HomeMy WebLinkAboutCONCRETE SPECIAL INSPECTION 2 - 20-00187 - 266 W 3rd S, 1 - Sundance West Side bld AProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Sundance Apartments
20016
Steven's Construction
Steven's Construction 08-14-2020
Clear
6:00 AM
45
9:30 AM
I arrived to the project site and began my observations of the Concrete Placement and Concrete
Reinforcement of Building 2 (or the West Building) Southern Slab. I observed that the Concrete
reinforcement was in general conformance with project documents. I observed the Concrete Placement
was in general conformance with the project documents. I observed that the concrete was vibrated with a
surface finisher. I observed the duration of the pour.
William Moffat Digitally signed by William Moffat Date: 2020.08.17 07:04:57 -06'00'8129697
Concrete Reinforcement Concrete Reinforcement
F. Pelton
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments: