Loading...
HomeMy WebLinkAboutCONCRETE TEST 4 - 20-00188 - 266 W 3rd S, 1 - Sundance East Side bld BFROST Structural Engineering 1020 Lincoln Road Phone: 208.227.8404 Idaho Falls, ID 83401 Fax: 208.227.8405 www.frost-structural.com SSI No. : Re : Project : Date:SEAL: To : From : Project No. : Reference:Instruction: FSE The current TJI blocking in place of the 1-1/4" LSL blocking is acceptable except at the 1st floor framing. At the 1st floor framing, the TJI blocking is acceptable provided that a web stiffener (each side of web) is installed in the TJI block. 204 / S4.0 B. Stevens D. Porter IF20-033 September 21, 2020 STRUCTURAL SUPPLEMENTAL INFORMATION 2 Detail 204 Sundance Apartments September 21, 2020 Project Name: Client: Mix Number: Project Number: Ticket Number: Load Amount: Admixtures: Tested By: Date and Time: Compressive Strength of Concrete Test Specimens Field Test Data: (ASTM C143, C138, C173, C231, C31, C1064, and C511) Slump (Inches): Entrained Air (%): Concrete Temperature: Ambient Temperature: Test Results:Minimum:Maximum: Cylinder # Lab Test Data: (ASTM C39, C42, C617, and C1231) Break Age Cylinder Diameter (in) Area (in² ) Break Date Maximum Load (lbs) Break Type Compressive Strength (psi)Required 28 day Strength (psi) °F °F Reviewed By: Supplier: Test Location: Unit Weight (PCF):Set # : Cylinders Picked Up By: Date and Time: Hi / Low Temperatures Remarks: 28-day Average Strength Sundance Apartments Steven's Construction 1710 20016 16587 11 of 55 yards MP 322 F. Pelton 08-14-2020, 6:40 AM 3.25 2 65.8 45 3 5 0 2 238A 238E 238C 238B 238D 4 08/21/20 09/11/20 09/11/20 09/11/20 09/11/20 46,930 5 3,5003,73312.57 Walters Ready Mix South East Section of Slab of Building B 7 28 28 28 H 1 F. Pelton 08/17/2020