Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION - Parking Lot - Thomson FarmsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Thompson Farms 20001 Stillwater Equity Partners Hill & Son Excavation 08/26/2020 Sunny 12:00 PM 75 2:30 PM I arrived on site at approximately 12:00 PM. I observed that the contractor had prepared two portions of the parking lot for a proof test. I observed the contractor use a water truck to wet down the parking lot and subsequently drive the water truck over it. I observed that there were two sections that were pumping, or deflecting, as they were driven over. I informed the contractor of the deficient areas, and marked them with spray paint. The contractor will replace the deficient soil with pit run. William Moffat Digitally signed by William Moffat Date: 2020.08.27 08:26:17 -06'00'8129697 Deficient area that will be replaced Deficient area that will be replaced Deficient area that will be replaced D. Aust Page 2 of 2 Description: Description: Description: Description: Additional Comments: