HomeMy WebLinkAboutSOIL DENSITY 6 - 19-00740 - The Grove at Thomson Farms - Blackoak - 20 Units - Bldg 5In Place Density of Soils ASTM D2922 & D3017
Project Name:
Project Number:
Client:
Contractor:
Date:Tested By:
Time Start:Time End:
Instrument ID
Daily Standardization:MS:DS:
Test
Number
Depth: Elevation:% M:
Proctor:
% of
Proctor:
Test
Number
Test
Number
Test
Number
Test
Number
Test Location:
Elevation:
Material Type:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Reviewed By:
Remarks:
Page 1 of 2
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Pass Fail
Dry:
Wet:Test Location:
Material Type:
FailPass
FailPass
Pass Fail
FailPass
FailPass
FailPass
Test
Number
Test
Number
лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓнкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒсмннл
The Grove
20001
Stillwater Equity Partners
Hill & Son
Jul 29, 2020 F. Pelton
11:45 AM 2:45 PM
3743
734 2717
BSTop of Base 5.6
128
96%
Approximately 3.3 and A.75 of Building 5.
Top of Base
3/4
96%
128
5.8
123.4
130.5
96%
128
3.5
123
127.4
3/4
Top of Base
Approximately 2.2 and A.75 of Building 5.
97%
128
5.7
123.7
130.7
3/4
Top of Base
Approximately 1.5 and A.3 of Building 5.
99%
128
5.6
127
134.1
3/4
Top of Base
Approximately 1.2 and A.9 of Building 5.
99%
128
6
126.4
134.1
3/4
Top of Base
Approximately 1.2 and B.5 of Building 5.
100%
128
4.6
127.8
133.6
3/4
Top of Base
Approximately 3.8 and B.5 of Building 5.
Eli Jenkins Digitally signed by Eli Jenkins
Date: 2020.07.30 07:57:20
-06'00'
BS
BS
BS
BS
BS
BS
1
123
130.2Approximately 3.9 and A.5 of Building 5.
3/4
5
6
7
2
3
4
Test
Number
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:Elevation:
Wet:Test Location:
Material Type:
Dry:
Page 2 of 2
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
FailPass
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
95%
128
4.8
121.2
127
3/4
Top of Base
Approximately 3.8 and C.1 of Building 5.
128
97%
4.6
124.4
130.1
3/4
Top of Base
Approximately 1.5 and C.1 of Building 5.
128
96%
5
123.1
129.2
3/4
Top of Base
Approximately 1.5 and C.6 of Building 5.
128
97%
4.2
124.4
129.5
3/4
Top of Base
Approximately 3.8 and C.6 of Building 5.
128
96%
4.8
122.9
128.9
3/4
Top of Base
Approximately 1.5 and C.9 of Building 5.
128
96%
5.4
123.2
129.9
3/4
Top of Base
Approximately 1.5 and D.5 of Building 5.
128
95%
2.4
121.1
124
3/4
Top of Base
Approximately 2.5 and D.7 of Building 5.
128
96%
3.8
123.2
127.8
3/4
Top of Base
Approximately 3.9 and E.6 of Building 5.
128
97%
4.3Top of Base
128.9Approximately 3.2 and E.7 of Building 5.
3/4
123.6
101%
128
4.2
129.1
134.5
3/4
Top of Base
Approximately 2.25 and E.7 of Building 5.
BS
BS
BS
BS
BS
BS
BS
BS
BS
BS
8
11
15
16
17
9
10
14
13
12