Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION - The Grove at Thomson FarmsProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Thompson Farms 20001 Stillwater Equity Partners Kevin Virgin Concrete 1/9/2020 Cloudy 1:30 PM 24 2:30 PM I arrived on site and began my observations of the footing reinforcement along grid lines A-B:1-4. I observed that the contractor had placed the footing reinforcement in general conformance with the project documents. The contractor wet placed the vertical reinforcement for the foundations after the concrete was placed. I notified the contractor of my observations and test results prior to leaving. Digitally signed by Jacob P Christensen Date: 2020.01.17 11:29:35 -07'00'8129697 J. Christensen Page 2 of 2 Description: Description: Description: Description: Additional Comments: