HomeMy WebLinkAboutCONCRETE TEST 4 - 20-00188 - 266 W 3rd S, 1 - Sundance East Side bld BFROST Structural Engineering
1020 Lincoln Road Phone: 208.227.8404
Idaho Falls, ID 83401 Fax: 208.227.8405
www.frost-structural.com
SSI No. :
Re :
Project :
Date:SEAL:
To :
From :
Project No. :
Reference:Instruction:
FSE
The current TJI blocking in place of the 1-1/4" LSL blocking is
acceptable except at the 1st floor framing. At the 1st floor framing,
the TJI blocking is acceptable provided that a web stiffener (each
side of web) is installed in the TJI block.
204 / S4.0
B. Stevens
D. Porter
IF20-033
September 21, 2020
STRUCTURAL SUPPLEMENTAL INFORMATION
2
Detail 204
Sundance Apartments
September 21, 2020
Project Name:
Client:
Mix Number:
Project Number:
Ticket Number:
Load Amount:
Admixtures:
Tested By:
Date and Time:
Compressive Strength of Concrete Test Specimens
Field Test Data: (ASTM C143, C138, C173, C231, C31, C1064, and C511)
Slump (Inches):
Entrained Air (%):
Concrete Temperature:
Ambient Temperature:
Test Results:Minimum:Maximum:
Cylinder #
Lab Test Data: (ASTM C39, C42, C617, and C1231)
Break Age
Cylinder
Diameter (in)
Area
(in² )
Break
Date
Maximum Load
(lbs)
Break
Type
Compressive
Strength (psi)Required 28 day
Strength (psi)
°F
°F
Reviewed By:
Supplier:
Test Location:
Unit Weight (PCF):Set # :
Cylinders Picked Up By: Date and Time:
Hi / Low Temperatures
Remarks:
28-day Average Strength
Sundance Apartments
Steven's Construction
1710
20016
16587
11 of 55 yards
MP 322
F. Pelton
08-14-2020, 6:40 AM
3.25
2
65.8
45
3 5
0 2
238A
238E
238C
238B
238D
4 08/21/20
09/11/20
09/11/20
09/11/20
09/11/20
46,930 5 3,5003,73312.57
Walters Ready Mix
South East Section of Slab of Building B
7
28
28
28
H
1
F. Pelton 08/17/2020