HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 2 - 19-00739 - The Grove at Thomson Farms - Hazelwood - 20 Units Bld 6Project Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Thompson Farms
20001
Stillwater Equity Partners
Virgin Concrete 08-26-2020
Fair
2:30 PM
92.4
5:00 PM
I arrived on site to begin my observation of the Concrete Reinforcement and of the Concrete Placement for
the foundation walls of the center section of "Building 4". I observed that the Concrete Reinforcement was
in general conformance with project documents.
I then observed the Concrete Placement. I observed that the contractor used a pump to place the concrete
and that they consolidated the foundation walls mechanically using a vibrator. I observed throughout the
entire pour. I observed that the Concrete Placement was in general conformance with project documents.
William Moffat Digitally signed by William Moffat Date: 2020.08.27 08:30:41 -06'00'8129697
Reinforcement and framing.Adjusting frames. Placement and consolidation.
L. Camarillo
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments:
Finished foundation wall.