Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 4 - 19-00736 - The Grove at Thomson Farms - Linden - 30 Unit Bldg 7Project Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Thompson Farms 20001 Stillwater Equity Partners Virgin Concrete 08-25-2020 Fair 2:30 PM 93.3 6:00 PM I arrived on site to begin my observation of the Concrete Reinforcement and of the Concrete Placement for the foundation walls and the footings of "Building 11". I observed that the Concrete Reinforcement was in general conformance with project documents. I then observed the Concrete Placement. I observed that the contractor used a pump to place the concrete and that they consolidated the foundation walls mechanically using a vibrator and the footings manually using concrete placers. I observed throughout the entire pour. I observed that the Concrete Placement was in general conformance to project documents. Digitally signed by Jacob P Christensen Date: 2020.08.26 10:38:00 -06'00'8129697 Placement for foundation walls. Reinforcement for footing. Placement for footing. L.Camarillo Page 2 of 2 Description: Description: Description: Description: Additional Comments: