HomeMy WebLinkAboutCONCRETE SPECIAL INSPECTION 1 - 20-00187 - 266 W 3rd S, 1 - Sundance West Side bld AProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Sundance Apartments
20016
Steven's Construction
Lane Webb Concrete 6/30/2020
Overcast
2:00 PM
51
4:00 PM
I arrived on site and began my observations for the Concrete placement and the concrete reinforcement for
the North East Corner of Building A. I observed the reinforcement was in general conformance to project
documents. upon testing the concrete for Air, the results were high. I informed the contractor, and the
contractor determined to continue placement. I finished the required tests and observed the remainder
were in general conformance to project documents. I observed the contractor consolidate the concrete with
a mechanical vibrator for the duration of the pour. I observed the contractor was in general conformance to
project documents.
Eli Jenkins Digitally signed by Eli Jenkins
Date: 2020.07.01 10:22:31
-06'00'8129697
Reinforcement Reinforcement
E. Jenkins
Page 2 of 2