Loading...
HomeMy WebLinkAboutSOIL DENSITY 12 - 19-00732 - The Grove at Thomson Farms - Hawthorn - 30 Unit Bldg 3In Place Density of Soils ASTM D2922 & D3017 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test Number Depth: Elevation:% M: Proctor: % of Proctor: Test Number Test Number Test Number Test Number Test Location: Elevation: Material Type: % of Proctor: Proctor: % M: Dry: Wet: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Reviewed By: Remarks: Page 1 of 2 Depth: Depth: Depth: Depth: Depth: Depth: Pass Fail Dry: Wet:Test Location: Material Type: FailPass FailPass Pass Fail FailPass FailPass FailPass Test Number Test Number лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓнкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒ΍смннл The Grove 20001 Stillwater Equity Partners Hill & Son Jul 29, 2020 D. Aust 10:30 AM 2:30 PM 75650 610 2579 82' below finish grade 8.3 112 100% Backfilling of storm drain, East of Hawthorne Building, Approximately 50' East of Northeast corner of building 2' below finish grade Pit run 97% 118 12.3 114.7 128.8 97% 112 14.2 108.4 123.8 Pit run 2' below finish grade Backfilling of storm drain, East of Hawthorne Building, Approximately 100' East of Northeast corner of building 97% 112 10.8 108.4 120.1 Pit run 2' below finish grade Backfilling of storm drain, East of Hawthorne Building, Approximately 150' East of Northeast corner of building 97% 112 11.4 108.4 120.8 Pit run 2' below finish grade Backfilling of storm drain, East of Hawthorne Building, Approximately 200' East of Northeast corner of building 97% 118 9.6 114.2 125.2 Pit run 2' below finish grade Backfilling of storm drain, East of Hawthorne Building, Approximately 250' East of Northeast corner of building 95% 112 10.8 106.8 118.4 Pit run 1' below finish grade Backfilling of storm drain, East of Hawthorne Building, Approximately 50' East of Northeast corner of building Digitally signed by Jacob P Christensen Date: 2020.08.06 15:05:40 -06'00' 8 8 8 8 8 8 1 112 120.8Backfilling of storm drain, East of Hawthorne Building, Approximately 50' East of Northeast corner of building Pit run 5 6 7 2 3 4 Test Number % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M:Elevation: Wet:Test Location: Material Type: Dry: Page 2 of 2 % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: FailPass Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Test Number Test Number Test Number Test Number Test Number Test Number Test Number Test Number Test Number 95% 112 15.7 106 122.7 Pit run 1' below finish grade Backfilling of storm drain, East of Hawthorne Building, Approximately 100' East of Northeast corner of building 112 96% 11 107.2 119 Pit run 1' below finish grade Backfilling of storm drain, East of Hawthorne Building, Approximately 150' East of Northeast corner of building. 123 98% 9.3 120.2 131.3 Pit run 1' below finish grade Backfilling of storm drain, East of Hawthorne Building, Approximately 200' East of Northeast corner of building 112 101% 5.5 112.8 119.3 Pit run 1' below finish grade Backfilling of storm drain, East of Hawthorne Building, Approximately 250' East of Northeast corner of building 8 8 8 8 BS BS BS BS BS BS 8 11 9 10