HomeMy WebLinkAboutDENSITY OF SOILS - Thomson Farms - Building 4 & 3In Place Density of Soils ASTM D2922 & D3017
Project Name:
Project Number:
Client:
Contractor:
Date:Tested By:
Time Start:Time End:
Instrument ID
Daily Standardization:MS:DS:
Test
Number
Depth: Elevation:% M:
Proctor:
% of
Proctor:
Test
Number
Test
Number
Test
Number
Test
Number
Test Location:
Elevation:
Material Type:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
% of
Proctor:
Proctor:
% M:
Dry:
Wet:
Material Type:
Elevation:
Test Location:
Reviewed By:
Remarks:
Depth:
Depth:
Depth:
Depth:
Depth:
Depth:
Pass Fail
нкймΎпйоΗΜϛϏϚϋкΛϏύψϟͥΒсмннл
Dry:
Wet:Test Location:
Material Type:
FailPass
FailPass
Pass Fail
FailPass
FailPass
FailPass
Test
Number
Test
Number
лйсͨтрйͨплмрϝϝϝͨωϕϔϔϋωϚϋϔύϘͨωϕϓ
The Grove
20001
Still Water Equity
Hill and Son Excavation
Jul 10, 2020 L. Camarillo
1:30 PM 5:00 PM
10483
636 2243
12~3' below finished grade. 4.9
123
95%
Waterline backfill, ~40' e of fire hydrant near nw corner of
Building 6.
~1' below finished grade.
Native Soil
96%
123.3
10.3
118.9
131.1
97%
123.3
5.1
119.8
125.9
Native Soil
~2' below finished grade.
Waterline backfill e of Barn, ~60' n of fire hydrant near nw
corner of Building 4.
Eli Jenkins Digitally signed by Eli Jenkins
Date: 2020.07.14 07:12:13
-06'00'
12
12
1
117
122.5Waterline backfill, between Building 7 and Building 6.
Native Soil
2
3