HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 4 - 19-00736 - The Grove at Thomson Farms - Linden - 30 Unit Bldg 7Project Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Thompson Farms
20001
Stillwater Equity Partners
Virgin Concrete 08-25-2020
Fair
2:30 PM
93.3
6:00 PM
I arrived on site to begin my observation of the Concrete Reinforcement and of the Concrete Placement for
the foundation walls and the footings of "Building 11". I observed that the Concrete Reinforcement was in
general conformance with project documents.
I then observed the Concrete Placement. I observed that the contractor used a pump to place the concrete
and that they consolidated the foundation walls mechanically using a vibrator and the footings manually
using concrete placers. I observed throughout the entire pour. I observed that the Concrete Placement was
in general conformance to project documents.
Digitally signed by Jacob P Christensen
Date: 2020.08.26 10:38:00 -06'00'8129697
Placement for foundation walls. Reinforcement for footing. Placement for footing.
L.Camarillo
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments: