HomeMy WebLinkAboutCONCRETE TEST 3 - 19-00740 - Blackoak 20 Units - Bldg 5 - Southern slabProject Name:
Client:
Mix Number:
Project Number:
Ticket Number:
Load Amount:
Admixtures:
Tested By:
Date and Time:
Compressive Strength of Concrete Test Specimens
Field Test Data: (ASTM C143, C138, C173, C231, C31, C1064, and C511)
Slump (Inches):
Entrained Air (%):
Concrete Temperature:
Ambient Temperature:
Test Results:Minimum:Maximum:
Cylinder #
Lab Test Data: (ASTM C39, C42, C617, and C1231)
Break Age
Cylinder
Diameter (in)
Area
(in² )
Break
Date
Maximum Load
(lbs)
Break
Type
Compressive
Strength (psi)Required 28 day
Strength (psi)
°F
°F
Reviewed By:
Supplier:
Test Location:
Unit Weight (PCF):Set # :
Cylinders Picked Up By: Date and Time:
Hi / Low Temperatures
Remarks:
28-day Average Strength
The Grove
Still Water Equity Partnership
170 TF
20001
15259
30/40 cy
MS AC 534, MP 322
L. Camarillo
07-01-2020 9:30 AM
8
1.5
64.5
62.7
4 8
166A
166E
166C
166B
166D
4 07/08/20
07/29/20
07/29/20
07/29/20
41,890 6 3,5003,33212.57
Walters Ready Mix, Inc
Southern slab on building 5.
7
28
28
28
H
Concrete cylinders are located near the south end of
building 5.
NA 1 of 1
F. Pelton 07/02/2020 9AM