HomeMy WebLinkAbout18-11-33 Covey Cove Subdivision, RESUBMIT - DEQ Approval LetterSTATE OF IDAHO
DEPARTMENT OF
ENVIRONMENTAL QUALITY
900 North Skyline Drive, Suite B • Idaho Falls, ID 83402 • (208) 528-2650
March 20, 2020
Bryce Dorion
732 Centennial Loop
Rexburg, ID 83440
Brad Little, Governor
John H . Tippets, Director
RE. Covey Cove Water and Sewer Plan and Specifications Resubmittal Design Review DEQ
No. 18-11-33.
Dear Mr. Dorion:
We have reviewed the resubmitted (received March 17, 20120) plans and specifications for the
proposed water and sewer system design and the design meets state standards and is therefore
approved.
Our approval is for the design. We will give final project approval after the project is constructed and
the as-built drawings submitted for our records. This office must review any deviations from the
approved design that might result in violations of Idaho Regulations before field installation.
Within 30 days after construction, a professional engineer registered in the State of Idaho must provide
this office with as-:built plans, or a letter of certification stating that the project was installed
substantially according to the approved design.
If you have any questions regarding this letter or if we can be of further assistance, please contact me
at (208) 528-2650.
Sincerely,
~:fr~Z~
Idaho Falls Regional Office
C: Paul Snarr, P.E., Eagle Rock Engineering
Keith Davidson, P.E., City of Rexburg