Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 6 - The Grove at Thomson FarmsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Thompson Farms 20001 Stillwater Equity Partners Kevin Virgin Construction 07/02/2020 cloudy 6:30 am 48 9:00 am I arrived on site and began my observation of the concrete reinforcement and concrete placement of the slab between grid points A-B. I observed the concrete reinforcement was in general conformance to project documents. I observed the concrete placement was in general conformance to the project documents. I observed the duration of the pour. Eli Jenkins Digitally signed by Eli Jenkins Date: 2020.07.06 08:05:07 -06'00'8129697 concrete reinforcement vibrating concrete F. Pelton Page 2 of 2 Description: Description: Description: Description: Additional Comments: