mll4 LIM 601 l" ITT., ;—I -i , T;,I, ,Am ;,r ptxalu Tl—y, 17 ll, o vd, IIT) ....... :T,l F".; "', ITT L. l 0], IA, ll"I ITT, :1, ,,1 Lill"", " I'll..) -Wa .... . „11 at41iey. ..umtl,h :41" 1 Deciduous Tree Planting DeCtil ,Lfw-Te GIIrV Wil 11,,114 (Ille, k Ill 0'. ar P.11 Ilml, I I all .'vwdew AA,:�, rofsJc..I AT, D'. ea MITI,, sMAV--1 fil,ctv 1, 'dT;T 0 k, Cqw,p r :,b,u I. ill Idem'r j4lw;.p ii,& 011. IT, l.,t rcJ ,LAI I ,lc, yl pt", " w"'t, ld�fl.lblll Tltl Tlv 1,T61 04.fl, I.-. .11 Ilk r.T1 ;ll.d rm.l, Ii, l;,,d fillll� w ll,� 1-,l il SHRUB PLANTING. 7 FOUNDER'S SQUARE Phase 1 Landscape Bid Sheet Area Item Quantity Units Description Cost/Unit Total Cost Temporary Revs station Grass seed mix variable SF disturbed area Subtotal Boulevard Entry Planting Strip Littleleaf Linden 8 EA 3" caliper tree, Irrlgatlon, Installation sod 2,310 SF sod, Irrigation, Installation Subtotal Founder's Square Park green sod 34,398 SF sod, Irrigation, Installation benches 6 EA 6'-7'bench determined by developer flagpole 1 EA 35' or determined by developer memorial marker 1 EA determined by developer concrete 12.8 CY for bench pads and memorial pad 3/4" crush rock (6" base) 39.7 ton pad bases Subtotal Park Planter Strip Acer species 10 EA 2" caliper tree, drip Irrigation, Installation Green Ash 9 EA 2" caliper tree, drip irrigation, installation sod 6,084 SF sod, Irrigation, Installation Subtotal Perimeter Planting Perimeter Planting Siberian Peashrub 300 EA shrub, drip Irrigation, installation 5' O.C. grass area 19,811 SF permanent dry area native grass mix Subtotal Lots Planting Strip Planting Strip Phase Totals 47 lots (excludes the park) Acer species 65 EA 2" caliper tree, drip Irrigation, installation Green Ash 65 EA 2" caliper tree, drip Irrigation, installation Sod 41,678 SF turf, Irrigation, Installation Subtotal Phase 1 Total Page 1 Founders Square Landscape Bid Sheets 021208 FOUNDER'S SQUARE Phase 2 Landscape Bid Sheet Area Item quantity Units Description Cost/Unit Total Cost Temporary Grass seed variable SF disturbed area Reve etadon mix Subtotal Activity Park Picnic/play area Sod 13,598 SF sod, Irrigation, Installation picnic and playground area concrete 4.3 CY picnic pads, 9X17' to allow Yclear space for access around table and barbecue 3/4" crush 3.3 TON pad base rock Picnic tables/ 3 EA 6'table with benches attached benches Installed on pad Barbecues 3 EA 300 sq In grill, pedestal, 20"x15"x10"on 36"installed pedestal Lean-to 3 EA 10x12 to shade shelter table Playground developer equipment choice Subtotal Path Asphalt 34.8 TON 5' wide asphalt path, 2" thick 3/4" crushed 142.1 CY 7' wide %'crushed rock I Irock base, 6" thick Bollards 3 EA 4' long concrete cylinder Implanted In the center of the path at each entry to prevent vehicles on path Bike rack 1 EA multiple bike rack, Installed at entry to park area, set In concrete Subtotal Page 2 Founders Square Landscape Bid Sheets 021208 Page 3 Founders Square Landscape Bid Sheets 021208 Activity area Grass area 58,588 SF permanent dry area native grass mix Park Trees Acer species 2 EA 2" caliper, drip Irrigation and Installation Green Ash 1 EA 2" caliper, drip irrigation and Installation Screening shrubs Lilacs 9 EA 10 to 15 gal. shrubs, installation Pea Shrubs 95 EA 11 to 15 gal. shrubs, installation 5' O.C. Mulch 19.7 CY 3" bark Mulch for screening shrubs Subtotal Park Planting Strip Acer species 2 EA 2" caliper, drip Irrigation and Installation Green Ash 2 EA 2" callper, drip Inigatlon and Installation Sod 1324.5 S.F. sod, Irrigation, Installation Subtotal Lots Planting Strip Planting Strip Phase Acer species 27 EA 2" caliper tree, drip Totals for 26 lots Irrigation, Installation (excludes the park) Green Ash 26 EA 2" caliper tree, drip Irrigation, installation Sod 18375.5 S.F. sod, Irrigation, installation Subtotal Phase2 Total Page 3 Founders Square Landscape Bid Sheets 021208 FOUNDER'S SQUARE Phase 3 Landscape Bid Sheet Area Item quantity Units Description Cost/Unit Total Cost Temporary Revs station Grass seed mix variable SF disturbed area Subtotal View Park Path Asphalt 68.5 TON 5' vide asphalt path, 2" thick Crushed rock 254.2CY 7' vide crushed rock base 6" thick Bollards 2 EA 4' long concrete cylinder Implanted In the center of the path at each entry to prevent vehicles on path Stairs 4 EA Each set of stairs has 5 steps Subtotal Parking Asphalt 4.7 TON (2) 20'x18' pads 2" thick 3/4" crush rock 6.7 CY 7' wide crushed rock base Bike rack t EA multiple bike rack, Installed at entry to park area, set in concrete Subtotal Park area Grass area 58588.3 S.F. permanent dry area native grass mix Subtotal Park Trees Green Ash 3 EA 2" caliper tree, drip Irrigation, installation Benches 3 EA 6 - 7' bench determined by develo er Subtotal Lots Planting Strip Planting Strip Phase Totals for 35 lots (excludes the park) Acer species 46 EA 2" caliper tree, drip irrigation, Installation Green Ash 45 EA 2" caliper tree, drip Irrigation, installation Sod 22454.5 S.F. sod, Irrigation, Installation Subtotal Phase 3 Total All Phases Total Page 4 Founders Square Landscape Bid Sheets 021208