Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 2 - The Grove at Thomson FarmsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Thompson Farms 20001 Stillwater Equity Partners Kevin Virgin Concrete 1/16/2020 P/ Cloudy 11:30 AM 26 3:30 PM I arrived on site as directed by the contractor for the scheduled concrete pour at 12:00 PM. Upon arriving Don Thorp, Headwaters informed me that the concrete was going to delayed so the earthwork contractor could finish backfilling for the next section of footings. I stayed on site and performed density testing and observation of the structural fill for the footings. Passing density tests were recorded. The concrete arrived at 2:30 PM. I observed the reinforcement for the foundation walls along grid lines A-B:1-4. I observed that the contractor had placed the reinforcement in general conformance with the project documents. I observed the contractor pump the concrete into place and consolidate with a mechanical vibrator. I notified the contractor of my observations and test results prior to leaving. Digitally signed by Jacob P Christensen Date: 2020.01.17 12:32:01 -07'00'8129697 J. Christensen Page 2 of 2 Description: Description: Description: Description: Additional Comments: