HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION - Parking Lot - Thomson FarmsProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Thompson Farms
20001
Stillwater Equity Partners
Hill & Son Excavation 08/26/2020
Sunny
12:00 PM
75
2:30 PM
I arrived on site at approximately 12:00 PM. I observed that the contractor had prepared two portions of the
parking lot for a proof test. I observed the contractor use a water truck to wet down the parking lot and
subsequently drive the water truck over it. I observed that there were two sections that were pumping, or
deflecting, as they were driven over. I informed the contractor of the deficient areas, and marked them with
spray paint. The contractor will replace the deficient soil with pit run.
William Moffat Digitally signed by William Moffat Date: 2020.08.27 08:26:17 -06'00'8129697
Deficient area that will be replaced Deficient area that will be replaced Deficient area that will be replaced
D. Aust
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments: