Loading...
HomeMy WebLinkAboutDENSITY OF SOILS - Thomson Farms - Building 4 & 3In Place Density of Soils ASTM D2922 & D3017 Project Name: Project Number: Client: Contractor: Date:Tested By: Time Start:Time End: Instrument ID Daily Standardization:MS:DS: Test Number Depth: Elevation:% M: Proctor: % of Proctor: Test Number Test Number Test Number Test Number Test Location: Elevation: Material Type: % of Proctor: Proctor: % M: Dry: Wet: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: % of Proctor: Proctor: % M: Dry: Wet: Material Type: Elevation: Test Location: Reviewed By: Remarks: Depth: Depth: Depth: Depth: Depth: Depth: Pass Fail нкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒ΍смннл Dry: Wet:Test Location: Material Type: FailPass FailPass Pass Fail FailPass FailPass FailPass Test Number Test Number лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓ The Grove 20001 Still Water Equity Hill and Son Excavation Jul 10, 2020 L. Camarillo 1:30 PM 5:00 PM 10483 636 2243 12~3' below finished grade. 4.9 123 95% Waterline backfill, ~40' e of fire hydrant near nw corner of Building 6. ~1' below finished grade. Native Soil 96% 123.3 10.3 118.9 131.1 97% 123.3 5.1 119.8 125.9 Native Soil ~2' below finished grade. Waterline backfill e of Barn, ~60' n of fire hydrant near nw corner of Building 4. Eli Jenkins Digitally signed by Eli Jenkins Date: 2020.07.14 07:12:13 -06'00' 12 12 1 117 122.5Waterline backfill, between Building 7 and Building 6. Native Soil 2 3