HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 2 - The Grove at Thomson FarmsProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Thompson Farms
20001
Stillwater Equity Partners
Kevin Virgin Concrete 1/16/2020
P/ Cloudy
11:30 AM
26
3:30 PM
I arrived on site as directed by the contractor for the scheduled concrete pour at 12:00 PM. Upon arriving
Don Thorp, Headwaters informed me that the concrete was going to delayed so the earthwork contractor
could finish backfilling for the next section of footings. I stayed on site and performed density testing and
observation of the structural fill for the footings. Passing density tests were recorded. The concrete arrived
at 2:30 PM. I observed the reinforcement for the foundation walls along grid lines A-B:1-4. I observed that
the contractor had placed the reinforcement in general conformance with the project documents. I
observed the contractor pump the concrete into place and consolidate with a mechanical vibrator. I notified
the contractor of my observations and test results prior to leaving.
Digitally signed by Jacob P Christensen
Date: 2020.01.17 12:32:01 -07'00'8129697
J. Christensen
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments: