Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 2 - 19-00739 - The Grove at Thomson Farms - Hazelwood - 20 Units Bld 6Project Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Thompson Farms 20001 Stillwater Equity Partners Virgin Concrete 08-26-2020 Fair 2:30 PM 92.4 5:00 PM I arrived on site to begin my observation of the Concrete Reinforcement and of the Concrete Placement for the foundation walls of the center section of "Building 4". I observed that the Concrete Reinforcement was in general conformance with project documents. I then observed the Concrete Placement. I observed that the contractor used a pump to place the concrete and that they consolidated the foundation walls mechanically using a vibrator. I observed throughout the entire pour. I observed that the Concrete Placement was in general conformance with project documents. William Moffat Digitally signed by William Moffat Date: 2020.08.27 08:30:41 -06'00'8129697 Reinforcement and framing.Adjusting frames. Placement and consolidation. L. Camarillo Page 2 of 2 Description: Description: Description: Description: Additional Comments: Finished foundation wall.