Loading...
HomeMy WebLinkAboutRESCHECK - 20-00702 - 997 McJon Ln - Lords - New SFRGenerated by REScheck-Web Software Compliance Certificate Project Lords House Energy Code:2009 IECC Location:Rexburg, Idaho Construction Type:Single-family Project Type:New Construction Conditioned Floor Area:2,680 ft2 Glazing Area 11% Climate Zone:6 (8693 HDD) Permit Date: Construction Site:Owner/Agent:Designer/Contractor: Permit Number: Compliance: Passes using UA trade-off 0.0% Better Than Code Maximum UA:426 Your UA:426 The % Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Compliance: Envelope Assemblies Assembly Gross Area or Perimeter Cavity R-Value Cont. R-Value U-Factor UA Ceiling: Flat Ceiling or Scissor Truss 2,680 49.0 0.0 0.026 70 Wall: Wood Frame, 16" o.c.2,043 21.0 0.0 0.057 100 Door: Solid Door (under 50% glazing)63 0.300 19 Door 1: Glass Door (over 50% glazing)21 0.300 6 Window 3: Vinyl Frame 206 0.350 72 Floor: Slab-On-Grade (Unheated) Insulation depth: 3.0' 227 11.0 0.699 159 Name - Title Signature Date Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application. The proposed building has been designed to meet the 2009 IECC requirements in REScheck Version : REScheck-Web and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Project Title: Lords House Data filename:Page 1 of 7 09/13/20Report date: Inspection Checklist Requirements: 0.0% were addressed directly in the REScheck software REScheck Software Version : REScheck-Web Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 2009 IECC Section # & Req.ID Pre-Inspection/Plan Review Plans Verified Value Field Verified Value Complies?Comments/Assumptions 103.2 [PR1]1 Construction drawings and documentation demonstrate energy code compliance for the building envelope. Complies Does Not Not Observable Not Applicable 103.2, 403.7 [PR3]1 Construction drawings and documentation demonstrate energy code compliance for lighting and mechanical systems. Systems serving multiple dwelling units must demonstrate compliance with the commercial code. Complies Does Not Not Observable Not Applicable 403.6 [PR2]2 Heating and cooling equipment is sized per ACCA Manual S based on loads per ACCA Manual J or other approved methods. Heating: Btu/hr_____ Cooling: Btu/hr_____ Heating: Btu/hr_____ Cooling: Btu/hr_____ Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Lords House Data filename:Page 2 of 7 09/13/20Report date: Section # & Req.ID Foundation Inspection Plans Verified Value Field Verified Value Complies?Comments/Assumptions 402.1.1 [FO1]1 Slab edge insulation R-value.R-_____ Unheated Heated R-_____ Unheated Heated Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 303.2, 402.2.8 [FO2]1 Slab edge insulation installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable 402.1.1 [FO3]1 Slab edge insulation depth/length. _____ ft _____ ft Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 303.2.1 [FO11]2 A protective covering is installed to protect exposed exterior insulation and extends a minimum of 6 in. below grade. Complies Does Not Not Observable Not Applicable 403.8 [FO12]2 Snow- and ice-melting system controls installed. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Lords House Data filename:Page 3 of 7 09/13/20Report date: Section # & Req.ID Framing / Rough-In Inspection Plans Verified Value Field Verified Value Complies?Comments/Assumptions 402.1.1, 402.3.4 [FR1]1 Door U-factor.U-_____U-_____Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 402.1.1, 402.3.1, 402.3.3, 402.5 [FR2]1 Glazing U-factor (area-weighted average). U-_____U-_____Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 303.1.3 [FR4]1 U-factors of fenestration products are determined in accordance with the NFRC test procedure or taken from the default table. Complies Does Not Not Observable Not Applicable 402.4.4 [FR20]1 Fenestration that is not site built is listed and labeled as meeting AAMA/WDMA/CSA 101/I.S.2/A440 or has infiltration rates per NFRC 400 that do not exceed code limits. Complies Does Not Not Observable Not Applicable 402.4.5 [FR16]2 IC-rated recessed lighting fixtures sealed at housing/interior finish and labeled to indicate ≤2.0 cfm leakage at 75 Pa. Complies Does Not Not Observable Not Applicable 403.2.1 [FR12]1 Supply ducts in attics are insulated to ≥R-8. All other ducts in unconditioned spaces or outside the building envelope are insulated to ≥R-6. R-_____ R-_____ R-_____ R-_____ Complies Does Not Not Observable Not Applicable 403.2.2 [FR13]1 All joints and seams of air ducts, air handlers, filter boxes, and building cavities used as return ducts are sealed. Complies Does Not Not Observable Not Applicable 403.2.3 [FR15]3 Building cavities are not used for supply ducts. Complies Does Not Not Observable Not Applicable 403.3 [FR17]2 HVAC piping conveying fluids above 105 ºF or chilled fluids below 55 ºF are insulated to ≥R- 3. R-_____R-_____Complies Does Not Not Observable Not Applicable 403.4 [FR18]2 Circulating service hot water pipes are insulated to R-2. R-_____R-_____Complies Does Not Not Observable Not Applicable 403.5 [FR19]2 Automatic or gravity dampers are installed on all outdoor air intakes and exhausts. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Lords House Data filename:Page 4 of 7 09/13/20Report date: Section # & Req.ID Insulation Inspection Plans Verified Value Field Verified Value Complies?Comments/Assumptions 303.1 [IN13]2 All installed insulation is labeled or the installed R-values provided. Complies Does Not Not Observable Not Applicable 402.1.1, 402.2.4, 402.2.5 [IN3]1 Wall insulation R-value. If this is a mass wall with at least ½ of the wall insulation on the wall exterior, the exterior insulation requirement applies. R-_____ Wood Mass Steel R-_____ Wood Mass Steel Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 303.2 [IN4]1 Wall insulation is installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Lords House Data filename:Page 5 of 7 09/13/20Report date: Section # & Req.ID Final Inspection Provisions Plans Verified Value Field Verified Value Complies?Comments/Assumptions 402.1.1, 402.2.1, 402.2.2 [FI1]1 Ceiling insulation R-value. Where > R-30 is required, R-30 can be used if insulation is not compressed at eaves. R-30 may be used for 500 ft² or 20% (whichever is less) where sufficient space is not available. R-_____ Wood Steel R-_____ Wood Steel Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 303.1.1.1, 303.2 [FI2]1 Ceiling insulation installed per manufacturer’s instructions. Blown insulation marked every 300 ft². Complies Does Not Not Observable Not Applicable 402.2.3 [FI3]1 Attic access hatch and door insulation ≥R-value of the adjacent assembly. R-_____R-_____Complies Does Not Not Observable Not Applicable 402.4.2, 402.4.2.1 [FI17]1 Building envelope tightness verified by blower door test result of <7 ACH at 50 Pa. This requirement may instead be met via visual inspection, in which case verification may need to occur during Insulation Inspection. ACH 50 =_____ACH 50 =_____Complies Does Not Not Observable Not Applicable 403.2.2 [FI4]1 Post construction duct tightness test result of ≤8 cfm to outdoors, or ≤12 cfm across systems. Or, rough-in test result of ≤6 cfm across systems or ≤4 cfm without air handler. Rough-in test verification may need to occur during Framing Inspection. _____ cfm _____ cfm Complies Does Not Not Observable Not Applicable 403.1.1 [FI9]2 Programmable thermostats installed on forced air furnaces. Complies Does Not Not Observable Not Applicable 403.1.2 [FI10]2 Heat pump thermostat installed on heat pumps. Complies Does Not Not Observable Not Applicable 403.4 [FI11]2 Circulating service hot water systems have automatic or accessible manual controls. Complies Does Not Not Observable Not Applicable 404.1 [FI6]1 50% of lamps in permanent fixtures are high efficacy lamps. Complies Does Not Not Observable Not Applicable 401.3 [FI7]2 Compliance certificate posted.Complies Does Not Not Observable Not Applicable 303.3 [FI18]3 Manufacturer manuals for mechanical and water heating equipment have been provided. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Lords House Data filename:Page 6 of 7 09/13/20Report date: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Lords House Data filename:Page 7 of 7 09/13/20Report date: 2009 IECC Energy Efficiency Certificate Insulation Rating R-Value 21.00Above-Grade Wall 0.00Below-Grade Wall 11.00Floor 49.00Ceiling / Roof _______Ductwork (unconditioned spaces): Glass & Door Rating SHGCU-Factor 0.35Window 0.30Door Heating & Cooling Equipment Efficiency _______Heating System:_________________________ _______Cooling System:_________________________ _______Water Heater:___________________________ Name:Date: Comments