HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 4 - 19-00732 - The Grove at Thomson Farms - Hawthorn - 30 Unit Bldg 3Project Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Thompson Farms
20001
Stillwater Equity Partners
Headwaters 08/24/2020
Overcast
11:30 AM
100.2
3:00 PM
I arrived at the concrete pour at approximately 11:30AM and began my observations. I observed that the
forums were correct as well as that the contractor double checked everything before the pour. The first
truck arrived late at approximately 12:30 PM. I got my first sample from that truck and began my testing. It
failed with 1 percent air. I then notified the contractor and the truck driver, which then the truck driver added
some air and continued with the pour. I then tested the second truck and it failed as well with 3 percent air,
but after adding air, it was brought up to a passing level. I then finished my testings and watched the rest of
the pour proceed. I observed that the contractor was within conformance to project documents during his
pour.
After the pour at approximately 2:00 PM I headed over to building 7 to begin my epoxy inspection. I
observed that the epoxy had not yet expired and was still in good condition. I also observed the contractor
clean out the holes, which I then doubled checked before they proceeded. I observed the rest of their work
and confirmed that they were within conformance to the project documents.
Digitally signed by Jacob P Christensen
Date: 2020.08.26 10:40:20 -06'00'
Concrete reinforcement Concrete placement concrete placement
L. Steiner
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments:
Expiration date for epoxy epoxy with bolt
epoxy with bolt expiration date of epoxy