HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 4 - 19-00739 - The Grove at Thomson Farms - Hazelwood - 20 Units Bld 6Project Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Thompson Farms
20001
Stillwater Equity Partners
Kevin Virgin Construction 08-21-2020
cloudy
12:30 PM
79
5:00 PM
I arrived to the project site and began my inspection of the Concrete Reinforcement and Concrete
Placement of the Southern Foundation Walls between points E and F of Building 4 from the project plans. I
observed that the Concrete Reinforcement was in general conformance with the project documents. I
observed that the Concrete Placement was in general conformance with the project documents. I observed
that the concrete was manually vibrated as instructed in the project documents. The Air Test for the
concrete from the first truck was 3.5%. I tested the second truck and the air was 4.0%. I read through the
project plans and found no minimum for Air percentage on the exterior foundation walls. I observed the
duration of the pour.
William Moffat Digitally signed by William Moffat Date: 2020.08.25 08:23:47 -06'00'8129697
Concrete Reinforcement Concrete Reinforcement Concrete Reinforcement
F. Pelton
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments:
Manual Vibration