HomeMy WebLinkAboutSOIL DENSITY 4 - 19-00732, 19-00733, 19-00734 - The Grove at Thomson FarmsIn Place Density of Soils ASTM D2922 & D3017
Project Name:
Project Number:
Client:
Contractor:
Date:Tested By:
Time Start:Time End:
Instrument ID
Daily Standardization:MS:DS:
Test
Number
Depth: Elevation:% M:
Proctor:
% of
Proctor:
Test
Number
Test
Number
Test
Number
Test
Number
Test Location:
Elevation:
Material Type:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Reviewed By:
Remarks:
Page 1 of 2
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Pass Fail
Dry:
Wet:Test Location:
Material Type:
FailPass
FailPass
Pass Fail
FailPass
FailPass
FailPass
Test
Number
Test
Number
лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓнкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒсмннл
The Grove
20001
Stillwater Equity Partners
Hill & Son
Jul 28, 2020 D. Aust
12:30 PM 3:00 PM
3743
749 2737
62' below Bottom of asphalt 9.4
118.7
96%
Backfilling above waterline between BLDGs 7, 8, & 9.
Approximately 50' East of Northeast Corner of BLDG 7.
2' below Bottom of asphalt
Native Material
95%
118.7
10
112.9
124.2
96%
118.7
8.1
114.2
123.4
Native Material
2' below Bottom of asphalt
Backfilling above waterline between BLDGs 7, 8, & 9.
Approximately 100' East of Northeast Corner of BLDG 7.
97%
112
14.4
108.2
123.7
Native Material
2' below Bottom of asphalt
Backfilling above waterline between BLDGs 7, 8, & 9.
Approximately 150' East of Northeast Corner of BLDG 7.
95%
118.7
9.3
112.4
122.8
Native Material
2' below Bottom of asphalt
Backfilling above waterline between BLDGs 7, 8, & 9.
Approximately 200' East of Northeast Corner of BLDG 7.
100%
118.7
7.6
118.5
127.5
Native Material
1' below Bottom of asphalt
Backfilling above waterline between BLDGs 7, 8, & 9.
Approximately 50' East of Northeast Corner of BLDG 7.
97%
112
11.4
108.1
120.4
Native Material
1' below Bottom of asphalt
Backfilling above waterline between BLDGs 7, 8, & 9.
Approximately 100' East of Northeast Corner of BLDG 7.
Eli Jenkins Digitally signed by Eli Jenkins
Date: 2020.07.30 07:53:55
-06'00'
6
6
6
6
6
6
1
114
124.2Backfilling above waterline between BLDGs 7, 8, & 9.
Approximately 50' East of Northeast Corner of BLDG 7.
Native Material
5
6
7
2
3
4
Test
Number
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Proctor:
% of
Proctor:
% M:Elevation:
Wet:Test Location:
Material Type:
Dry:
Page 2 of 2
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
FailPass
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
Test
Number
98%
112
6.1
109.8
116.6
Native Material
1' below Bottom of asphalt
Backfilling above waterline between BLDGs 7, 8, & 9.
Approximately 150' East of Northeast Corner of BLDG 7.
118.7
97%
9.6
115.4
126.4
Native Material
1' below Bottom of asphalt
Backfilling above waterline between BLDGs 7, 8, & 9.
Approximately 200' East of Northeast Corner of BLDG 7.
118.7
99%
11.5
117.5
130.9
Native Material
6" below Bottom of asphalt
Backfilling above waterline between BLDGs 7, 8, & 9.
Approximately 50' East of Northeast Corner of BLDG 7.
118.7
95%
14.3
112.9
129.1
Native Material
6" below Bottom of asphalt
Backfilling above waterline between BLDGs 7, 8, & 9.
Approximately 100' East of Northeast Corner of BLDG 7.
112
99%
13.3
111.3
126.1
Native Material
6" below Bottom of asphalt
Backfilling above waterline between BLDGs 7, 8, & 9.
Approximately 150' East of Northeast Corner of BLDG 7.
6
6
6
6
6
8
11
9
10
12