Loading...
HomeMy WebLinkAboutCONCRETE TEST 3 - 19-00740 - Blackoak 20 Units - Bldg 5 - Southern slabProject Name: Client: Mix Number: Project Number: Ticket Number: Load Amount: Admixtures: Tested By: Date and Time: Compressive Strength of Concrete Test Specimens Field Test Data: (ASTM C143, C138, C173, C231, C31, C1064, and C511) Slump (Inches): Entrained Air (%): Concrete Temperature: Ambient Temperature: Test Results:Minimum:Maximum: Cylinder # Lab Test Data: (ASTM C39, C42, C617, and C1231) Break Age Cylinder Diameter (in) Area (in² ) Break Date Maximum Load (lbs) Break Type Compressive Strength (psi)Required 28 day Strength (psi) °F °F Reviewed By: Supplier: Test Location: Unit Weight (PCF):Set # : Cylinders Picked Up By: Date and Time: Hi / Low Temperatures Remarks: 28-day Average Strength The Grove Still Water Equity Partnership 170 TF 20001 15259 30/40 cy MS AC 534, MP 322 L. Camarillo 07-01-2020 9:30 AM 8 1.5 64.5 62.7 4 8 166A 166E 166C 166B 166D 4 07/08/20 07/29/20 07/29/20 07/29/20 41,890 6 3,5003,33212.57 Walters Ready Mix, Inc Southern slab on building 5. 7 28 28 28 H Concrete cylinders are located near the south end of building 5. NA 1 of 1 F. Pelton 07/02/2020 9AM