HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 3 - 19-00732 - The Grove at Thomson Farms - Hawthorn - 30 Unit Bldg 3Project Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Thompson Farms 20001 Stillwater Equity Partners Headwaters 08/24/2020 Overcast 11:30 AM 100.2 3:00 PM I arrived at the concrete pour at approximately 11:30AM and began my observations. I observed that the forums were correct as well as that the contractor double checked everything before the pour. The first truck arrived late at approximately 12:30 PM. I got my first sample from that truck and began my testing. It failed with 1 percent air. I then notified the contractor and the truck driver, which then the truck driver added some air and continued with the pour. I then tested the second truck and it failed as well with 3 percent air, but after adding air, it was brought up to a passing level. I then finished my testings and watched the rest of the pour proceed. I observed that the contractor was within conformance to project documents during his pour. After the pour at approximately 2:00 PM I headed over to building 7 to begin my epoxy inspection. I observed that the epoxy had not yet expired and was still in good condition. I also observed the contractor clean out the holes, which I then doubled checked before they proceeded. I observed the rest of their work and confirmed that they were within conformance to the project documents. Digitally signed by Jacob P Christensen Date: 2020.08.26 10:40:20 -06'00' Concrete reinforcement Concrete placement concrete placement L. Steiner Page 2 of 2 Description: Description: Description: Description: Additional Comments: Expiration date for epoxy epoxy with bolt epoxy with bolt expiration date of epoxy