Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 4 - 19-00739 - The Grove at Thomson Farms - Hazelwood - 20 Units Bld 6Project Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Thompson Farms 20001 Stillwater Equity Partners Kevin Virgin Construction 08-21-2020 cloudy 12:30 PM 79 5:00 PM I arrived to the project site and began my inspection of the Concrete Reinforcement and Concrete Placement of the Southern Foundation Walls between points E and F of Building 4 from the project plans. I observed that the Concrete Reinforcement was in general conformance with the project documents. I observed that the Concrete Placement was in general conformance with the project documents. I observed that the concrete was manually vibrated as instructed in the project documents. The Air Test for the concrete from the first truck was 3.5%. I tested the second truck and the air was 4.0%. I read through the project plans and found no minimum for Air percentage on the exterior foundation walls. I observed the duration of the pour. William Moffat Digitally signed by William Moffat Date: 2020.08.25 08:23:47 -06'00'8129697 Concrete Reinforcement Concrete Reinforcement Concrete Reinforcement F. Pelton Page 2 of 2 Description: Description: Description: Description: Additional Comments: Manual Vibration