Loading...
HomeMy WebLinkAboutSOIL DENSITY 4 - 19-00732, 19-00733, 19-00734 - The Grove at Thomson FarmsIn Place Density of Soils ASTM D2922 & D3017 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test Number Depth: Elevation:% M: Proctor: % of Proctor: Test Number Test Number Test Number Test Number Test Location: Elevation: Material Type: % of Proctor: Proctor: % M: Dry: Wet: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Reviewed By: Remarks: Page 1 of 2 Depth: Depth: Depth: Depth: Depth: Depth: Pass Fail Dry: Wet:Test Location: Material Type: FailPass FailPass Pass Fail FailPass FailPass FailPass Test Number Test Number лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓнкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒ΍смннл The Grove 20001 Stillwater Equity Partners Hill & Son Jul 28, 2020 D. Aust 12:30 PM 3:00 PM 3743 749 2737 62' below Bottom of asphalt 9.4 118.7 96% Backfilling above waterline between BLDGs 7, 8, & 9. Approximately 50' East of Northeast Corner of BLDG 7. 2' below Bottom of asphalt Native Material 95% 118.7 10 112.9 124.2 96% 118.7 8.1 114.2 123.4 Native Material 2' below Bottom of asphalt Backfilling above waterline between BLDGs 7, 8, & 9. Approximately 100' East of Northeast Corner of BLDG 7. 97% 112 14.4 108.2 123.7 Native Material 2' below Bottom of asphalt Backfilling above waterline between BLDGs 7, 8, & 9. Approximately 150' East of Northeast Corner of BLDG 7. 95% 118.7 9.3 112.4 122.8 Native Material 2' below Bottom of asphalt Backfilling above waterline between BLDGs 7, 8, & 9. Approximately 200' East of Northeast Corner of BLDG 7. 100% 118.7 7.6 118.5 127.5 Native Material 1' below Bottom of asphalt Backfilling above waterline between BLDGs 7, 8, & 9. Approximately 50' East of Northeast Corner of BLDG 7. 97% 112 11.4 108.1 120.4 Native Material 1' below Bottom of asphalt Backfilling above waterline between BLDGs 7, 8, & 9. Approximately 100' East of Northeast Corner of BLDG 7. Eli Jenkins Digitally signed by Eli Jenkins Date: 2020.07.30 07:53:55 -06'00' 6 6 6 6 6 6 1 114 124.2Backfilling above waterline between BLDGs 7, 8, & 9. Approximately 50' East of Northeast Corner of BLDG 7. Native Material 5 6 7 2 3 4 Test Number % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Proctor: % of Proctor: % M:Elevation: Wet:Test Location: Material Type: Dry: Page 2 of 2 % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: Depth: FailPass Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Test Number Test Number Test Number Test Number Test Number Test Number Test Number Test Number Test Number 98% 112 6.1 109.8 116.6 Native Material 1' below Bottom of asphalt Backfilling above waterline between BLDGs 7, 8, & 9. Approximately 150' East of Northeast Corner of BLDG 7. 118.7 97% 9.6 115.4 126.4 Native Material 1' below Bottom of asphalt Backfilling above waterline between BLDGs 7, 8, & 9. Approximately 200' East of Northeast Corner of BLDG 7. 118.7 99% 11.5 117.5 130.9 Native Material 6" below Bottom of asphalt Backfilling above waterline between BLDGs 7, 8, & 9. Approximately 50' East of Northeast Corner of BLDG 7. 118.7 95% 14.3 112.9 129.1 Native Material 6" below Bottom of asphalt Backfilling above waterline between BLDGs 7, 8, & 9. Approximately 100' East of Northeast Corner of BLDG 7. 112 99% 13.3 111.3 126.1 Native Material 6" below Bottom of asphalt Backfilling above waterline between BLDGs 7, 8, & 9. Approximately 150' East of Northeast Corner of BLDG 7. 6 6 6 6 6 8 11 9 10 12