Loading...
HomeMy WebLinkAboutSOIL DENSITY 6 - 19-00740 - The Grove at Thomson Farms - Blackoak - 20 Units - Bldg 5In Place Density of Soils ASTM D2922 & D3017 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test Number Depth: Elevation:% M: Proctor: % of Proctor: Test Number Test Number Test Number Test Number Test Location: Elevation: Material Type: % of Proctor: Proctor: % M: Dry: Wet: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Reviewed By: Remarks: Page 1 of 2 Depth: Depth: Depth: Depth: Depth: Depth: Pass Fail Dry: Wet:Test Location: Material Type: FailPass FailPass Pass Fail FailPass FailPass FailPass Test Number Test Number лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓнкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒ΍смннл The Grove 20001 Stillwater Equity Partners Hill & Son Jul 29, 2020 F. Pelton 11:45 AM 2:45 PM 3743 734 2717 BSTop of Base 5.6 128 96% Approximately 3.3 and A.75 of Building 5. Top of Base 3/4 96% 128 5.8 123.4 130.5 96% 128 3.5 123 127.4 3/4 Top of Base Approximately 2.2 and A.75 of Building 5. 97% 128 5.7 123.7 130.7 3/4 Top of Base Approximately 1.5 and A.3 of Building 5. 99% 128 5.6 127 134.1 3/4 Top of Base Approximately 1.2 and A.9 of Building 5. 99% 128 6 126.4 134.1 3/4 Top of Base Approximately 1.2 and B.5 of Building 5. 100% 128 4.6 127.8 133.6 3/4 Top of Base Approximately 3.8 and B.5 of Building 5. Eli Jenkins Digitally signed by Eli Jenkins Date: 2020.07.30 07:57:20 -06'00' BS BS BS BS BS BS 1 123 130.2Approximately 3.9 and A.5 of Building 5. 3/4 5 6 7 2 3 4 Test Number % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M:Elevation: Wet:Test Location: Material Type: Dry: Page 2 of 2 % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: FailPass Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Test Number Test Number Test Number Test Number Test Number Test Number Test Number Test Number Test Number 95% 128 4.8 121.2 127 3/4 Top of Base Approximately 3.8 and C.1 of Building 5. 128 97% 4.6 124.4 130.1 3/4 Top of Base Approximately 1.5 and C.1 of Building 5. 128 96% 5 123.1 129.2 3/4 Top of Base Approximately 1.5 and C.6 of Building 5. 128 97% 4.2 124.4 129.5 3/4 Top of Base Approximately 3.8 and C.6 of Building 5. 128 96% 4.8 122.9 128.9 3/4 Top of Base Approximately 1.5 and C.9 of Building 5. 128 96% 5.4 123.2 129.9 3/4 Top of Base Approximately 1.5 and D.5 of Building 5. 128 95% 2.4 121.1 124 3/4 Top of Base Approximately 2.5 and D.7 of Building 5. 128 96% 3.8 123.2 127.8 3/4 Top of Base Approximately 3.9 and E.6 of Building 5. 128 97% 4.3Top of Base 128.9Approximately 3.2 and E.7 of Building 5. 3/4 123.6 101% 128 4.2 129.1 134.5 3/4 Top of Base Approximately 2.25 and E.7 of Building 5. BS BS BS BS BS BS BS BS BS BS 8 11 15 16 17 9 10 14 13 12