HomeMy WebLinkAboutRESCHECK - 20-00702 - 997 McJon Ln - Lords - New SFRGenerated by REScheck-Web Software
Compliance Certificate
Project Lords House
Energy Code:2009 IECC
Location:Rexburg, Idaho
Construction Type:Single-family
Project Type:New Construction
Conditioned Floor Area:2,680 ft2
Glazing Area 11%
Climate Zone:6 (8693 HDD)
Permit Date:
Construction Site:Owner/Agent:Designer/Contractor:
Permit Number:
Compliance: Passes using UA trade-off
0.0% Better Than Code Maximum UA:426 Your UA:426
The % Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Compliance:
Envelope Assemblies
Assembly
Gross Area
or
Perimeter
Cavity
R-Value
Cont.
R-Value U-Factor UA
Ceiling: Flat Ceiling or Scissor Truss 2,680 49.0 0.0 0.026 70
Wall: Wood Frame, 16" o.c.2,043 21.0 0.0 0.057 100
Door: Solid Door (under 50% glazing)63 0.300 19
Door 1: Glass Door (over 50% glazing)21 0.300 6
Window 3: Vinyl Frame 206 0.350 72
Floor: Slab-On-Grade (Unheated)
Insulation depth: 3.0'
227 11.0 0.699 159
Name - Title Signature Date
Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other
calculations submitted with the permit application. The proposed building has been designed to meet the 2009 IECC requirements in
REScheck Version : REScheck-Web and to comply with the mandatory requirements listed in the REScheck Inspection Checklist.
Project Title: Lords House
Data filename:Page 1 of 7
09/13/20Report date:
Inspection Checklist
Requirements: 0.0% were addressed directly in the REScheck software
REScheck Software Version : REScheck-Web
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2009 IECC
Section
#
& Req.ID
Pre-Inspection/Plan Review Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
103.2
[PR1]1
Construction drawings and
documentation demonstrate
energy code compliance for the
building envelope.
Complies
Does Not
Not Observable
Not Applicable
103.2,
403.7
[PR3]1
Construction drawings and
documentation demonstrate
energy code compliance for
lighting and mechanical systems.
Systems serving multiple
dwelling units must demonstrate
compliance with the commercial
code.
Complies
Does Not
Not Observable
Not Applicable
403.6
[PR2]2
Heating and cooling equipment is
sized per ACCA Manual S based
on loads per ACCA Manual J or
other approved methods.
Heating:
Btu/hr_____
Cooling:
Btu/hr_____
Heating:
Btu/hr_____
Cooling:
Btu/hr_____
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Lords House
Data filename:Page 2 of 7
09/13/20Report date:
Section
#
& Req.ID
Foundation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1
[FO1]1
Slab edge insulation R-value.R-_____
Unheated
Heated
R-_____
Unheated
Heated
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2,
402.2.8
[FO2]1
Slab edge insulation installed per
manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
402.1.1
[FO3]1
Slab edge insulation
depth/length.
_____ ft _____ ft Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2.1
[FO11]2
A protective covering is installed
to protect exposed exterior
insulation and extends a
minimum of 6 in. below grade.
Complies
Does Not
Not Observable
Not Applicable
403.8
[FO12]2
Snow- and ice-melting system
controls installed.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Lords House
Data filename:Page 3 of 7
09/13/20Report date:
Section
#
& Req.ID
Framing / Rough-In Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1,
402.3.4
[FR1]1
Door U-factor.U-_____U-_____Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
402.1.1,
402.3.1,
402.3.3,
402.5
[FR2]1
Glazing U-factor (area-weighted
average).
U-_____U-_____Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.1.3
[FR4]1
U-factors of fenestration products
are determined in accordance
with the NFRC test procedure or
taken from the default table.
Complies
Does Not
Not Observable
Not Applicable
402.4.4
[FR20]1
Fenestration that is not site built
is listed and labeled as meeting
AAMA/WDMA/CSA 101/I.S.2/A440
or has infiltration rates per NFRC
400 that do not exceed code
limits.
Complies
Does Not
Not Observable
Not Applicable
402.4.5
[FR16]2
IC-rated recessed lighting fixtures
sealed at housing/interior finish
and labeled to indicate ≤2.0 cfm
leakage at 75 Pa.
Complies
Does Not
Not Observable
Not Applicable
403.2.1
[FR12]1
Supply ducts in attics are
insulated to ≥R-8. All other ducts
in unconditioned spaces or
outside the building envelope are
insulated to ≥R-6.
R-_____
R-_____
R-_____
R-_____
Complies
Does Not
Not Observable
Not Applicable
403.2.2
[FR13]1
All joints and seams of air ducts,
air handlers, filter boxes, and
building cavities used as return
ducts are sealed.
Complies
Does Not
Not Observable
Not Applicable
403.2.3
[FR15]3
Building cavities are not used for
supply ducts.
Complies
Does Not
Not Observable
Not Applicable
403.3
[FR17]2
HVAC piping conveying fluids
above 105 ºF or chilled fluids
below 55 ºF are insulated to ≥R-
3.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
403.4
[FR18]2
Circulating service hot water
pipes are insulated to R-2.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
403.5
[FR19]2
Automatic or gravity dampers are
installed on all outdoor air
intakes and exhausts.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Lords House
Data filename:Page 4 of 7
09/13/20Report date:
Section
#
& Req.ID
Insulation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
303.1
[IN13]2
All installed insulation is labeled
or the installed R-values
provided.
Complies
Does Not
Not Observable
Not Applicable
402.1.1,
402.2.4,
402.2.5
[IN3]1
Wall insulation R-value. If this is a
mass wall with at least ½ of the
wall insulation on the wall
exterior, the exterior insulation
requirement applies.
R-_____
Wood
Mass
Steel
R-_____
Wood
Mass
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2
[IN4]1
Wall insulation is installed per
manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Lords House
Data filename:Page 5 of 7
09/13/20Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1,
402.2.1,
402.2.2
[FI1]1
Ceiling insulation R-value. Where
> R-30 is required, R-30 can be
used if insulation is not
compressed at eaves. R-30 may
be used for 500 ft² or 20%
(whichever is less) where
sufficient space is not available.
R-_____
Wood
Steel
R-_____
Wood
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.1.1.1,
303.2
[FI2]1
Ceiling insulation installed per
manufacturer’s instructions.
Blown insulation marked every
300 ft².
Complies
Does Not
Not Observable
Not Applicable
402.2.3
[FI3]1
Attic access hatch and door
insulation ≥R-value of the
adjacent assembly.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
402.4.2,
402.4.2.1
[FI17]1
Building envelope tightness
verified by blower door test result
of <7 ACH at 50 Pa. This
requirement may instead be met
via visual inspection, in which
case verification may need to
occur during Insulation
Inspection.
ACH 50 =_____ACH 50 =_____Complies
Does Not
Not Observable
Not Applicable
403.2.2
[FI4]1
Post construction duct tightness
test result of ≤8 cfm to outdoors,
or ≤12 cfm across systems. Or,
rough-in test result of ≤6 cfm
across systems or ≤4 cfm
without air handler. Rough-in test
verification may need to occur
during Framing Inspection.
_____ cfm _____ cfm Complies
Does Not
Not Observable
Not Applicable
403.1.1
[FI9]2
Programmable thermostats
installed on forced air furnaces.
Complies
Does Not
Not Observable
Not Applicable
403.1.2
[FI10]2
Heat pump thermostat installed
on heat pumps.
Complies
Does Not
Not Observable
Not Applicable
403.4
[FI11]2
Circulating service hot water
systems have automatic or
accessible manual controls.
Complies
Does Not
Not Observable
Not Applicable
404.1
[FI6]1
50% of lamps in permanent
fixtures are high efficacy lamps.
Complies
Does Not
Not Observable
Not Applicable
401.3
[FI7]2
Compliance certificate posted.Complies
Does Not
Not Observable
Not Applicable
303.3
[FI18]3
Manufacturer manuals for
mechanical and water heating
equipment have been provided.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Lords House
Data filename:Page 6 of 7
09/13/20Report date:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Lords House
Data filename:Page 7 of 7
09/13/20Report date:
2009 IECC Energy
Efficiency Certificate
Insulation Rating R-Value
21.00Above-Grade Wall
0.00Below-Grade Wall
11.00Floor
49.00Ceiling / Roof
_______Ductwork (unconditioned spaces):
Glass & Door Rating SHGCU-Factor
0.35Window
0.30Door
Heating & Cooling Equipment Efficiency
_______Heating System:_________________________
_______Cooling System:_________________________
_______Water Heater:___________________________
Name:Date:
Comments